I drove down to Birmingham today to check out the progress on the I-22/I-65 interchange. Work has been moving along at a steady rate.
One of the main reasons for me going is to scope out potential vantage points for a possible road meet this fall. I will post another thread in the Road Meet forum with details on that.
Here are some pictures I captured during the trip.
Looking along I-65 NB. Bridge construction adjacent to the NB lanes are for future lanes that will serve as both collector/distributor lanes and NB lanes. The current NB lanes will become the future SB lanes, and the current SB lanes will become the SB collector/distributor lanes. These bridges cross the Norfolk Southern railroad.

I-65 NB close to where the flyovers will "converge." The tall pier on the right will be the flyover from EB I-22 to NB I-65. Bridge construction adjacent to the roadway is for the lanes referred to above. These bridges will pass over I-22.

This view looks east from a dead-end street along I-22 towards the interchange with I-65. The ramp on the right will lead up to both I-65 north and south.

Closeup of the pier under construction from above:

Current end of grading for I-22 itself. Past the barricades it will bridge over the railroad and then pass underneath I-65.

Piers for the ramp from SB I-65 to WB I-22 that will pass over the railroad.

Looking from 47th Avenue North, the new bridge is now open to traffic on the right and the old one on the left is being demolished. A new bridge is necessary to accommodate the new lanes being built to the east of current I-65.

Looking south along what will be the future NB main lanes and collector/distributor lanes for I-65. This looks from the 47th Ave N overpass over I-65.

Grading for the ramp from I-65 SB to I-22 WB.

These signs will need to be relocated...

Looking south along I-65 from the 47th Avenue N overpass:

Closeup of the bent construction for the flyover from EB I-22 to NB I-65: