MODOT Contract Lettings

Started by mvak36, January 14, 2017, 04:40:27 PM

Previous topic - Next topic

mvak36

If anyone is traveling in the Independence area for the next month, you might want to avoid the I-70/I-470/MO291 interchange.

https://www.kansascity.com/news/local/article216370225.html
Counties: Counties visited
Travel Mapping: Summary


mvak36

#51
September 21, 2018 Letting: Bid Results. Bid Award Winners.

Notable Projects:
Job J1P3010 Route 148 NODAWAY County. Resurface and add shoulders from Iowa State line to US 71 near Maryville, the total length of improvement being 14.149 miles.
Job J2M0276 Route 63 ADAIR, MACON County. Pavement improvements from 1.2 miles south of Route KK near Kirksville to 0.5 miles north of Route DD near Macon, the total length of improvement being 20.917 miles.
Job J4S3284 Route 69 CLAY, PLATTE County. Grading, drainage, bridge and paving at Frontier Road in Northmoor, the total length of improvement being 0.094 miles.
Job J4P3295C Route 45 PLATTE County. Pavement marking from Route 45 at Riss Lake Dr. and Klamm Road, the total length of improvement being 0.546 miles.
Job J5P3212 Route 21, 32 WASHINGTON County. Resurface from Route 21 in Jefferson County to Route 32 in Iron County and Route 32 from Route 21 to Bismarck in St. Francis County, the total length of improvement being 41.045 miles.
Job J5P3246 Route 54 CAMDEN County. Pavement improvements from east of Key Largo to east of Route 5, the total length of improvement being 6.31 miles.
Job J5S3306 Route 100 OSAGE County. Slide repair along Route 100 just east of Chamois, the total length of improvement being 0.095 miles.
Job J7S3273 Route Loop 44 LAWRENCE County. Coldmill and resurface from I-44 at Route H to west of I-44 at Route 265 in Mt. Vernon, the total length of improvement being 2.88 miles.
Job J7P3374 Route 13 STONE County. Scour repair from North Connection of BUS 13 to .4 Miles South of Rte OO, the total length of improvement being 1.386 miles.Job J9P3501 Route 67 WAYNE County. Slide repair various locations along Rte. 67 in Wayne County, the total length of improvement being 0.316 miles.

The following five sets of projects were let as one project (for each set):
(1): Job J1I3186 Route Various BUCHANAN County. Bridge rehabilitation various bridge ramps in the Saint Joseph area, the total length of improvement being 0.53 miles.
(2): Job J1P3120 Route 36 BUCHANAN County. Bridge rehabilitation in various locations in St. Joseph, the total length of improvement being 0.229 miles.

(1): Job J4P3081E Route 58 CASS County. Resurface and ADA improvements from Route D to Dean/Avenue/Clint Drive in Belton, the total length of improvement being 4.512 miles.
(2): Job J4P3081H Route Y CASS County. Intersection improvements at MO 58 in Belton, the total length of improvement being 0.142 miles.

(1): Job J5S3268 Route Y, CC, HH PHELPS County. Chip seal Route Y from E To SME, Route CC from Route 63 to SEM, Route HH From E to SME, the total length of improvement being 14.795 miles.
(2): Job J5S3364 Route I- 44 Outer Rd PHELPS County. Resurface and guradrail on Arlington Road from Doolittle to 0.3 miles east of Gasconade River, the total length of improvement being 2.914 miles.

(1): Job J7P3130 Route 83 BENTON, HICKORY County. Resurface from Route 65 to Route 54 on Route 83 and from Route 65 to end of Route on Route MM, the total length of improvement being 32.325 miles.
(2): Job J7S3183 Route A ST CLAIR County. Resurface from Route 52 to Route 13, the total length of improvement being 16.938 miles.

(1): Job J9P3199 Route 60 CARTER County. Resurface from 0.4 miles west of Route y to Freemont, the total length of improvement being 0.581 miles.
(2): Job J9P3200 Route 60 CARTER County. Resurface at County Road 143 to Parsons Drive, the total length of improvement being 6.035 miles.   
Counties: Counties visited
Travel Mapping: Summary

mvak36

#52
October 19, 2018 Letting: Bid Results. Bid Award Winners.

Notable Projects:
Job J1I3017 Route I-35 HARRISON County. Resurfacing from Route N in Eagleville to Route 136 in Bethany, the total length of improvement being 13.944 miles.
Job J2S2176 Route 139 SULLIVAN County. Bridge replacement 0.6 miles south of Newton, the total length of improvement being 0.157 miles.
Job J2P3127 Route 24, 61 MARION County. Coldmill and resurface on eastbound and westbound lanes from 0.3 mile north of Route F to 3.0 miles east of Route 61 near Taylor, the total length of improvement being 29.183 miles.
Job J3I3047 Route 70 LAFAYETTE County. Resurface from Johnson Dr. to Route 13, the total length of improvement being 10.45 miles.
Job J4P3235 Route 92 CLAY County. ADA improvements from Route 33 to Marimack Drive, the total length of improvement being 0.525 miles.
Job J5P3258 Route 87 HOWARD County. Resurface from Glasgow to Route 40, the total length of improvement being 22.093 miles.
Job J5S3256 Route OR 44 LACLEDE County. Resurface North and South in Lebanon, the total length of improvement being 9.68 miles.
Job J5S3286 Route 87 COOPER, MONITEAU County. Microsurface from Route 5 at Boonville to Route O at California, the total length of improvement being 32.727 miles.
Job J6P2325 Route 370 ST CHARLES County. Bridge rehabilitation over Route 94, the total length of improvement being 0.113 miles.
Job J6I3384 Route I-70, I-170, I-55 VARIOUS County. Signing improvements various locations on I-70, I-170, and I-55 in St. Charles County, St. Louis County, St. Louis City, and Jefferson County, the total length of improvement being 20.09 miles.
Job J7P3132 Route 54, LP49 VERNON County. Resurface from Webster Street to I-49 and on Loop 49 through Nevada, the total length of improvement being 5.425 miles.
Job J9P3129 Route 49 IRON County. Bridge replacement over Big Creek, the total length of improvement being 0.404 miles. 

The following six sets of projects were let as one project (for each set):
(1): Job J5S3259 Route C COLE, MONITEAU, MORGAN County. Microsurface and resurface from Route 52 near Versailles to Route 54 in Jefferson City, the total length of improvement being 38.918 miles.
(2): Job J5S3311 Route 50 OR COLE County. Resurface at Route 50, Truman Blvd, Country Club and Big Horn Drive, the total length of improvement being 5.493 miles.

(1): Job J6M0268 Route 44/Maritz ST LOUIS County. Bridge rehabilitation over I-44 in Fenton, the total length of improvement being 0.01 miles.
(2): Job J6M0269 Route I-70 ST LOUIS CITY County. Bridge rehabilitation Adelaide Avenue Bridge over I-70, the total length of improvement being 0.01 miles.

(1): Job J6P3180 Route 141 ST LOUIS County. Coldmill and resurface from I-64 to n/o MO 30, the total length of improvement being 10.955 miles.
(2): Job J6P3200 Route 141 ST LOUIS County. Bridge rehabilitation off-ramp over Woods Mill Road and 141 over Rte 100, Grand Glaize Creek, BNSF RR, and Meramec River, the total length of improvement being 0.491 miles.

(1): Job J7P3139 Route 249 JASPER County. Coldmill and resurface from Route 171 in Carterville to 20th St. in Joplin, the total length of improvement being 7.599 miles.
(2): Job J7S3116 Route LP49 JASPER, NEWTON County. Coldmill and resurface from 10th St. in Webb City to 46th St. in Leawood, the total length of improvement being 6.664 miles.
(3): Job J7S3117 Route LP49 NEWTON County. Coldmill and resurface from south of 46th St. in Leawood to I-49, the total length of improvement being 6.358 miles.

(1): Job J8P3088C Route BUS65 CHRISTIAN County. Intersection improvements South St.,3rd St., & Selmore Rd., the total length of improvement being 0.569 miles.
(2): Job J8P3101 Route BUS 65 CHRISTIAN County. Grading and pavement from Route 65 to just west of Selmore/Route 14 intersection, the total length of improvement being 1.18 miles.

(1): Job J8S3082 Route YY GREENE County. Resurface and add shoulder from 0.2 mile east of Route 65 to Route 125, the total length of improvement being 4.658 miles.
(2): Job J8S3085 Route OR 65 GREENE County. Coldmill and resurface from Division to Sunshine (Eastgate and Ingram Mill), the total length of improvement being 3.286 miles.

EDIT: More projects were added to the letting
Job J5S3049B Route 94 MONTGOMERY County. Resurface from 0.2 mile east of Bluffton Road to Route 19 near McKittrick, the total length of improvement being 9.865 miles.

(1): Job J2I3096 Route I-72 MARION County. Resurface and diamond grinding from 0.2 mile west of Rte. 61 to the Mississippi River in Hannibal, the total length of improvement being 3.299 miles.
(2): Job J2P3128 Route 36 MARION County. Resurface eastbound lanes from 0.4 miles west of BUS. 36 at Monroe City to 0.9 miles east of Route H, the total length of improvement being 12.045 miles.
(3): Job J2P3129 Route 36 MARION County. Resurface and bridge rehabilitation on eastbound lanes from 1.8 miles east of Rte. 24 to Rte. 61 and on westbound lanes from Rte. 61 to 0.5 mile west of Rte. 61 in Hannibal, the total length of improvement being 5 miles.

(1): Job J2P3185 Route 15 MONROE, SHELBY County. Chip seal from 0.2 mile south of Route 36 to Route 154 north junction in Monroe County at Paris, the total length of improvement being 17.89 miles.
(2): Job J2P3190 Route 136 SCHUYLER County. Chip seal from Route 63 to Route A in Downing, the total length of improvement being 11.727 miles.
(3): Job J2P3191 Route 3 RANDOLPH County. Chip seal from Route 24 east junction to Route 129 in Roanoke, the total length of improvement being 9.076 miles.

(1): Job J2S3192 Route E LINCOLN County. Chip seal from Route UU in Silex to Route 61, the total length of improvement being 5.214 miles.
(2): Job J2S3193 Route H LINCOLN County. Chip seal from Route E south junction to Route 47 at Troy, the total length of improvement being 10.988 miles.

(1): Job J9P3196 Route 60 HOWELL County. Resurface from Mountain View to east of Birch Tree, the total length of improvement being 11.474 miles.
(2): Job J9P3202 Route 60 HOWELL County. Resurface from Route NN to County Road 1550, the total length of improvement being 5.338 miles.
(10): Job J3S3141 Route WW JOHNSON County. Seal coat from Route D to Henry CL, the total length of improvement being 7.043 miles.
(11): Job J3S3142 Route E PETTIS County. Seal coat from Route B to Route 52, the total length of improvement being 7.394 miles. 
Counties: Counties visited
Travel Mapping: Summary

mvak36

#53
MODOT recently upgraded their website so I am updating links to the Bid Results and Bid Award Winners lists.

Also, they're starting an Environmental study for the Buck O'Neil Bridge. https://www.modot.org/node/6555
QuoteA potential new river crossing to replace the John Jordan "Buck"  O'Neil Memorial Bridge has entered the next phase. The Missouri Department of Transportation (MoDOT) and the City of Kansas City, Missouri are working with the Federal Highway Administration (FHWA) to undertake an environmental study, which is required prior to rehabilitating or replacing the existing bridge. The study is being conducted by Burns & McDonnell in accordance with the National Environmental Policy Act (NEPA).

The environmental study will build on the recently completed planning and environmental linkages (PEL) study to further evaluate options to improve or potentially replace the U.S. 169 bridge over the Missouri River in Kansas City.

As part of the new study the team will evaluate potential impacts to historic structures, including the existing Buck O'Neil Bridge, and other resources in the study area such as public parks, open spaces, cultural assets, and people and businesses in and around the area.  This process is necessary to be in compliance with Section 106 of the National Historic Preservation Act, and as applicable Section 4(f) of the DOT Act.

The study, which is scheduled to conclude in late 2019, will require significant public input in the coming months. Two formal public meeting will be scheduled in 2019. Learn more about the study at www.modot.org/welcome-kansas-city-district

For more information about MoDOT news, projects or events, please visit our website at www.modot.mo.gov/kansascity. For instant updates, follow MoDOT_KC on Twitter, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT (275-6636).
Counties: Counties visited
Travel Mapping: Summary

mvak36

#54
November 16, 2018 Letting: Bid Results. Bid Award Winners.

Notable Projects:
Job J1P3188 Route 59 BUCHANAN County. Resurface from Route 752 in St. Joseph to north of Route 45, the total length of improvement being 13.608 miles.
Job J2P2217 Route 65, M LINN, LIVINGSTON County. Alternate Resurfacing from North of CR 228 to Route 36 interchange in Chillicothe and the intersection of Route M and MO 11 to north city limits of Brookfield, the total length of improvement being 1.056 miles.
Job J2P3132 Route 6 ADAIR, SULLIVAN County. Resurface From the Chariton River near Novinger to the east city limits of Green Castle and add rumble strips from the west city limits of Green Castle to Route 129 in Green City in Sullivan County, the total length of improvement being 14.46 miles.
Job J2P3134 Route 79 PIKE County. Resurface and shoulders from 0.9 mile south of Rte. 54 east junction in Louisiana to Lincoln County Line, the total length of improvement being 21.054 miles.
Job J2S3250 Route 81 CLARK, LEWIS County. Resurface from Route 136 in Clark County to Route 16 in Lewis County near Canton, the total length of improvement being 26.273 miles.
Job J3S3087 Route 23 JOHNSON County. Pavement improvements from Route DD to Route 2, the total length of improvement being 16.189 miles.
Job J4I3120 Route I-29 CLAY County. Coldmill and resurface from Vivion Road to I-29/35 split, the total length of improvement being 1.996 miles.
Job J4Q3234 Route Various CLAY, PLATTE County. ITS improvements in various locations in Clay and Platte counties, the total length of improvement being 56.8 miles.
Job J5P3214 Route Various CRAWFORD, IRON County. Microsurface and ADA improvements Rte. 19 & Rte. ZZ in Crawford Co. & Rte. 49 beginning in Crawford Co. and ending in Iron Co., the total length of improvement being 46.86 miles.
Job J5S3271 Route Various CAMDEN, MILLER County. Coldmill, resurface, microsurface and shoulder widening on various locations on Route KK, MM, 242 and Bus. Route 54 in Camden and Miller Counties, the total length of improvement being 7.949 miles.
Job J5P3197 Route 17 MILLER, PULASKI County. Microsurface from Route 42 to I-44 Spur and then from I-44 to Route 32, the total length of improvement being 49.122 miles.
Job J5P3186 Route 63, 133 OSAGE County. Intersection improvements just north of Westpahlia, the total length of improvement being 0.392 miles.
Job J6I3251 Route I-70 ST LOUIS County. Bridge painting over McKelvey Road and Route 141, the total length of improvement being 1.446 miles.
Job J7I3084 Route I-44 JASPER, NEWTON County. Coldmill and resurface from 0.4 miles east of Loop 49 in Joplin to 1.5 miles east of Route 37 in Sarcoxie, the total length of improvement being 37.43 miles.
Job J7P3355 Route 249 JASPER County. Job Order Contract for slide repairs from Rte. 171 in Carterville to Rte. VV (Zora Street) near Joplin, the total length of improvement being 2.314 miles.
Job J9S3294 Route 49 WAYNE County. Resurface from Rte. 34 to Rte. 67, the total length of improvement being 22.056 miles.

The following six sets of projects were let as one project (for each set):
(1): Job J1P3024 Route 5 CHARITON County. Resurface and shoulder widening from Route M to Route O south of Brookfield city limits, the total length of improvement being 19.506 miles.
(2): Job J1S3170B Route 129 CHARITON County. Resurface from Route W to Route PP near Salisbury, the total length of improvement being 7.24 miles.

(1): Job J4I3122 Route I-435 PLATTE County. Coldmill and resurface from I-29 South to west of Cookingham Drive, the total length of improvement being 5.19 miles.
(2): Job J4S3277 Route D PLATTE County. Coldmill and resurface from I-29 to Cookingham Dr, the total length of improvement being 1.413 miles. 

(1): Job J5P3114 Route 63 MARIES, PHELPS County. Coldmill, and resurface from north of Vichy to Rolla, the total length of improvement being 12.49 miles.
(2): Job J5P3233 Route 63 MARIES, OSAGE County. Coldmill and resurface from Route 50 to 4 miles south of Vienna, the total length of improvement being 26.74 miles.

(1): Job J5P3235 Route 63 BOONE County. Coldmill and resurface from Route F/22 Interchange to Route 763, the total length of improvement being 29.606 miles.
(2): Job J5S3159B Route 763 BOONE County. Coldmill and resurface from Bus Loop 70 to Stadium Blvd in Columbia, the total length of improvement being 2.024 miles.

(1): Job J7S3133 Route 160, 13 CHRISTIAN, STONE County. Resurface from 0.4 miles north of Finley Creek to Reeds Spring Junction and on Rte. 13 from Reeds Spring Junction to Table Rock Lake, the total length of improvement being 28.798 miles.
(2): Job J8P3051D Route 160 CHRISTIAN County. Resurface from South Street in Nixa to 0.4 miles north of Finley Creek., the total length of improvement being 3.191 miles.

(1): Job J9S3240 Route H SCOTT County. Resurface from Route 77 to Route U, the total length of improvement being 5.77 miles.
(2): Job J9S3406 Route E SCOTT County. Resurface from Route 77 to Commerce, the total length of improvement being 7.913 miles.
(3): Job J9S3438 Route 61 SCOTT County. Resurface from south of Route K to north of Route 77, the total length of improvement being 12.456 miles.

EDIT: Additional lettings added after the initial listing.
Job J7P3376 Route I-49 MCDONALD County. Demolition of structures from I-49 to the Arkansas state line, the total length of improvement being 5.006 miles.
Job J5S3053 Route 124 BOONE County. Bridge replacement over Grindstone Creek, the total length of improvement being 0.236 miles. 
Counties: Counties visited
Travel Mapping: Summary

mvak36

#55
December 14, 2018 Letting: Bid Results. Bid Award Winners.


Notable Projects:
Job J1S3055 Route 111 ATCHISON County. Bridge replacement over Mill Creek, 1 mile south of Route Z near Corning, the total length of improvement being 0.265 miles.
Job J1S3189 Route BUS 71 ANDREW County. Coldmill and resurface from Main Street in Savannah to south of I-29, the total length of improvement being 5.964 miles.
Job J1S3190 Route BUS 71, 59 ANDREW County. Microsurface from Route 71 north of Savannah to Loop 29 in Country Club, the total length of improvement being 7.317 miles.
Job J2P3228 Route 19 MONTGOMERY County. Slide repair at the southeast corner of the intersection with the I-70 south outer road near New Florence, the total length of improvement being 0.163 miles.
Job J4I3124 Route I-70 JACKSON County. Coldmill, resurfacing, and shoulder replacement from E/O Blue Ridge Cutoff to W/W Sterling Avenue, the total length of improvement being 1.217 miles.
Job J5S3247 Route I44 OR CRAWFORD County. Resurface from Rte. C in Bourbon to Rte. H, from Old Rte. 66 to Rte. UU and from Rte. UU to East Grand Street in Cuba, the total length of improvement being 11.65 miles.
Job J5S3372 Route 133 PULASKI County. Scour repair at Bridge A5835 over the Gasconade River, the total length of improvement being 0.027 miles.

The following six sets of projects were let as one project (for each set):
(1): Job J1P3077 Route 6 SULLIVAN County. Bridge replacement 0.5 mile east of Route P near Milan, the total length of improvement being 0.049 miles.
(2): Job J2P0470 Route 6 SULLIVAN County. Bridge replacement 1.3 miles west of Route Z near Humphreys, the total length of improvement being 0.137 miles.

(1): Job J2P3133 Route 54 PIKE County. Resurface from 0.1 mile east of Route U to Dougherty Pike in Louisiana, the total length of improvement being 15.835 miles.
(2): Job J2P3135 Route 54 AUDRAIN, PIKE, RALLS County. Resurface from Route 19 north junction to 0.1 mile east of Route U near Curryville, the total length of improvement being 21.222 miles.
(3): Job J2P3217 Route 54 AUDRAIN, PIKE County. ADA improvements on Routes 54, F, and W in Vandalia and Route 54 in Curryville, the total length of improvement being 1.391 miles.

(1): Job J5S3159 Route 763 BOONE County. ADA improvements from Bus Loop 70 to Route 740, the total length of improvement being 2.024 miles.
(2): Job J5S3218 Route 163 BOONE County. ADA improvements from Vandiver Dr to Route K, the total length of improvement being 1.667 miles.

(1): Job J9P2243 Route 63 TEXAS County. Resurface from Route 32 near Licking to Route E, the total length of improvement being 10.745 miles.
(2): Job J9P3117 Route 63 TEXAS County. Resurface from Route U to Route 60 in Cabool, the total length of improvement being 3.31 miles.
(3): Job J9P3120 Route 60 TEXAS, WRIGHT County. Resurface in the westbound lanes from Rte 95 to Rte. 60/63 interchange, the total length of improvement being 11.66 miles.

(1): Job J9P3126 Route 61 CAPE GIRARDEAU County. Bridge deck replacement over Cape LaCroix Creek, the total length of improvement being 0.1 miles.
(2): Job J9S3280 Route W SCOTT County. Bridge replacement over Drainage Ditch #289, the total length of improvement being 0.035 miles.
(3): Job J9S3286 Route NN CAPE GIRARDEAU County. Bridge replacement over Drainage Ditch #8, the total length of improvement being 0.08 miles.
(4): Job J9S3500 Route N SCOTT County. Culvert replacement 0.3 miles North of Route K, the total length of improvement being 0.095 miles.
(5): Job J9S3506 Route W CAPE GIRARDEAU County. Culvert extension 0.5 miles south of Route Y, the total length of improvement being 0.019 miles.

(1): Job J9S3271 Route 62 SCOTT County. Coldmill and resurface from Route 61 to Route H/AA, the total length of improvement being 2.515 miles.
(2): Job J9S3282 Route 61 SCOTT County. Coldmill and resurface 0.6 miles North of Route Y to Route 60, the total length of improvement being 3.31 miles.
(3): Job J9S3287 Route 114 NEW MADRID, SCOTT, STODDARD County. Coldmill and resurface from Route 60 to Route 61, the total length of improvement being 7.971 miles.
Counties: Counties visited
Travel Mapping: Summary

MikieTimT

Quote from: mvak36 on October 15, 2018, 09:21:16 AM
November 16, 2018 Letting:

EDIT: Additional lettings added after the initial listing.
Job J7P3376 Route I-49 MCDONALD County. Demolition of structures from I-49 to the Arkansas state line, the total length of improvement being 5.006 miles.
Job J5S3053 Route 124 BOONE County. Bridge replacement over Grindstone Creek, the total length of improvement being 0.236 miles.

Does this mean that Missouri is actually making forward progress on meeting Arkansas at the state line?

US71

MODOT Southwest District bid lettings for December 2018

Interstate 44 between Joplin and Sarcoxie: Resurface pavement
        Awarded to APAC-Central of Fayetteville, Ark., for a low bid amount of $8.8 million

Missouri Route 249 in Joplin: Repair erosion along shoulders
        Awarded to Leavenworth Excavating & Equipment of Leavenworth, Kan., for a low bid amount of $603,000

S. Route 160/Missouri Route 13 between Nixa and Kimberling City: Resurface pavement
        Awarded to APAC-Central of Fayetteville, Ark., for a low bid amount of $5.8 million

I-49 in McDonald County: Building removal for future I-49 lanes south of Pineville
        Awarded to Lehman Construction of California, for a low bid amount of $157,000

Various state routes in southwest Missouri: Pavement sealing
        Awarded to Hutchens Construction Company of Cassville, for a low bid amount of $2.5 million

Like Alice I Try To Believe Three Impossible Things Before Breakfast

intelati49

Quote from: US71 on December 05, 2018, 02:31:05 PM
Missouri Route 249 in Joplin: Repair erosion along shoulders
        Awarded to Leavenworth Excavating & Equipment of Leavenworth, Kan., for a low bid amount of $603,000

I'm not sure I **want** to know how many lettings I have read with this description. Ahh....

mvak36

#59
https://www.kansascity.com/news/politics-government/article222727595.html

QuoteThe federal government is kicking in a $25 million transportation grant to help replace the aging Buck O'Neil Bridge the city has been working to upgrade.

U.S. Congressman Sam Graves, R-Mo., announced the grant from the U.S. Department of Transportation grant in a press release Thursday afternoon. The federal government is kicking in a $25 million transportation grant to help replace the aging Buck O'Neil Bridge the city has been working to upgrade.

U.S. Congressman Sam Graves, R-Mo., announced the grant from the U.S. Department of Transportation grant in a press release Thursday afternoon.
Counties: Counties visited
Travel Mapping: Summary

mvak36

Counties: Counties visited
Travel Mapping: Summary

US71

Quote from: mvak36 on December 07, 2018, 08:50:40 AM
Looks like the new MO-47 Missouri River Bridge is open now. This project was funded by a TIGER grant back in 2014.

http://www.emissourian.com/local_news/washington/area-officials-attend-new-bridge-opening-want-focus-now-on/article_2436b894-f816-11e8-a018-3f05b15e5aee.html

Opened Monday.  On Saturday it was open for anyone who wanted to walk across it.
Like Alice I Try To Believe Three Impossible Things Before Breakfast

mvak36

#62
January 18, 2019 Letting: Bid Results. Bid Award Winners.

Notable Projects:
Job J1I3293 Route I-29 HOLT County. Bridge repair 3.4 miles south of Route W interchange, the total length of improvement being 0.008 miles.
Job J4I3119 Route I-470 JACKSON County. Coldmill and resurface at W/O Raytown Road to 39th Street, the total length of improvement being 13.095 miles.
Job J5I3362 Route I-44 CRAWFORD County. Slide repair EB on-ramp at Route C, J and N interchange in Bourbon, the total length of improvement being 0.023 miles.
Job J5P3361 Route 5 CAMDEN County. Slide repair from 2 miles N/o Rte. 54 to N/o Bus.5/Pier 31 Interchange, the total length of improvement being 0.09 miles.
Job J5P3375 Route 50 OSAGE County. Pavement improvements from Fourth Street to N. Twelfth Street in Linn, the total length of improvement being 0.883 miles.
Job J6I3166B Route I-270, I-70 ST LOUIS County. Pavement improvements along Ramp from SB I-270 to EB I-70, the total length of improvement being 0.825 miles.
Job J6S3134 Route 67 ST LOUIS County. Bridge replacement at Midland/Dorsett over Route 67 (Lindbergh), the total length of improvement being 0.192 miles.
Job J6S3245 Route 110 JEFFERSON County. Resurface and bridge rehabilitation from Route 21 to Route 67, Route CC from Route 67 to Spalding Road and over Fisher Branch, the total length of improvement being 6.106 miles.
Job J9P3311 Route 61, U NEW MADRID County. Resurface from Howardville I-55 overpass to Portageville I-55 overpass and from Route 61 and Route U intersection just south of CR 732, the total length of improvement being 14.632 miles.
Job J9P3407 Route 21 IRON, REYNOLDS County. Resurface from Route 49 east intersection to south of Centerville, the total length of improvement being 19.497 miles.
Job J9P3581 Route 34 CAPE GIRARDEAU County. Bridge rehabilitation over the Mississippi River, the total length of improvement being 0.131 miles.

The following five sets of projects were let as one project (for each set):
(1): Job J1S2166 Route KK DAVIESS County. Bridge rehabilitation 1 mile west of Route 69 near Altamont, the total length of improvement being 0.055 miles.
(2): Job J1S3059 Route 69 CLINTON County. Bridge rehabilitation over I-35, 4.4 miles south of Cameron, the total length of improvement being 0.084 miles.
(3): Job J1S3130 Route DD DAVIESS County. Bridge deck replacement 1 mile east of Route 69 near Pattonsburg, the total length of improvement being 0.049 miles.
(4): Job J1S3131 Route C DAVIESS County. Bridge deck replacement 0.8 mile east of Route 69 near Pattonsburg, the total length of improvement being 0.047 miles.
(5): Job J1S3141 Route B, N DAVIESS County. Bridge deck replacement 3.8 miles west of Rte. 13 near Coffey, the total length of improvement being 0.058 miles.

(1): Job J2P3236 Route 61 LINCOLN County. Intersection improvements at Route 61 and KK Intersection near Troy, the total length of improvement being 0.194 miles.
(2): Job J3P2213 Route 61 LINCOLN County. Bridge replacement 1.7 Miles north of Route 47 near Troy, the total length of improvement being 1.0591 miles.

(1): Job J4P3203 Route 291 CLAY County. Intersection improvements at Kansas Street from I-35 to Route 291, the total length of improvement being 0.423 miles.
(2): Job J4S3083 Route 152 CLAY County. Intersection improvements from Route 152 at I-35 interchange, the total length of improvement being 0.291 miles.
(3): Job J4S3299 Route Kansas Street CLAY County. Grading and paving from I-35 to Route 291, the total length of improvement being 0.555 miles.

(1): Job J4S3088 Route 169 CLAY County. Grading, drainage and paving from NW 68th Street to Englewood Road, the total length of improvement being 0.704 miles.
(2): Job J4S3088B Route 169 CLAY County. Drainage and pavement from 68th Street to Englewood Road to I-29, the total length of improvement being 0.416 miles.

(1): Job J1P3077 Route 6 SULLIVAN County. Bridge replacement 0.5 mile east of Route P near Milan, the total length of improvement being 0.049 miles.
(2): Job J2P0470 Route 6 SULLIVAN County. Bridge replacement 1.3 miles west of Route Z near Humphreys, the total length of improvement being 0.137 miles.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#63
February 15, 2019 Letting: Bid Results. Bid Award Winners.

Notable Projects:
Job J1L1800 Route 139 SULLIVAN County. ADA improvements 7.1 miles south of US 136 in Newtown, the total length of improvement being 0.569 miles.
Job J1P3146 Route 169 DEKALB County. Bridge replacement over Third Fork Platte River, 0.3 mile west of Rte. F near Union Star, the total length of improvement being 0.066 miles.
Job J2P2182 Route 24 CHARITON County. Bridge replacement over Mussel Fork River and the overflow bridge, 0.1 mile west of Keytesville, the total length of improvement being 0.583 miles.
Job J2M0276 Route 63 ADAIR, MACON County. Pavement repair from 1.2 miles south of Route KK near Kirksville to 0.5 mile north of Route DD near Macon, the total length of improvement being 20.917 miles.
Job J2P2194 Route 63 SCHUYLER County. Bridge replacement over North Fork Middle Fabius River 1.6 miles north of Route 136 near Lancaster, the total length of improvement being 0.121 miles.
Job J4P3266B Route I-435 JACKSON County. Bridge rehabilitations at I-470 and I-49, the total length of improvement being 2.591 miles.
Job J5S3178 Route 185 WASHINGTON County. Bridge rehabilitation over the Frouche Renualt Creek, 7 miles NW of Potosi, the total length of improvement being 0.08 miles. 
Job J5M0284 Route I-44 PHELPS County. High friction surface treatment near Rolla at Kingshighway, the total length of improvement being 0.46 miles.
Job J5M0285 Route I-70 BOONE County. High friction surface treatment from west of the Rte 63 Connector to the westbound Rte 63 Connector entrance ramp in Columbia, the total length of improvement being 0.48 miles.
Job J6I3266 Route I-270 ST LOUIS County. Bridge painting at the I-270/MO 370 Interchange, the total length of improvement being 1.656 miles.
Job J6P3184 Route 141 JEFFERSON, ST LOUIS County. Coldmill and resurface north of Route 30 to Route 61/67, the total length of improvement being 6.949 miles.
Job J7P0677 Route 32 CEDAR County. Bridge replacement 4.31 Miles West of Rte 39 West of Stockton, the total length of improvement being 0.792 miles.
Job J7P3187D Route 7 BENTON County. Intersection improvements at Commercial Street in Warsaw, the total length of improvement being 0.137 miles.
Job J7S3164 Route LP 49 JASPER County. ADA improvements from 10th St. in Webb City to north of I-44 in Joplin, the total length of improvement being 3.321 miles.
Job J4P3387 Route Various VARIOUS County. Sign installation at various locations in urban KC District, the total length of improvement being 41.86 miles. 

The following five sets of projects were let as one project (for each set):
(1): Job J1P3152 Route 136 PUTNAM County. Bridge deck replacement over Brush Creek, 0.6 mile west of Rte. F near Livonia, the total length of improvement being 0.024 miles.
(2): Job J1S3148 Route EE SULLIVAN County. Bridge deck replacement over Medicine Creek, 0.5 miles east of Route 139 near Newtown, the total length of improvement being 0.047 miles.
(3): Job J1S3149 Route ZZ SULLIVAN County. Bridge deck replacement over West Fork Locust Creek, near Harris, the total length of improvement being 0.026 miles.
(4): Job J1S3151 Route BB SULLIVAN County. Bridge deck replacement over Rooks Branch, 4.4 miles north of Rte. OO near Milan, the total length of improvement being 0.021 miles.

(1): Job J9P3262 Route 25 STODDARD County. Pavement improvement from Advance to Bernie, the total length of improvement being 29.655 miles.
(2): Job J9S3521 Route Y STODDARD County. Pavement improvement from Route 25 to Purina, the total length of improvement being 2.24 miles.

(1): Job J7P3065 Route 43 JASPER County. Intersection improvements intersection of Hearnes Blvd. at 32nd St. in Joplin, the total length of improvement being 0.049 miles.
(2): Job J7P3187B Route FF JASPER, NEWTON County. Intersection improvements at the intersection of Rte. FF and Indiana Ave in Joplin, the total length of improvement being 0.108 miles.
(3): Job J7P3187C Route FF JASPER, NEWTON County. Intersection Improvements the intersection of Route FF and Connecticut Ave, the total length of improvement being 0.091 miles.
(4): Job J7S3131 Route FF JASPER County. Coldmill, resurface and shoulders from Route 43 to I-49 in Joplin, the total length of improvement being 4.56 miles.

(1): Job J7S3137 Route F GREENE County. ADA improvements from north of Main Street to south of Main Street, the total length of improvement being 0.057 miles.
(2): Job J8S3078 Route OR 65 GREENE County. ADA improvements on various routes in Greene county, the total length of improvement being 2.534 miles.

(1): Job J8P3079B Route 65 GREENE County. Guardrail improvements from 0.3 mile north of Rte. D to Rte. 60 in Springfield, the total length of improvement being 4.064 miles.
(2): Job J8P3080 Route 65 GREENE County. Pavement improvements from 0.5 mile south of Rte. D to Rte. 60 in Springfield, the total length of improvement being 2.985 miles. 
Counties: Counties visited
Travel Mapping: Summary

mvak36

This was from a few weeks ago, but Gov. Parson is proposing $350 million in bonds to repair or replace bridges around the state. If it passes, this is the list of bridges they plan on working on.
Counties: Counties visited
Travel Mapping: Summary

skluth

Quote from: mvak36 on January 29, 2019, 11:59:45 AM
This was from a few weeks ago, but Gov. Parson is proposing $350 million in bonds to repair or replace bridges around the state. If it passes, this is the list of bridges they plan on working on.

I see that once again the St Louis area is mostly ignored. St Louis City and County combined make about 1/4 of Missouri's population. It has huge infrastructure deficiencies. Yet there are only four total projects out of 229 and $15M out of $344M.

mvak36

Quote from: skluth on January 29, 2019, 01:09:23 PM
Quote from: mvak36 on January 29, 2019, 11:59:45 AM
This was from a few weeks ago, but Gov. Parson is proposing $350 million in bonds to repair or replace bridges around the state. If it passes, this is the list of bridges they plan on working on.

I see that once again the St Louis area is mostly ignored. St Louis City and County combined make about 1/4 of Missouri's population. It has huge infrastructure deficiencies. Yet there are only four total projects out of 229 and $15M out of $344M.

Looks like the KC Star wasn't happy with how Kansas City got shortchanged too.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#67
March 15, 2019 Letting: Bid Results. Bid Award Winners.

Notable Projects:
Job J2P3157 Route 54 AUDRAIN County. Grading, pavement and drainage at intersection with Rte. BB and Rte. 19 (Scott's Corner) south of Laddonia, the total length of improvement being 0.35 miles.
Job J2S3194 Route Various MONROE, RANDOLPH County. Bridge painting on Route 3 and Route C over Chariton River in Randolph County and Route AA over Bee Creek in Monroe County, the total length of improvement being 0.172 miles.
Job J5P3015 Route Dix Road COLE County. Bridge rehabilitation from route 50 and 0.23 miles north of Business 50 (Missouri Blvd), the total length of improvement being 0.547 miles.
Job J5P3287 Route 63, AC BOONE, CALLAWAY County. Bridge rehabilitation from Route AC to 3 miles north of Route 54 near Jefferson City, the total length of improvement being 21.624 miles.
Job J5P3373 Route 50 GASCONADE County. Scour repair over the Gasconade River near Mount Sterling, the total length of improvement being 0.164 miles.
Job J5P3377 Route 52 MILLER County. Grading and pavement 1 mile west of Route Y near Eldon, the total length of improvement being 0.367 miles.
Job J5S3173 Route 179 COOPER County. Bridge replacement over Petite Saline Creek, near Wooldridge, the total length of improvement being 0.081 miles.
Job J6I3410 Route I-70 ST CHARLES County. Drainage repair west of Mid Rivers Mall Drive Interchange, the total length of improvement being 0.04 miles.
Job J6M0270 Route I-70 ST CHARLES County. Pavement crack filling in the WBL from e/o Mid Rivers Mall Drive to Fifth Street, the total length of improvement being 6.767 miles.
Job J6P3253 Route 141 ST LOUIS County. Signal replacement from north of I-70 to south of MO 370, the total length of improvement being 2.132 miles.
Job J6S3207 Route 47 FRANKLIN County. Resurface and ADA improvements from East 3rd Street to Norwood Trailer Court, the total length of improvement being 1.521 miles.
Job J6S3230 Route 115 ST LOUIS CITY County. Signal replacement from Euclid to N. Florissant, the total length of improvement being 2.73 miles.
Job J6S3375 Route 30 JEFFERSON County. Slide repair west of Ottomeyer Road, the total length of improvement being 0.11 miles.
Job J7P2173 Route 60 BARRY County. Bridge deck replacement 0.3 miles east of Route 37 in Monett, the total length of improvement being 0.344 miles.
Job J9P3357 Route 61 CAPE GIRARDEAU County. Resurface 0.3 miles south of Route I-55 to Route 34/Route 25, the total length of improvement being 3.611 miles.
Job J9P3247 Route 60, 67 BUTLER, CARTER, MADISON, SHANNON County. Slope repair at various locations along Route 67 and Route 60, the total length of improvement being 59 miles.
Job J9P3252 Route 142 OREGON, RIPLEY County. Resurface from Route EE to 0.2 miles west of Route 160, the total length of improvement being 34.66 miles.

The following seven sets of projects were let as one project (for each set):
(1): Job J2P3273 Route 79 MARION County. Bridge painting over Lyon Street and Warren Barrett Drive 0.4 mile north of Route T in Hannibal, the total length of improvement being 0.171 miles.
(2): Job J2S3271 Route Reservoir Street MARION County. Bridge painting over Route 79 (Mark Twain Avenue) 0.7 mile south of Route 36 in Hannibal, the total length of improvement being 0.045 miles.
(3): Job J2S3272 Route A MARION County. Bridge painting over Troublesome Creek 0.6 mile south of Route P near Hester, the total length of improvement being 0.042 miles.

(1): Job J2S3070 Route PP MACON County. Bridge replacement over Winn Branch 1 mile west of Rte. V near Macon, the total length of improvement being 0.09 miles.
(2): Job J2S3142 Route 151 SHELBY County. Bridge replacement over Black Creek 0.1 mile north of Rte. M near Leonard, the total length of improvement being 0.08 miles.

(1): Job J5P3363 Route 54 CALLAWAY County. Slide repair 2.3 miles north of Route J at Hillers Creek, the total length of improvement being 0.023 miles.
(2): Job J5S3370 Route 94 CALLAWAY County. Slide repair 3.1 miles East of Portland, the total length of improvement being 0.019 miles.

(1): Job J6P3316 Route 79 ST CHARLES County. Bridge rehabilitations in various locations in the St. Louis District, the total length of improvement being 0 miles.
(2): Job J6S3299 Route 79 ST CHARLES County. Bridge rehabilitation on Salt River Road in St. Charles County, the total length of improvement being 0.091 miles.

(1): Job J7P2228B Route 76 STONE County. Bridge deck replacement over Table Rock Lake near Cape Fair, the total length of improvement being 0.354 miles.
(2): Job J7P3289 Route 248 STONE County. Bridge replacement over Railey Creek, the total length of improvement being 0.097 miles.

(1): Job J9I3306 Route I-57 MISSISSIPPI, SCOTT County. Resurface from Route AA to County Road 401, the total length of improvement being 14.891 miles.
(2): Job J9P3201 Route 60 NEW MADRID, SCOTT County. Resurface from Route 61 to Route AA, the total length of improvement being 2.453 miles.

(1): Job J9L19TRA Route Trail of Tears CAPE GIRARDEAU County. Resurface in Trail of Tears State Park, the total length of improvement being 5.835 miles.
(2): Job J9S3365 Route OR 55 CAPE GIRARDEAU County. Resurface from end of state maintenance to Route 61, the total length of improvement being 3.924 miles.

(1): Job J6S3141 Route 109 ST LOUIS County. Bridge rehabilitation over Route 100, the total length of improvement being 0.104 miles.
(2): Job J6S3141B Route 109 ST LOUIS County. Add roundabout at Route 100, the total length of improvement being 0.3492 miles.
(3): Job J6S3141C Route 109 ST LOUIS County. Add bicycle/pedestrian trail s/o Route 100 to Cambury Lane, the total length of improvement being 0.281 miles.
(4): Job J6S3141D Route 109 ST LOUIS County. Add roundabout at Main Street, the total length of improvement being 0.19 miles.
Counties: Counties visited
Travel Mapping: Summary

US71

Quote from: mvak36 on February 10, 2019, 07:06:56 PM
[Job J7P2173 Route 60 BARRY County. Bridge deck replacement 0.3 miles east of Route 37 in Monett, the total length of improvement being 0.344 miles.

EB or WB ? If memory serves correct, that bridge was widened sometime within 10 years.
Like Alice I Try To Believe Three Impossible Things Before Breakfast

mvak36

Quote from: US71 on February 10, 2019, 09:04:03 PM
Quote from: mvak36 on February 10, 2019, 07:06:56 PM
[Job J7P2173 Route 60 BARRY County. Bridge deck replacement 0.3 miles east of Route 37 in Monett, the total length of improvement being 0.344 miles.

EB or WB ? If memory serves correct, that bridge was widened sometime within 10 years.

Someone feel free to correct me on this since I'm not sure if I understood the plans correctly, but it looks like the Westbound bridge (Bridge L0214).
Counties: Counties visited
Travel Mapping: Summary

mvak36

https://www.kctv5.com/news/modot-to-begin-work-on-i--and-i-/article_0c1abba8-3c58-11e9-843d-435c08011c65.html
QuoteKANSAS CITY, MO (KCTV) -- The Missouri Department of Transportation is replacing bridges within the I-435 and I-70 interchange, which will begin this month and will keep ramps closed until December of next year.

Construction begins on the I-435 and I-70 interchange on Thursday, March 7.

MoDOT said improvements include full bridge replacements, removal of left exits, improvements to loop ramp configuration, and crash reduction.

According to MoDOT, the new configuration will be a "partial turbine"  and provide a chance to make additional safety improvements.

The construction will take two full construction seasons to complete, so drivers can expect to see significant ramp closures and lane width reductions.

On Thursday, March 7 and Friday, March 8 at 9 a.m., crews will close the right lane of eastbound I-70 from 18th Street to Cleveland Ave. until about 3 p.m. both days to stage signs, equipment, and detour routes.

MoDOT said crews will close the following ramps this March and keep them closed until December 2020:

    Westbound I-70 loop ramp to southbound I-435
        The signed detour will use westbound I-70 to Manchester to turn around on eastbound I-70 to southbound I-435.
    Eastbound I-70 loop ramp to northbound I-435
        The signed detour will use US 40 starting near 31st Street to northbound I-435.
    On-ramp from Manchester to westbound I-70.
    I-70 eastbound exit ramp to Manchester.

Throughout the project, traffic will be most impacted along:

    Northbound I-435 to westbound I-70
    Southbound I-435 to eastbound I-70
    Blue Ridge Cutoff


Project Site: https://www.modot.org/i-435-and-i-70-interchange
Counties: Counties visited
Travel Mapping: Summary

Revive 755

Quote from: mvak36 on February 10, 2019, 07:06:56 PM
Job J6P3253 Route 141 ST LOUIS County. Signal replacement from north of I-70 to south of MO 370, the total length of improvement being 2.132 miles.

Interesting how the plan cover sheets shows St.Charles Rock Road as MO 180 near MO 141.  Back when St. Charles Rock Road was under MoDOT's jurisdiction, MO 180 always ended near I-270.

mvak36

Quote from: mvak36 on December 11, 2018, 12:01:35 PM
(1): Job J4P3203 Route 291 CLAY County. Intersection improvements at Kansas Street from I-35 to Route 291, the total length of improvement being 0.423 miles.
(2): Job J4S3083 Route 152 CLAY County. Intersection improvements from Route 152 at I-35 interchange, the total length of improvement being 0.291 miles.
(3): Job J4S3299 Route Kansas Street CLAY County. Grading and paving from I-35 to Route 291, the total length of improvement being 0.555 miles.

Article about the upcoming project in Liberty: https://www.kansascity.com/news/local/article227380354.html
Counties: Counties visited
Travel Mapping: Summary

kphoger

Quote from: mvak36 on March 12, 2019, 02:23:24 PM
Quote from: mvak36 on December 11, 2018, 12:01:35 PM
(1): Job J4P3203 Route 291 CLAY County. Intersection improvements at Kansas Street from I-35 to Route 291, the total length of improvement being 0.423 miles.
(2): Job J4S3083 Route 152 CLAY County. Intersection improvements from Route 152 at I-35 interchange, the total length of improvement being 0.291 miles.
(3): Job J4S3299 Route Kansas Street CLAY County. Grading and paving from I-35 to Route 291, the total length of improvement being 0.555 miles.

Article about the upcoming project in Liberty: https://www.kansascity.com/news/local/article227380354.html

I'm looking forward to using this when it's done.
Keep right except to pass.  Yes.  You.
Visit scenic Orleans County, NY!
Male pronouns, please.

Quote from: Philip K. DickIf you can control the meaning of words, you can control the people who must use them.

mvak36

#74
April 19, 2019 Letting: Bid Results. Bid Award Winners.

Notable Projects:
Job J1P3103 Route 169 CLINTON County. Bridge replacement over Castile Creek, 1 mile south of Gower, the total length of improvement being 0.195 miles.
Job J1I3238 Route I-29 ANDREW, ATCHISON, BUCHANAN County. Sign installation from the Iowa state line to Platte county, the total length of improvement being 91.3 miles.
Job J2P2217 Route 65, M LINN, LIVINGSTON County. Resurface 0.18 miles north of Co. Rd 228 to Rte. 36 and 0.06 miles north of Brookfield City limits to intersection of Route 11 and Route M, the total length of improvement being 5.336 miles.
Job J3I2195 Route I-70 MONTGOMERY County. Bridge replacement of westbound bridge over Loutre River 2.2 miles west of Rte. 161 near Danville, the total length of improvement being 0.577 miles.
Job J3P3113 Route 50 JOHNSON County. Intersection improvements at Routes AA, 1752, 1801 and W/Z, the total length of improvement being 2.585 miles.
Job J5P3376 Route 54 CAMDEN County. Bridge rehabilitation at the Niangua Arm of the Lake of the Ozarks west of Camdenton, the total length of improvement being 0.237 miles.
Job J6S3379 Route 94 ST CHARLES County. Add J-Turns from O' Fallon Rd. to Wolfrum Rd. in Weldon Spring, the total length of improvement being 1.74 miles.
Job J6S3265 Route 115 ST LOUIS County. Signal and ADA improvements from I-70 to I-170, the total length of improvement being 1.242 miles.
Job J7P2228D Route 160 BARTON County. Bridge replacement from 2.6 miles east of Route J to 0.1 miles west of Route I-49 in Lamar, the total length of improvement being 0.282 miles.
Job J8S3110 Route LP44 GREENE County. Bridge rehabilitation over BNSF Railway between Washington and National, the total length of improvement being 0.191 miles.
Job J8P3137 Route 60, 65 CHRISTIAN, GREENE County. Add intelligent transportation system equipment at various locations in the urban Southwest District, the total length of improvement being 15.8 miles.
Job J0S3019J Route 32 STE GENEVIEVE County. ADA improvements at various locations in Ste. Genevieve, Perryville, Frohna, Whitewater, and Delta, the total length of improvement being 3.438 miles.
Job J9M0276 Route 67, 60 BUTLER County. Conduit and pull box installation from Rte. W on BR 67 to 2nd Street on BR 60 in Poplar Bluff, the total length of improvement being 3.442 miles.

The following three sets of projects were let as one project (for each set):
(1): Job J2S3172 Route C MACON County. Pavement and ADA improvements in Bevier, the total length of improvement being 0.519 miles.
(2): Job J2S3223 Route 149 MACON County. ADA improvements from Trailer Court Lane to Delmar Place in New Cambria, the total length of improvement being 0.488 miles.

(1): Job J2I3225 Route I-70 MONTGOMERY, WARREN County. Sign improvements at various ramp locations, the total length of improvement being 33 miles.
(2): Job J5I3303 Route Various BOONE, CALLAWAY, COOPER County. Sign improvements at various ramp locations, the total length of improvement being 71.895 miles.

(1): Job J9S3275 Route DD STODDARD County. Bridge replacement from 2.25 miles NE of Route Y to 2.39 miles near Vanduser, the total length of improvement being 0.142 miles.
(2): Job J9S3281 Route 77 SCOTT County. Bridge replacement over North Cut Ditch north of Diehlstadt, the total length of improvement being 0.19 miles.


Edit: Additional April Lettings due to floods, etc.,
April 24, 2019 Letting: Bid Results. Bid Award Winners.

Notable Projects:
(1): Job J1P3335 Route 136 ATCHISON County. Debris removal from Missouri River Bridge to jest west of interchange of Route 136 & I-29, the total length of improvement being 4.82 miles.
(2): Job J1P3337 Route 136 ATCHISON County. Emergency repair from Missouri River Bridge to just west of interchange of Route 136 and I-29, the total length of improvement being 4.82 miles.

(1): Job J1P3336 Route 159 HOLT County. Debris removal from Missouri River Bridge to 1 mile e/o Route P near Fortescue, the total length of improvement being 5.252 miles.
(2): Job J1P3338 Route 159 HOLT County. Emergency repairs from the Missouri River Bridge to 1 mile e/o Route P near Fortescue, the total length of improvement being 5.252 miles.

April 30, 2019 Letting: Bid Results. Bid Award Winners.

Notable Projects:
(1): Job J1S3339 Route 118 HOLT County. Debris removal from Route 111 to Bridge over Little Tarkio Creek, the total length of improvement being 1.861 miles.
(2): Job J1S3340 Route 118 HOLT County. Emergency repair from Route 111 to Bridge over Little Tarkio Creek, the total length of improvement being 1.861 miles. 