« Reply #275 on: June 23, 2021, 11:51:01 AM »

Even the local lefty rag The Memphis Flyer is calling for a third bridge now as long as it can also handle high speed rail one day.

Their editorial also pointed out how silly TDOT's desire to shutdown the old bridge was giving the issues this has shown and how if this problem was caught when it should have, it may have overlapped with the closure.

It is clear they favor a bridge that ties in with the future I-69 corridor in North Memphis.
Logged

Road Hog

  • *
  • Offline Offline

  • Posts: 1481
  • Location: Collin County, TX
  • Last Login: September 16, 2021, 09:58:14 AM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #276 on: June 23, 2021, 08:24:39 PM »


Can't wait to read the metallurgical analysis of the fracture.  They will be able to date the fracture by the levels of oxidation.
Maybe so, but there is photographic evidence of the fracture that can be interpolated as well.
Logged

bwana39

  • *
  • Offline Offline

  • Posts: 834
  • Location: Near Texarkana TX
  • Last Login: September 16, 2021, 10:25:43 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #277 on: June 30, 2021, 11:56:41 AM »

Work is progressing nicely. The last of the slabs are being placed, but the bolting and post tensioning will take a while. Even then reopening is subject to the outcome of the thorough inspection that is being conducted on the rest of the bridge. Remediation of other problems might individually take a similar time to what this repair has taken.

https://dailymemphian.com/section/metro/article/22700/hernando-desoto-bridge-finald-slab-in-lace#/questions
Logged
Let's build what we need as economically as possible.

US71

  • Road Scholar , Master of Snark
  • *
  • Offline Offline

  • Posts: 11165
  • Mad man with a camera

  • Age: 61
  • Location: On the road again
  • Last Login: September 16, 2021, 10:51:23 PM
    • The Road Less Taken
Logged
Like Alice I Try To Believe Three Impossible Things Before Breakfast

Wayward Memphian

  • *
  • Offline Offline

  • Posts: 271
  • Location: Fayetteville, AR
  • Last Login: September 16, 2021, 12:47:08 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #279 on: July 07, 2021, 07:27:21 PM »

I hope they go back and improve that temp two lane exit transition from the old bridge to viaduct portion of I-55 on the Memphis side. That should have been done decades ago. It is stillnpoorly signed and most all were still trying g to get to the right lane over the bridge. Just memory reflex I guess.
Logged

sparker

  • *
  • Offline Offline

  • Posts: 8495
  • Location: Bay Area, CA
  • Last Login: September 12, 2021, 12:44:33 AM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #280 on: July 08, 2021, 06:02:15 AM »

I hope they go back and improve that temp two lane exit transition from the old bridge to viaduct portion of I-55 on the Memphis side. That should have been done decades ago. It is stillnpoorly signed and most all were still trying g to get to the right lane over the bridge. Just memory reflex I guess.

I remember the first time I had to do that; had to fight what seemed to be a convoy of semis just to get to the right lane before the bridge.  Barring a replacement of the structure, an expansion of the EB>SB ramp -- or even a full rebuild of the 55/Crump interchange per published plans -- will still have little if any effect on the traffic patterns essentially mandated by the facility's limitations.  It's like cleaning the mesh debris trap in a faucet if the pipes feeding it are clogged -- won't accomplish much!
Logged

bwana39

  • *
  • Offline Offline

  • Posts: 834
  • Location: Near Texarkana TX
  • Last Login: September 16, 2021, 10:25:43 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #281 on: July 08, 2021, 10:49:04 AM »

I hope they go back and improve that temp two lane exit transition from the old bridge to viaduct portion of I-55 on the Memphis side. That should have been done decades ago. It is stillnpoorly signed and most all were still trying g to get to the right lane over the bridge. Just memory reflex I guess.

There is a plan for a complete rebuild of the intersection. It will take a couple of years, but after this mess, I figure they do this straight away unless they make their priority a new river crossing on either end of the city.
Logged
Let's build what we need as economically as possible.

MikieTimT

  • *
  • Offline Offline

  • Posts: 718
  • Age: 48
  • Location: Wedington Woods, Arkansas
  • Last Login: September 13, 2021, 11:10:39 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #282 on: July 08, 2021, 05:28:05 PM »

I hope they go back and improve that temp two lane exit transition from the old bridge to viaduct portion of I-55 on the Memphis side. That should have been done decades ago. It is stillnpoorly signed and most all were still trying g to get to the right lane over the bridge. Just memory reflex I guess.

There is a plan for a complete rebuild of the intersection. It will take a couple of years, but after this mess, I figure they do this straight away unless they make their priority a new river crossing on either end of the city.

Hopefully this has been enough of a black eye for TDOT that it finally gets the attention it's been needing FOREVER!
Logged

Avalanchez71

  • *
  • Offline Offline

  • Posts: 1835
  • Location: Middle Tennessee
  • Last Login: September 15, 2021, 09:22:21 AM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #283 on: July 09, 2021, 07:55:55 AM »

I hope they go back and improve that temp two lane exit transition from the old bridge to viaduct portion of I-55 on the Memphis side. That should have been done decades ago. It is stillnpoorly signed and most all were still trying g to get to the right lane over the bridge. Just memory reflex I guess.

There is a plan for a complete rebuild of the intersection. It will take a couple of years, but after this mess, I figure they do this straight away unless they make their priority a new river crossing on either end of the city.

Hopefully this has been enough of a black eye for TDOT that it finally gets the attention it's been needing FOREVER!

The intersection/interchange has served a useful function for many years and is a characteristic of the needs of the community. 

Building a new bridge has a major impact to shipping.  The skippers will have to learn how to pilot around said bridge.  This creates another hazard to avoid.
Logged

bwana39

  • *
  • Offline Offline

  • Posts: 834
  • Location: Near Texarkana TX
  • Last Login: September 16, 2021, 10:25:43 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #284 on: July 09, 2021, 08:16:32 AM »

I hope they go back and improve that temp two lane exit transition from the old bridge to viaduct portion of I-55 on the Memphis side. That should have been done decades ago. It is stillnpoorly signed and most all were still trying g to get to the right lane over the bridge. Just memory reflex I guess.

There is a plan for a complete rebuild of the intersection. It will take a couple of years, but after this mess, I figure they do this straight away unless they make their priority a new river crossing on either end of the city.

Hopefully this has been enough of a black eye for TDOT that it finally gets the attention it's been needing FOREVER!

The intersection/interchange has served a useful function for many years and is a characteristic of the needs of the community. 

Building a new bridge has a major impact to shipping.  The skippers will have to learn how to pilot around said bridge.  This creates another hazard to avoid.

Yes a new bridge will create a new challenge for river traffic. If it is properly designed and placed in the river it should be minimal.
The I-55 EH Crump Blvd intersection is a leftover from a time before the HDB. It is the epitome of the neglect all of Memphis has gotten from Nashville. As far as that goes, Nashville itself has places where the frugality of the Tennessee Legislature shows up as well. When the Crump intersection was built, this routing of I-55 was temporary. I-55 was going to be routed across the HDB and follow the Riverfront Expressway which was thankfully never built.  Even outside the temporary status, US-61/ I-55 was secondary. The greater E/W traffic and any traffic heading north followed Crump at least to 3rd street if not all the way to mid-town.
Logged
Let's build what we need as economically as possible.

froggie

  • *
  • Offline Offline

  • Posts: 11908
  • Location: Greensboro, VT
  • Last Login: September 16, 2021, 11:13:39 PM
    • Froggie's Place
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #285 on: July 09, 2021, 09:56:48 AM »

Quote from: Avalanchez71
Building a new bridge has a major impact to shipping.  The skippers will have to learn how to pilot around said bridge.  This creates another hazard to avoid.

The construction of the bridge itself has an impact, but not as large as you may think.  Design and construction of major waterway bridges takes into account the river channels and river traffic.  A number of locations where this has been done in recent years:  St. Francisville LA, the Quad Cities, and St. Paul MN to name a few.  Several other examples along the Mississippi alone.
Logged

bwana39

  • *
  • Offline Offline

  • Posts: 834
  • Location: Near Texarkana TX
  • Last Login: September 16, 2021, 10:25:43 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #286 on: July 09, 2021, 11:14:55 AM »

Quote from: Avalanchez71
Building a new bridge has a major impact to shipping.  The skippers will have to learn how to pilot around said bridge.  This creates another hazard to avoid.

The construction of the bridge itself has an impact, but not as large as you may think.  Design and construction of major waterway bridges takes into account the river channels and river traffic.  A number of locations where this has been done in recent years:  St. Francisville LA, the Quad Cities, and St. Paul MN to name a few.  Several other examples along the Mississippi alone.

The more poignant example would be Greenville MS (US-82). A bridge that was a real impediment to river traffic was replaced by one that was  better positioned for river traffic.
Logged
Let's build what we need as economically as possible.

ethanhopkin14

  • *
  • Offline Offline

  • Posts: 1340
  • Age: 41
  • Location: Austin, TX
  • Last Login: September 16, 2021, 10:14:12 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #287 on: July 09, 2021, 01:43:09 PM »

Quote from: Avalanchez71
Building a new bridge has a major impact to shipping.  The skippers will have to learn how to pilot around said bridge.  This creates another hazard to avoid.

The construction of the bridge itself has an impact, but not as large as you may think.  Design and construction of major waterway bridges takes into account the river channels and river traffic.  A number of locations where this has been done in recent years:  St. Francisville LA, the Quad Cities, and St. Paul MN to name a few.  Several other examples along the Mississippi alone.

The more poignant example would be Greenville MS (US-82). A bridge that was a real impediment to river traffic was replaced by one that was  better positioned for river traffic.

The inverse being the Big Bayou Cannot Bridge that was built to be a swivel bridge but was never fitted with the mechanics for it to swivel because the bayou was deemed unnavigable.  So, a bridge built with river navigation in mind that never had any river traffic. 
Logged

Wayward Memphian

  • *
  • Offline Offline

  • Posts: 271
  • Location: Fayetteville, AR
  • Last Login: September 16, 2021, 12:47:08 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #288 on: July 09, 2021, 02:30:50 PM »

I hope they go back and improve that temp two lane exit transition from the old bridge to viaduct portion of I-55 on the Memphis side. That should have been done decades ago. It is stillnpoorly signed and most all were still trying g to get to the right lane over the bridge. Just memory reflex I guess.

There is a plan for a complete rebuild of the intersection. It will take a couple of years, but after this mess, I figure they do this straight away unless they make their priority a new river crossing on either end of the city.

If that plane still calls for a shutdown of the bridge, you can forget it. No one wants that given the experience with this. Improve the temporary fix to permanent status and take the reduction to a single lane exit for I-55 permanently out of the equation.
Logged

sparker

  • *
  • Offline Offline

  • Posts: 8495
  • Location: Bay Area, CA
  • Last Login: September 12, 2021, 12:44:33 AM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #289 on: July 09, 2021, 05:35:59 PM »

I hope they go back and improve that temp two lane exit transition from the old bridge to viaduct portion of I-55 on the Memphis side. That should have been done decades ago. It is stillnpoorly signed and most all were still trying g to get to the right lane over the bridge. Just memory reflex I guess.

There is a plan for a complete rebuild of the intersection. It will take a couple of years, but after this mess, I figure they do this straight away unless they make their priority a new river crossing on either end of the city.

If that plane still calls for a shutdown of the bridge, you can forget it. No one wants that given the experience with this. Improve the temporary fix to permanent status and take the reduction to a single lane exit for I-55 permanently out of the equation.

Question: has anyone (meaning TDOT and/or ADOT) considered a parallel bridge to the present I-55 through truss -- it could (conceivably) be built adjacent and then used for both directions while the current bridge is revamped for 3 lanes in one direction, eliminating the need for a total bridge shutdown.  Been done elsewhere with reasonable success and could be worked into the Crump modification as necessary.   
Logged

Tomahawkin

  • *
  • Offline Offline

  • Posts: 452
  • Last Login: September 16, 2021, 10:53:28 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #290 on: July 09, 2021, 08:00:18 PM »

A new bridge over the Mississippi would probably be made resistant to Floods as well as earthquake proof. It might take 8 years to build? IMO it should be built to handle 10 lanes total. Therefore a accident on the bridge doesn't shut down the whole interstare
Logged

sparker

  • *
  • Offline Offline

  • Posts: 8495
  • Location: Bay Area, CA
  • Last Login: September 12, 2021, 12:44:33 AM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #291 on: July 09, 2021, 09:27:23 PM »

A new bridge over the Mississippi would probably be made resistant to Floods as well as earthquake proof. It might take 8 years to build? IMO it should be built to handle 10 lanes total. Therefore a accident on the bridge doesn't shut down the whole interstare

10 total lanes might be asking too much; it's probably not possible to reconfigure the existing I-55 bridge for anything exceeding three 12-foot lanes with "bridge-acceptable" shoulders.  Perhaps a 2nd/parallel bridge could have up to 5 lanes, with maybe one or two reversible for peak traffic. 
Logged

froggie

  • *
  • Offline Offline

  • Posts: 11908
  • Location: Greensboro, VT
  • Last Login: September 16, 2021, 11:13:39 PM
    • Froggie's Place
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #292 on: July 10, 2021, 10:25:41 AM »

I hope they go back and improve that temp two lane exit transition from the old bridge to viaduct portion of I-55 on the Memphis side. That should have been done decades ago. It is stillnpoorly signed and most all were still trying g to get to the right lane over the bridge. Just memory reflex I guess.

There is a plan for a complete rebuild of the intersection. It will take a couple of years, but after this mess, I figure they do this straight away unless they make their priority a new river crossing on either end of the city.

If that plane still calls for a shutdown of the bridge, you can forget it. No one wants that given the experience with this. Improve the temporary fix to permanent status and take the reduction to a single lane exit for I-55 permanently out of the equation.

Question: has anyone (meaning TDOT and/or ADOT) considered a parallel bridge to the present I-55 through truss -- it could (conceivably) be built adjacent and then used for both directions while the current bridge is revamped for 3 lanes in one direction, eliminating the need for a total bridge shutdown.  Been done elsewhere with reasonable success and could be worked into the Crump modification as necessary.   

The 2006 study included the existing I-55 bridge location as a potential corridor, but dropped it in the first round of corridor screening.  The reasons why it was dropped are unclear, but I believe contributing factors were that a parallel bridge to the north would be too close to the Frisco bridge, while a parallel bridge to the south would have parkland impacts.  The study did note that widening the existing I-55 bridge was deemed infeasible due to it's type of construction.
Logged

edwaleni

  • *
  • Offline Offline

  • Posts: 1224
  • Last Login: September 16, 2021, 02:04:38 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #293 on: July 12, 2021, 09:57:13 AM »

Caltrans was able to build a new Bay Bridge by putting the new one right next to the old one and building a temporary shoofly that took traffic over to the old span while the approaches were reconstructed. Once the new approaches were connected to the new span, the traffic was moved back over and the shoofly demolished.



« Last Edit: July 12, 2021, 10:00:41 AM by edwaleni »
Logged

bwana39

  • *
  • Offline Offline

  • Posts: 834
  • Location: Near Texarkana TX
  • Last Login: September 16, 2021, 10:25:43 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #294 on: July 12, 2021, 10:45:41 AM »

Caltrans was able to build a new Bay Bridge by putting the new one right next to the old one and building a temporary shoofly that took traffic over to the old span while the approaches were reconstructed. Once the new approaches were connected to the new span, the traffic was moved back over and the shoofly demolished.


There were far more limiting factors in place for the Bay Bridge. A new routing would in Memphis would be less expensive, leave the existing bridge in place for local traffic, and simplify the routing for I-55. 

The Bay Bridge had a MUST exit point on the San Francisco side. It had to follow the same (basic) pattern through Yerba Buena island. These restrictions are not set in stone in Memphis or Northern  Mississippi. There is more than one possible passageway in Memphis. In San Francisco, there were no real alternatives.

 Just reroute I-55  to cross the river farther south on a new easier routing.
« Last Edit: July 28, 2021, 04:36:49 PM by bwana39 »
Logged
Let's build what we need as economically as possible.

edwaleni

  • *
  • Offline Offline

  • Posts: 1224
  • Last Login: September 16, 2021, 02:04:38 PM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #295 on: July 12, 2021, 11:28:54 AM »

Caltrans was able to build a new Bay Bridge by putting the new one right next to the old one and building a temporary shoofly that took traffic over to the old span while the approaches were reconstructed. Once the new approaches were connected to the new span, the traffic was moved back over and the shoofly demolished.


There were far more limiting factors in place for the Bay Bridge. A new routing would in Memphis would be less expensive, leave the existing bridge in place for local traffic, and simplify the routing for I-55. 

The Bay Bridge had a MUST exit point on the San Francisco side. It had to follow the same (basic) pattern through Yerba Buena island. These restrictions are not set in stone in Memphis or Northern Mississippi.

I agree on the Arkansas side of the river. It is the Memphis side that has a constrained exit point due to Crump Park.

TNDOT could do what Illinois did with the Musial/Veterans Bridge in St Louis, simply move I-70 upstream or in this case move I-55 downstream using the Incline Bayou over Jack Carley Causeway. The Memphis Port Commission already owns most of this land today.

This would return the Ark-Mem Bridge back to its original intent, a local traffic carry over for Crump Boulevard.

« Last Edit: July 12, 2021, 11:33:08 AM by edwaleni »
Logged

sparker

  • *
  • Offline Offline

  • Posts: 8495
  • Location: Bay Area, CA
  • Last Login: September 12, 2021, 12:44:33 AM
Re: I -40 Hernando Desoto Bridge at Memphis shutdown
« Reply #296 on: July 13, 2021, 06:35:35 AM »

Caltrans was able to build a new Bay Bridge by putting the new one right next to the old one and building a temporary shoofly that took traffic over to the old span while the approaches were reconstructed. Once the new approaches were connected to the new span, the traffic was moved back over and the shoofly demolished.


There were far more limiting factors in place for the Bay Bridge. A new routing would in Memphis would be less expensive, leave the existing bridge in place for local traffic, and simplify the routing for I-55. 

The Bay Bridge had a MUST exit point on the San Francisco side. It had to follow the same (basic) pattern through Yerba Buena island. These restrictions are not set in stone in Memphis or Northern Mississippi.

I agree on the Arkansas side of the river. It is the Memphis side that has a constrained exit point due to Crump Park.

TNDOT could do what Illinois did with the Musial/Veterans Bridge in St Louis, simply move I-70 upstream or in this case move I-55 downstream using the Incline Bayou over Jack Carley Causeway. The Memphis Port Commission already owns most of this land today.

This would return the Ark-Mem Bridge back to its original intent, a local traffic carry over for Crump Boulevard.



And the "sign salad" of the multiple US highways crossing the river there could once again become the bridge's mainstays once I-55 is elsewhere.  That was always an interesting and often fun aspect of Memphis' road network -- following the US highways across town, even with convoluted routings! 
Logged

US71

  • Road Scholar , Master of Snark
  • *
  • Offline Offline

  • Posts: 11165
  • Mad man with a camera

  • Age: 61
  • Location: On the road again
  • Last Login: September 16, 2021, 10:51:23 PM
    • The Road Less Taken
I-40 Bridge to Reopen
« Reply #297 on: July 27, 2021, 11:15:20 PM »

I-40 bridge may reopen this weekend eastbound with westbound opening a few days later.

« Last Edit: July 28, 2021, 12:14:17 AM by rickmastfan67 »
Logged
Like Alice I Try To Believe Three Impossible Things Before Breakfast

renegade

  • *
  • Offline Offline

  • Posts: 911
  • Change my mind.

  • Location: Paulding Light
  • Last Login: Today at 03:29:26 AM
Re: I-40 Bridge to Reopen
« Reply #298 on: July 27, 2021, 11:17:43 PM »

Oops.  Must be a bad link.
Logged
Don’t ask me how I know.  Just understand that I do.

Thegeet

  • *
  • Offline Offline

  • Posts: 181
  • Location: Port Lavaca, TX
  • Last Login: September 16, 2021, 06:08:24 PM
Re: I-40 Bridge to Reopen
« Reply #299 on: July 27, 2021, 11:21:28 PM »