According to Wikipedia, Interstate 422 will not be completed until 2048. That's a long time to wait.

I don't think it will ever be completed.
But it will still be six months before I-22 is completed.

Or before a workable solution to US 280 is completed.
Or before the I-85 extension is completed. And I will be 78 by then.
Logged
Go Cubs Go! Go Cubs Go! Hey Chicago, what do you say? The Cubs are gonna win today!

Tourian

  • *
  • Offline Offline

  • Posts: 140
  • Location: Birmingham, AL
  • Last Login: March 05, 2020, 11:38:03 AM
Re: Interstate 422 (Naming)
« Reply #26 on: August 05, 2015, 02:09:45 PM »

According to Wikipedia, Interstate 422 will not be completed until 2048. That's a long time to wait.

I don't think it will ever be completed.

It will be finished before that Atlanta-Huntsville-Memphis highway will....

I think 422 construction will pick up with more segments under construction at the same time as soon as some of these major projects are completed and off the board, IE the 22 exchange, the 20/59 bridges and Malfunction Junction modification.
Logged

codyg1985

  • *
  • Offline Offline

  • Posts: 2132
  • Age: 35
  • Location: Huntsville, AL
  • Last Login: July 30, 2021, 10:09:44 PM
Re: Interstate 422 (Naming)
« Reply #27 on: August 05, 2015, 02:42:07 PM »

ALDOT's top priority state wide seems to be the I-20/59 bridge replacement, from what I can tell.
Logged
Cody Goodman
Huntsville, AL, United States

Charles2

  • *
  • Offline Offline

  • Posts: 340
  • Age: 61
  • Location: Helena, AL
  • Last Login: July 23, 2021, 10:13:06 PM
Re: Interstate 422 (Naming)
« Reply #28 on: August 05, 2015, 09:34:14 PM »

ALDOT's top priority state wide seems to be the I-20/59 bridge replacement, from what I can tell.

And goodness knows, it needs it.  Every time I drive across it, I pray that I make it across.
Logged

Avalanchez71

  • *
  • Offline Offline

  • Posts: 1798
  • Location: Middle Tennessee
  • Last Login: July 29, 2021, 10:58:05 PM
Re: Interstate 422 (Naming)
« Reply #29 on: June 12, 2021, 10:43:39 AM »

What is the status of this project?
Logged

Hot Rod Hootenanny

  • *
  • Offline Offline

  • Posts: 2292
  • Diplomat of Solid Sound

  • Age: 46
  • Location: Middle of Nowhere, Ohio
  • Last Login: July 30, 2021, 10:49:39 PM
    • 20th Century roadfan material
Re: Interstate 422 (Naming)
« Reply #30 on: June 12, 2021, 11:26:36 AM »

What is the status of this project?
Which one are we talking about? O(h)DOT or PennDOT?
Logged
A true vaccination, not that pretend District 10 vaccination stuff.

1

  • *
  • Offline Offline

  • Posts: 10466
  • UMass Lowell student

  • Age: 22
  • Location: MA/NH border
  • Last Login: July 31, 2021, 09:40:32 PM
    • Flickr account
Re: Interstate 422 (Naming)
« Reply #31 on: June 12, 2021, 11:31:49 AM »

What is the status of this project?
Which one are we talking about? O(h)DOT or PennDOT?

I-422, not US 422. (I made the same mistake at first.)
Logged
Clinched

Traveled, plus
US ⒔50
MA ⒐2⒉40.9⒐10⒎10⒐1⒒1⒘1⒚14⒈159
NH 27,38,111A(E); CA133; NY366; GA 42,140; FL A1A; CT32; VT 5A; QC 16⒉16⒌263

Flickr: Click the globe under my avatar

Avalanchez71

  • *
  • Offline Offline

  • Posts: 1798
  • Location: Middle Tennessee
  • Last Login: July 29, 2021, 10:58:05 PM
Re: Interstate 422 (Naming)
« Reply #32 on: June 12, 2021, 02:57:04 PM »

What is the status of this project?
Which one are we talking about? O(h)DOT or PennDOT?

Alabama
Logged

asdfjkll

  • *
  • Offline Offline

  • Posts: 21
  • Location: Tuscaloosa, Alabama
  • Last Login: July 08, 2021, 09:00:08 PM
Re: Interstate 422 (Naming)
« Reply #33 on: June 12, 2021, 08:31:45 PM »

What is the status of this project?
According to the STIP plan: FY 2020/2021 stream/wetland mitigation credits, FY 2021 preliminary engineering for the bridge and base/pave portion of the section between SR-79 and SR-75 (the grade and drain has been completed for a few years already), FY 2023 build two pairs of mainline bridges between SR-79 and SR-75 including the two ramp bridges for the east-facing SR-79 ramps. The base and pave CN (construction) for that section does not appear in the STIP. As with all projects, these fiscal year dates are subject to change due to funding.