Regional Boards > Ohio Valley

Kentucky

<< < (67/70) > >>

XamotCGC:
What kind of font is on the Bardstown/Louisville distance sign? 

https://www.google.com/maps/@37.6916036,-85.2350549,3a,15y,296.21h,86.45t/data=!3m7!1e1!3m5!1soeobIvNGgFREgcIggSsFLQ!2e0!5s20130601T000000!7i13312!8i6656

hbelkins:

--- Quote from: XamotCGC on June 14, 2022, 02:44:22 PM ---What kind of font is on the Bardstown/Louisville distance sign? 

https://www.google.com/maps/@37.6916036,-85.2350549,3a,15y,296.21h,86.45t/data=!3m7!1e1!3m5!1soeobIvNGgFREgcIggSsFLQ!2e0!5s20130601T000000!7i13312!8i6656

--- End quote ---

That's a standard font that most KYTC districts used to make such signs for years. The letters were cut out of white reflective material and applied to the green sheeting. Now, most districts use a laser trimming method whereby there's a thin green sheet overlaying a white reflective sheet on the sign blank, and the letter shapes are cut with the laser and then peeled off.

XamotCGC:
https://www.myq104.com/2022/06/07/gov-beshear-presents-855000-to-construct-new-bridge-on-u-s-68-in-marion-county/

I'm curious how this is going to work exactly.

This is the area the article is referring to.

https://www.google.com/maps/@37.5757677,-85.2325445,3a,82.6y,145.27h,82.26t/data=!3m6!1e1!3m4!1snE1MTAFiobCgTKQbRrsPqA!2e0!7i13312!8i6656?hl=en

hbelkins:
Probably just a pedestrian overpass with either a gentle ADA-compliant grade on either side of the road, or elevators on either side. Most likely similar to the new one being constructed on KY 876 in Richmond near the EKU campus just east of KY 52, or the one on KY 32 in Morehead near St. Claire Medical Center.

CardInLex:
I-65 South (mainline lanes) will be closed beginning July 5th and remain closed for the next 48 days (full closure) just after the Kennedy bridge. All thru traffic will have to detour onto the Jefferson Street c/d ramp, hop over a few lanes, and rejoin I-65 south mainline.

This closure comes after a truck lost it load several months ago severely damaging an overpass. Traffic has been reduced to one mainline lane since then. A full closure is necessary for repairs to take place. Additionally, lanes underneath the overpass (I-64 and ramps to/from I-64) will also have periodic lane closures.

https://www.facebook.com/100064794123736/posts/pfbid0LcPuJtryXUtcdjNnQsNoB5CDwqXiNwEAE4VDFufMFkSvJsAAf4X8MXTK9NavF3XSl/

Edit: Update to closure date. I had it wrong.

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version