Some project photos from today. I went to Trader Joe's and decided to go see what TxDot was up to.
Full sizes:
http://www.flickr.com/photos/fatguyinalittlecoat/635 westbound west of Hillcrest. Many bridges are replaced, and they've started building the outer lanes.

35E northbound before 635, direct connection ramps to 635 and Loop 12

SH 121 at SH 114 north of the airport

Through Grapevine... the inner express lanes look mostly done, they're working on the outer lanes I guess.

Direct connection ramps from SH 114 to SH 121 southbound. The northbound in the foreground, the southbound in the rear.

SH 121 southbound at Murphy (widening)

SH 121/183 westbound in Hurst. The structures are ramps for the express lanes to exit to the frontage roads.

SH 121/183 westbound in Hurst or Bedford. There will be 6 express lanes and 6-8 regular lanes. The new ROW is really wide, but it didnt photograph well.

Direct connection ramps for the express lanes onto IH 820 southbound and SH 121 southbound to downtown Ftw.


IH 820 is being rebuilt from SH 121/183 west to 35W.

New stack at 820 / 35W with express and regular ramps


Two new stretches of the SH 199 freeway to Azle opened this year, I think in May.


Overton Park Blvd at SH 121T / Chisholm Trail in southwest Ftw. The stack at IH 20 / 183 has a few of the pillars up, but there isnt really a place for photos of it.

SH 121T / Chisholm Trail follows Vickery Blvd in Fort Worth for a while, the viaduct over the railyards is mostly complete. This view looks east at Vickery and Hulen.

IH 30 eastbound at SH 161 in Grand Prairie


Phase 1 of Loop 121 / SH 114 in Irving looks done now, there are some new cement molds up for Phase 2 it looks like