September 15, 2023 Letting: Bid Results.
Bid Award Winners.
Job J1P3223 Route 5, 41 CARROLL, CHARITON, LINN County. Resurface on Route 41 from Route 24 to MO River near De Witt, on Route 5 from Route 36 to County Road 302 near Marceline, and on Route 5 from Route 24 to Route KK near Glasgow, the total length of improvement being 20.6 miles.
Job J1S3393 Route B, D, DD, K LIVINGSTON County. ADA improvements on Route K in Chula, on Route D and DD in Ludlow, and on Route B in Wheeling, the total length of improvement being 0.79 miles.
(1): Job JNW0005 Route 46 ATCHISON County. Bridge replacement over Little Tarkio Creek, 2.5 miles east of Fairfax, the total length of improvement being 0.122 miles.
(2): Job JNW0006 Route 111 ATCHISON County. Bridge replacement over Pike Creek Drainage Ditch, 6 miles north of Corning, the total length of improvement being 0.062 miles.
Job JST0049 Route W,N,KK,E,A,HH,D,BB CALDWELL, CARROLL, CLINTON County. Resurface on Route W near Hamilton, on Route N near Braymer, on Route KK near Braymer, on Route E near Braymer, on Route A near Braymer, on Route HH near Mirabile, on Route D near Mirabile, on Route BB near Cameron, the total length of improvement being 65.863 miles.
Job J2P3357 Route 79 MARION County. Bridge replacement and ADA improvements over Bear Creek, Norfolk Southern Railroad, and Warren Barrett Drive 0.4 mile north of Rte. T in Hannibal, the total length of improvement being 0.285 miles.
(1): Job J2P3386 Route 15 SHELBY County. Seal coat from Rte. 168 at Shelbyville to just north of Rte. 36 at Shelbina, the total length of improvement being 7.069 miles.
(2): Job JNE0017 Route 15 MONROE, SHELBY County. Seal coat from 0.2 mile south of Rte. 36 to Rte. 154 north junction in Monroe County at Paris, the total length of improvement being 17.87 miles.
(1): Job J2S3407 Route E LINCOLN County. Seal coat from Route UU in Silex to Route 61, the total length of improvement being 5.147 miles.
(2): Job J2S3408 Route E LINCOLN, MONTGOMERY County. Resurface from I-70 to Route UU in Silex, the total length of improvement being 35.188 miles.
(1): Job J2S3413 Route B AUDRAIN, RALLS County. Resurface from Rte. 154 to Rte. 54 in Audrain County 5.2 miles east of Mexico, the total length of improvement being 19.136 miles.
(2): Job J2S3415 Route D AUDRAIN, BOONE County. Resurface from Rte. Z to 0.1 mile south of Rte. 15 in Mexico, the total length of improvement being 16.213 miles.
(3): Job J2S3417 Route FF AUDRAIN, BOONE County. Resurface from Rte. Z to 1 mile west of Rte. 15 in Mexico, the total length of improvement being 13.564 miles.
(4): Job J2S3418 Route M AUDRAIN County. Resurface from Rte. FF to Rte. D near Mexico, the total length of improvement being 2.228 miles.
(1): Job JNE0014 Route 79 PIKE County. Seal coat from 0.9 mile south of Route 54 east junction in Louisiana to Lincoln County line, the total length of improvement being 20.778 miles.
(2): Job JNE0015 Route B PIKE County. Seal coat from Route 61 near Frankford to Route 79, the total length of improvement being 6.093 miles.
Job J4S3349 Route 371 PLATTE County. Resurface and shoulder improvements from the Buchanan County Line south to Route 273, the total length of improvement being 10.776 miles.
Job J5I3477 Route I-44 CRAWFORD County. Resurface from approximately 2 miles east of Route F to the Franklin County line in Sullivan, the total length of improvement being 42.024 miles.
(1): Job J5P3518 Route 3, 40 BOONE, HOWARD County. Seal coat on Route 3 from Randolph County to Rte 5 and Route 40 from Rte 87 to I-70, the total length of improvement being 26.216 miles.
(2): Job JCD0017 Route 5 COOPER, MORGAN County. Seal coat from I-70 to Rte 50, the total length of improvement being 19.454 miles.
(3): Job JCD0018 Route 87 HOWARD County. Seal coat from Missouri River Bridge at Glasgow to Rte 40, the total length of improvement being 19.942 miles.
Job J5P3527 Route 32 DALLAS, LACLEDE, TEXAS County. Seal coat from Route P in Dallas County to Route 17 in Texas County, the total length of improvement being 50.122 miles.
Job J5S3369B Route Various VARIOUS County. ADA improvements on Rte 87 in California, on Rte B and 50 in Tipton, on Rte 50 in Syracuse, on Rte 135 in Stover, on Rte B in Lone Elm, on Rte 3 and V in Armstrong, on Rte 129 in Roanoke, on Rte 5 in Fayette, on Rte 124 in Hallsville, and on Rte 124 and J, the total length of improvement being 2.617 miles.
(1): Job J5P3530 Route 41 COOPER County. Resurface from Saline County line to I-70, the total length of improvement being 11.608 miles.
(2): Job JCD0016 Route K COOPER County. Resurface from Route 41 to I-70, the total length of improvement being 5.67 miles.
Job JCDM0002 Route F, JJ COOPER, PETTIS County. Resurface on Route F from Route 5 to Route B and on Route JJ from Route 135 to the end of state maintenance, the total length of improvement being 9.9 miles.
(1): Job JCD0028 Route A OSAGE County. Resurface from Main Street in Bonnots Mill to Route 50, the total length of improvement being 8.214 miles.
(2): Job JCD0077 Route 133, EE MARIES, OSAGE, PULASKI County. Resurface from Route 63 intersection (north of Westphalia) to Route 17 intersection (north of Crocker), the total length of improvement being 51.013 miles.
(3): Job JCD0078 Route 100 GASCONADE, OSAGE County. Resurface from US 50 (in Linn) to Route N (Gasconade County), the total length of improvement being 27.421 miles.
Job JST0051 Route AC, AD FRANKLIN County. Resurface on Route AC from Rte H to Rte 185 and on Route AD from end of state maintenance to Route 47, the total length of improvement being 6.978 miles.
Job JST0056 Route Various GASCONADE, OSAGE County. Resurface on various routes in Osage and Gasconade Counties, the total length of improvement being 63.642 miles.
Job JSLM0034 Route 141 JEFFERSON County. Pipe replacement at Fiedler Lane (Springdale Blvd.) in Jefferson County, the total length of improvement being 0.004 miles.
Job JSLM0038 Route I-70 ST LOUIS CITY County. Bridge fence and barrier repair at West Florissant Road, the total length of improvement being 0.008 miles.
Job J7I3489 Route I-49 BARTON, VERNON County. Resurface from Route 54 in Nevada to Route 160 in Lamar, the total length of improvement being 50.346 miles.
(1): Job J7P3393 Route 65 DALLAS, GREENE County. Resurface from Route KK in Greene County to Route AA in Dallas County, the total length of improvement being 6.195 miles.
(2): Job J8P3164 Route 65 GREENE County. Resurface from I-44 to Route KK, the total length of improvement being 6.456 miles.
Job J7P3470 Route ZZ, 60, 14, K, PP CHRISTIAN, LAWRENCE County. ADA improvements on Route ZZ in Marionville, on Route 60 in Billings, on Route 14 and Route K in Clever and on Route 14 and Route PP in Sparta, the total length of improvement being 2.971 miles.
Job J7S3487 Route 86 NEWTON County. Intersection improvements at Hammer Road in Neosho, the total length of improvement being 0.194 miles.
Job J8S3157 Route 413 GREENE County. Bridge replacement and ADA improvements from 0.1 mile east of Scenic Avenue to Route 13 (Kansas Expressway) in Springfield, the total length of improvement being 0.591 miles.
(1): Job J8S3226 Route C GREENE County. Resurface from Route 65 to Route 125 northwest of Strafford, the total length of improvement being 3.637 miles.
(2): Job J8S3227 Route WW GREENE County. Resurface and add shoulders from Route 13 to Route H north of Springfield, the total length of improvement being 3.47 miles.
(3): Job J8S3228 Route DD GREENE County. Resurface from Route 125 to the Webster County Line, the total length of improvement being 2.723 miles.
Job JSR0157 Route 73 CAMDEN, DALLAS County. Resurface from Route 54 to Route 65 near Buffalo, the total length of improvement being 19.939 miles.
Job JST0045 Route EE,K, W,Y,NN, PP,J MCDONALD, NEWTON County. Resurface on Rte. EE from I-49 to end of state maintenance (ESM), on Rte. K from I-49 to Rte. 90, on Rte. W from Pineville to Rte. 76, on Rte. Y from Rte. B to Rte. 60, on Rte. NN from Rte. 71 to ESM, on Rte. PP from Rte. 43 to ESM, on Rte. J from Rte. 43, the total length of improvement being 38.4 miles.
(1): Job JST0027 Route C SCOTT County. Resurface from Rte. 91 in Morley to east of I-55, the total length of improvement being 4.827 miles.
(2): Job JST0028 Route ZZ DUNKLIN County. Resurface from beginning of state maintenance to Rte. NN, the total length of improvement being 3.549 miles.
(3): Job JST0032 Route V CAPE GIRARDEAU County. Resurface from north junction 177 to south junction 177, the total length of improvement being 5.898 miles.
(4): Job JST0037 Route A MADISON County. Resurface from Rte. M to Rte. 51., the total length of improvement being 9.201 miles.
(5): Job JST0041 Route B BOLLINGER County. Resurface from Rte. 72 to Rte. M., the total length of improvement being 6.479 miles.
(1): Job JST0030 Route CC IRON County. Resurface from beginning of state maintenance to Route 21, the total length of improvement being 2.902 miles.
(2): Job JST0034 Route BB RIPLEY County. Resurface from beginning of state maintenance at Route BB to Route 160, the total length of improvement being 3.982 miles.
(3): Job JST0040 Route K MADISON County. Resurface from Route 72 to Route H, the total length of improvement being 6.472 miles.
(4): Job JST0043 Route H REYNOLDS County. Resurface from Route 21 to end of state maintenance, the total length of improvement being 10.218 miles.
Job JSE0160 Route C MADISON County. Soil nail wall 0.1 mile west of Saint Francis River near Saco, the total length of improvement being 0.02 miles.
EDIT: Additional lettings added
Job JNW0023 Route 6 SULLIVAN County. Resurface from Rte. 129 in Green City to western city limits of Green Castle, the total length of improvement being 3.581 miles.
Job JST0050 Route YY, Y, M, 129,C,139 CHARITON, LINN, LIVINGSTON, PUTNAM, SULLIVAN County. Resurface on Route 129 at four locations, on Route 139 near Brookfield. on Route T and YY in Putnam County near Unionville, on Route M and C in Linn County near Brookfield, and on Route NN Chariton County near Salisbury, the total length of improvement being 73.568 miles.
Job JST0053 Route Various MACON, MONROE, RANDOLPH County. Resurface on Route DD near Kellogg, on Route T near College Mound, on Route CC near Levick Mill, on Route K from Cairo to Route 15, add alternate Route AA near Ten Mile, add alternate Route FF near Levick Mill, and add alternate Route M near Middle Grove, the total length of improvement being 34.557 miles.
Job ST0046 Route AA, D, E, Y BATES County. Resurface at various locations in Bates County, the total length of improvement being . miles.