Interstate 269
Steve:
--- Quote from: Grzrd on August 07, 2012, 08:18:36 PM ---
--- Quote from: Steve on August 07, 2012, 07:13:44 PM ---Now my question, which I don't think has an answer yet - Is this piece of I-269 what will finally get I-22 signed? (Or will the I-65 connection beat it to the punch?)
--- End quote ---
I'm hoping the answer is neither; since MAP-21 now allows signage of disconnected segments, all of Alabama's open segments are interstate grade, and most of Mississippi's segments are interstate grade (with the final three upgrade projects all expected to be completed by November 2013), then I hope to see applications from both ALDOT and MDOT for immediate signage in time for the November 15 AASHTO Special Committee on Route Numbering meeting. Why wait? I-22 signage by New Year's Day!
FTR - the I-22/I-269 interchange is targeted for a June 18, 2015 completion date, roughly eight months after the targeted October 15, 2014 completion date for the I-22/ I-65 interchange:
--- Quote ---Construction of SR 304/I-269 from Station 625+00 to Station 835+00, known as Federal Aid Project Nos. STP-0029-02(016) / 102556313 & STP-0029-03(008) / 102556314 in Desoto & Marshall Counties.
Project Completion: 06/18/2015
--- End quote ---
--- End quote ---
Here, take one of my Internets. You deserve it. Thank you.
Grzrd:
--- Quote from: Grzrd on August 06, 2012, 03:59:31 PM ---
--- Quote from: Grzrd on July 06, 2012, 09:45:13 PM ---TDOT's August 3 letting includes the 2.667 mile section of I-269 from the Mississippi state line to TN 385. It will be for grading, drainage, construction of bridges, and paving with an estimated completion date of April 30, 2015 (page 4/8 of pdf)
--- End quote ---
I hope that it is only a short-term delay, but the August 3 Apparent Bid Results indicate that the above project was withdrawn from the letting (page 5/13 of pdf)
--- End quote ---
Good news from TDOT is that the I-269 project to the Mississippi state line is now advertised in the September 14 letting (page 4/10 of pdf):
--- Quote ---FAYETTE AND SHELBY COUNTIES (Contract No. CNL024) Call No. 014
Project No. NH-I-269(23), 79469-3108-44, 24469-3105-44
The grading, drainage, construction of three (3) welded steel plate girder bridges, two (2) concrete Bulb-Tee beam bridges and
paving on I-269 beginning at the Mississippi State line and extending to S.R. 385.
Project Length - 2.667 miles
Completion Time - On or before April 30, 2015
Plans Cost - $200.00 Cross-Section Cost - $100.00
The DBE goal for this contract is 8.5%.
--- End quote ---
--- Quote from: Grzrd on July 06, 2012, 09:45:13 PM ---TDOT's August 3 letting .... the paving project for the final 8.294 miles of the TN 385 section of I-269 will be let on August 3 (page 7/8 of pdf)
--- End quote ---
Also, TDOT recently awarded the paving project for the final 8.294 miles of the TN 385 section of I-269 (page 12/13 of pdf):
--- Quote ---Call 034 Contract CNL263 Project NH‐I‐269(19), 79469‐3106‐44, 24269‐3104‐44 County SHELBY & FAYETTE
THE PAVING ON I‐269(SR 385) FROM SR 57(POPLAR AVE) TO SR 193 (MACON RD)
Contractor LEHMAN‐ROBERTS COMPANY
Total $21,620,390.89
Bid Estimate $21,709,418.10
--- End quote ---
--- Quote from: codyg1985 on July 07, 2012, 09:12:40 PM ---Looks like MDOT has "construction" for the section from Station 835+00 to Mason Rd up for the July 24th letting.
--- End quote ---
In addition, on August 14, MDOT awarded the above contract, MDOT's third I-269 project (page 1/2 of pdf):
--- Quote ---AWARDED SUBJECT TO CONCURRENCE BY THE FEDERAL HIGHWAY ADMINISTRATION
STP-0029-03(013) / 102556315
MARSHALL COUNTY - Construction of SR 304/I-269 from Station 835+00 to Mason Road
EUTAW CONSTRUCTION COMPANY, INC.
PO BOX 36
ABERDEEN, MS 39730
$31,999,237.02
--- End quote ---
--- Quote from: Grzrd on June 19, 2012, 04:56:47 PM ---MDOT awarded a contract for the second MS I-269 project ... subject to FHWA concurrence on June 12 (page 2/3 of pdf):
--- Quote ---STP-0029-02(014) / 102556312
DESOTO COUNTY - Grade & Bridge, 4-lanes on SR 304/I-269 from SR 305 to Coldwater River Bridge
JOE MCGEE CONSTRUCTION COMPANY, INC.
6609 STEVE LEE DRIVE LAKE, MS 39092
$39,998,460.65
--- End quote ---
--- End quote ---
Finally, to whet the appetite for future roadgeeking opportunities afforded by the above projects, this TV video report has some footage of construction equipment pushing some dirt around on the second MDOT I-269 project, in Desoto County. Can Memphis Road Meet II be too far off in the future?
NYYPhil777:
Something about I-22- for some time from 2010 to now US 78 was labeled as I-22 by Google Maps, now Google Maps left it as US 78 again.
rickmastfan67:
--- Quote from: NYYPhil777 on August 21, 2012, 10:07:31 PM ---Something about I-22- for some time from 2010 to now US 78 was labeled as I-22 by Google Maps, now Google Maps left it as US 78 again.
--- End quote ---
Yeah, Google loves to post "Future" interstates, especially if there is "Future Corridor" signage along said route. However, can't explain why the I-22 shields are gone now. Maybe somebody somehow sneaked an edit in that amazingly got past the reviewers there at Google to strip the I-22 shields till it's posted as an official Interstate.
Grzrd:
--- Quote from: Grzrd on August 21, 2012, 06:57:49 PM ---Good news from TDOT is that the I-269 project to the Mississippi state line is now advertised in the September 14 letting (page 4/10 of pdf)
--- End quote ---
TDOT has awarded the I-269 project from TN 385 to the Mississippi state line (page 5/14 of pdf):
--- Quote ---Call 014
Contract CNL024
Project NH-I-269(23), 79469-3108-44, 24469-3105-44
County FAYETTE & SHELBY
NEW CONSTRUCTION ON I-269 FROM MISS. STATE LINE TO SR-385 INCLUDING GRADING, DRAINAGE, 3 WELDED STEEL PLATE GIRDER BRIDGES, 2 CONCRETE BULB-TEE BEAM BRIDGES AND PAVING
Contractor Total Bid: DEMENT CONSTRUCTION COMPANY, LLC $41,093,395.62
Estimate: $40,458,437.50
--- End quote ---
Now the long wait begins for the next I-69 Corridor project in Tennessee ...