News:

The AARoads Wiki is live! Come check it out!

Main Menu

MODOT Contract Lettings

Started by mvak36, January 14, 2017, 04:40:27 PM

Previous topic - Next topic

mvak36

#250
August 16, 2024 Letting: Bid Results. Bid Award Winners.

Job J1S3413 Route Various CALDWELL, CARROLL, CHARITON, CLINTON, DAVIESS, LIVINGSTON County. 11 Bridge rehabilitations at various locations in the Northwest District, the total length of improvement being 0 miles.
Job J1S3415 Route Various ANDREW, BUCHANAN, CLINTON, DEKALB County. 16 Bridge rehabilitations at various locations in the Northwest District, the total length of improvement being 0 miles.

(1): Job JNE0019 Route 136 PUTNAM, SCHUYLER County. Resurface from Route 63 to 0.3 miles west of Route N near Livonia, the total length of improvement being 7.894 miles.
(2): Job JNE0020 Route 136 SCHUYLER County. Seal Coat from Route 63 to Scotland County line near Downing, the total length of improvement being 11.503 miles.
(3): Job JNE0021 Route 136 CLARK, SCOTLAND County. Seal Coat from the Schuyler County line to 0.5 miles west of the BNSF Railroad near Medill, the total length of improvement being 30.904 miles.

(1): Job JNE0029 Route K SHELBY County. Resurface from Route 151 to Route 15 in Shelbyville, the total length of improvement being 10.588 miles.
(2): Job JNE0030 Route 151 KNOX, SHELBY County. Resurface from Route 156 to 0.3 miles north of Route 36 near Clarence, the total length of improvement being 22.492 miles.
(3): Job JNE0031 Route 151 AUDRAIN, BOONE, MONROE, SHELBY County. Resurface from 0.3 miles north of Route 36 to Route 22 near Centralia and on Bus 36 in Clarence, the total length of improvement being 45.031 miles.
(4): Job JNE0197 Route BU 36 SHELBY County. Resurface from Route 36 to Route 36 in Shelbina, the total length of improvement being 1.719 miles.

Job JKU0026 Route 71, I-49, I-435, 50 JACKSON County. ITS improvements on various interstates and major highways in the Kansas City District, the total length of improvement being 0 miles.
Job JKU0072 Route I-29 PLATTE County. Resurface from Route 273 to 0.8 mile south of Mexico City Avenue in Platte City, the total length of improvement being 6.59 miles.
Job J5P3522 Route 8 WASHINGTON County. Bridge deck replacement on Route 8 over Union Pacific RR 4.9 miles east of Potosi, the total length of improvement being 0.1291 miles.

(1): Job JCD0040 Route E COLE County. Seal coat from Route 54 to Route B, near Brazito, the total length of improvement being 5.675 miles.
(2): Job JCD0042 Route T OSAGE County. Seal coat from Route 63 to Maries County line, near Vienna, the total length of improvement being 11.138 miles.

Job JCDM0060 Route 17 MILLER County. Bank armoring at Bridge A7536 over the Osage River south of Tuscumbia, the total length of improvement being 0.424 miles.
Job JCD0049 Route OO, HH, Z BOONE County. Resurface on Route Z from Gano Chance Dr. to end of state maintenance, on Route OO from Route B to Route Z, and on Route HH from Route B to Route Z, the total length of improvement being 29.357 miles.
Job J6S3633 Route AB ST LOUIS County. Coldmill, resurface, ADA improvements, and bridge deck sealing from 0.1 mile west of Route 141 to I-270, near Creve Coeur, the total length of improvement being 3.42 miles.
Job JSLM0047 Route I-44, I-64, 364 ST CHARLES, ST LOUIS, ST LOUIS CITY County. Bridge netting and fencing at I-64 from 18th Street to 4th Street, I-64 over the Missouri River, 364 over the Missouri River, I-44 near Park Avenue and 7th Street, and I-44 at Carr Street, the total length of improvement being 0 miles.
Job J7P3457 Route 13, 39 BARRY, STONE County. Bridge washing on Route 13 over Table Rock Lake in Kimberling City and on Route 39 over Table Rock Lake in Shell Knob, the total length of improvement being 0.644 miles.
Job J7S0532 Route 90 MCDONALD County. Bridge replacement over Little Sugar Creek near Pineville, the total length of improvement being 0.265 miles.
Job JSR0010 Route 265 STONE County. ADA improvements at various locations in Crane, the total length of improvement being 0 miles.
Job J9P3631 Route K, 61 CAPE GIRARDEAU County. Asphalt pavement repair on Route K from east of I-55 to Route 61 and on Route 61 from Route K to west of I-55, the total length of improvement being 6.642 miles.
Job JST0113 Route H, KK, & KK BOLLINGER, CAPE GIRARDEAU, MADISON, PERRY, ST FRANCOIS County. Resurface on Route H in St Francois County from Route DD to the south intersection of Route 67, on Route KK from Route 51 to Route B in Cape Girardeau County, on Route KK in Perry County from Route E to end of State maintenance, the total length of improvement being 28.131 miles.

EDIT: Additional Lettings added.
Job JST0103 Route D,H,T,W ADAIR, SCHUYLER, SULLIVAN County. Resurfacing on Sullivan/Adair Rte. D from Rte. 6 to Rte. 149, on Schuyler Rte. H from Rte. 136 to Rte. W, on Schuyler Rte. W from Putnam County line to Rte. 63, and on Adair Rte. T from Rte. 63 to end of state maintenance, the total length of improvement being 33.39 miles.

(1): Job JKU0045 Route D CASS County. Resurface from Route 58 to Route Y near Belton, the total length of improvement being 9.508 miles.
(2): Job JKU0067 Route YY CASS County. Resurface and coldmill from Route Y to Route C in Peculiar, the total length of improvement being 4.103 miles.

Job JSEM0065 Route I-55 SCOTT County. Pavement repair 0.5 miles south of Route AB, the total length of improvement being 0.012 miles.
Counties: Counties visited
Travel Mapping: Summary


Sani

Quote from: mvak36 on July 16, 2024, 07:38:38 AMAugust 16, 2024 Letting:

Job JKU0026 Route 71, I-49, I-435, 50 JACKSON County. ITS improvements on various interstates and major highways in the Kansas City District, the total length of improvement being 0 miles.
Wonder if this includes upgrades to KCScout that will head off another ransomware attack.

mvak36

#252
August 13, 2024 Letting: Bid Results. Bid Award Winners.

Job JNE0171 Route U WARREN County. Emergency slide repair from 1.7 miles north of Route 94 to 2.1 miles north of Route 94 near Pinckney, the total length of improvement being 0.410 miles.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#253
September 20, 2024 Letting: Bid Results. Bid Award Winners.

Job JNW0002 Route 59 BUCHANAN County. Intersection and ADA improvements at Route 752 in St. Joseph, the total length of improvement being 0.476 miles.
Job JNW0028 Route Y,C,AH,W,AB,JJ,NN ANDREW, HOLT, NODAWAY County. Resurface on Routes Y, C, NN, AH, WW, AB, JJ and NN, the total length of improvement being 76.842 miles.
Job JNW0031 Route 190 DAVIESS County. Bridge replacement over Clear Creek, 2 miles north of Lock Springs, the total length of improvement being 0.229 miles.

(1): Job JNE0032 Route 15 MONROE County. Seal coat from Route 154 north junction to Route D near Paris, the total length of improvement being 6.001 miles.
(2): Job JNE0033 Route 15 AUDRAIN, MONROE County. Resurface from Route D to 1.1 mile north of Route 22 near Mexico, the total length of improvement being 18.338 miles.
(3): Job JNE0037 Route 154 MONROE, RALLS County. Seal coat from Route 24 at Paris to 0.04 mile west of Route 19, the total length of improvement being 21.655 miles.

(1): Job JNE0044 Route 6 ADAIR, SULLIVAN County. Seal coat from the Chariton River near Novinger to 0.3 mile west of Route D in Green Castle, the total length of improvement being 11.359 miles.
(2): Job JNE0045 Route 6 ADAIR County. Seal coat from 1 mile east of Route 149 at the Chariton River to Bus. 63 in Kirksville, the total length of improvement being 5.774 miles.
(3): Job JNE0046 Route 6 ADAIR, KNOX County. Seal coat from 0.2 miles east of Route 63 to Route 15 south junction near Edina, the total length of improvement being 19.981 miles.

Job JKU0020 Route I-470 JACKSON County. Resurface from Hickman Mills Drive to Raytown Road, the total length of improvement being 2.846 miles.

(1): Job JKU0046 Route 1 CLAY County. Coldmill and resurface from Route 152 to 72nd Street in Kansas City, the total length of improvement being 1.81 miles.
(2): Job JKU0054 Route 152 CLAY County. Resurface, pavement repair, and guardrail from Route 1 to I-35 in Kansas City, the total length of improvement being 4.39 miles.

(1): Job JKU0050 Route 152 CLAY, PLATTE County. Coldmill, resurface, and pavement repair from I-29 to Route 169, the total length of improvement being 4.095 miles.
(2): Job JKU0052 Route 152 CLAY County. Coldmill, resurface, and pavement repair from Route 169 to Route 1, the total length of improvement being 2.6 miles.

Job JKU0070 Route A CLAY County. Pavement resurfacing on Route 92 to Liberty city limits, the total length of improvement being 5.32 miles.
Job JKU0073 Route I-35 CLAY County. Coldmill and resurface from I-29 to west of Pleasant Valley Rd., the total length of improvement being 5.184 miles.
Job JKU0165 Route Various CLAY, PLATTE County. 19 Bridge deck seals at various locations in the Kansas City District, the total length of improvement being 0 miles.
Job J5P3498 Route 5 HOWARD County. Bridge replacement and ADA improvements over Bear Creek in Glasgow, the total length of improvement being 0.233 miles.

(1): Job J5S3336 Route D, E CAMDEN, LACLEDE County. Resurface and add shoulders on Route D, 0.049 miles from US 54 to Route E and on Route E from beginning of state maintenance to MO 5, the total length of improvement being 28.018 miles.
(2): Job JCD0099 Route N,W CAMDEN County. Resurface and guardrail and bridge work from Route 54 to the end of state maintenance, the total length of improvement being 11.418 miles.

(1): Job J5S3578 Route A CAMDEN County. Resurface from Route 54 to Route 7, the total length of improvement being 25.9 miles.
(2): Job JCD0098 Route C CAMDEN, MILLER County. Resurface from Route 17 in Miller County to Route A in Camden County, the total length of improvement being 16.828 miles.

(1): Job JCD0029 Route J, F, H, M, RA CALLAWAY County. Coldmill and resurface on Route J from I-70 to Route 54, on Route F from Route J to Westminster Ave in Fulton, on Route H from Route J to Route 54, on Route M from Audrain County to I-70, and on Route RA from Route J to end of state maint., the total length of improvement being 44.39 miles.
(2): Job JCD0050 Route WW, N BOONE County. Resurface on Route WW from Route 63 to Route J in Millersburg and on Route N from Route 163 to end of state maintenance in Easley, the total length of improvement being 14.693 miles.
(3): Job JCD0149 Route Z CALLAWAY County. Coldmill and resurface on Route Z from Fulton to I-70, the total length of improvement being 9.68 miles.

Job JCD0060 Route E OSAGE County. Bridge rehabilitation over Town Creek in Rich Fountain, the total length of improvement being 0.046 miles.
Job JCD0064 Route V, U BOONE County. Resurface on Route V from Route 22 to Route U near Sturgeon and on Route U from Route V to Route 124 near Hallsville, the total length of improvement being 10.34 miles.
Job JCD0122 Route 72, KK PHELPS County. ADA Improvements on Route 72 at various locations in Rolla, on Route KK at various locations in St. James, the total length of improvement being 2.873 miles.
Job JCD0177 Route MM CAMDEN County. Toll booth removal and pavement replacement west of Community Bridge near Lake Ozark, the total length of improvement being 0.415 miles.
Job JSL0179 Route 180 ST LOUIS County. Signal improvements from I-270 to Ogden Ave. near City of St. Louis, the total length of improvement being 9.558 miles.
Job JSL0075 Route I-70 ST LOUIS CITY County. Microsurfacing from Goodfellow Blvd. to Kingshighway Blvd., the total length of improvement being 1.931 miles.

(1): Job JSR0027 Route 7 HENRY County. Coldmill and resurface from Route 13 to 0.1 mile east of Vansant Road in Clinton, the total length of improvement being 0.326 miles.
(2): Job JSR0029 Route 7 HENRY County. Resurface from North of NW 1400 Rd to Route 7 in Clinton, the total length of improvement being 12.44 miles.

Job J9P3687 Route 19 SHANNON County. Bridge replacement over Hurricane Creek south of Winona, the total length of improvement being 0.193 miles.

(1): Job J9P3751 Route 67 BUTLER County. Upgrade to freeway, 3 bridges and 2 box culvert extensions from 2.0 miles south of Poplar Bluff to 4.5 miles south of Poplar Bluff, the total length of improvement being 2.504 miles.
(2): Job J9P3764 Route 67 BUTLER County. Upgrade to freeway from 1.5 mi. south of Route 158 near Harviell to County Road 338, the total length of improvement being 1.647 miles.

Job J9S3606 Route B BUTLER County. Bridge replacement over Drainage Ditch 1, the total length of improvement being 0.053 miles.
Job JST0112 Route Various DOUGLAS, HOWELL, OZARK, WRIGHT County. Resurface on Routes Y, OO, NN, WW, AF, FF, and AK in Douglas County, on Routes K and E in Wright County, on Routes AR and FF in Ozark County, on Route P in Howell County, and on Route N in Douglas and Ozark Counties, the total length of improvement being 86.841 miles.

EDIT: Additional Lettings Added
Job JST0100 Route MM,FF,H,OO,Y,Z,DD LINN, SULLIVAN County. Resurface on Route MM in Linn County and Routes MM, FF, H,Y, OO, Z and possibly Route DD in Sullivan County, the total length of improvement being 41.649 miles.
Job JST0105 Route WW,Y,K,V,W,J LINCOLN, MONTGOMERY, PIKE County. Resurface in Lincoln County on Route Y and Pike County on Route WW. Potential additional alternates on Routes K and V in Lincoln County, on Route W in Pike County, and on Route J in Montgomery County, the total length of improvement being 17.116 miles.
Job JST0095 Route Various BOONE, HOWARD, RANDOLPH County. Resurface on Rte F from Rte 63 to Rte 124, on Rte T from Rte B to Rte F, on Rte EE from Rte A to Rte J, on Rte AA from Rte 87 to Rte E, on Rte A from Rte B to Rte 124, and on Rte A from Rte 124 to Rte EE, the total length of improvement being 43.035 miles.
Job JST0099 Route Various CARROLL, CHARITON, LINN, RANDOLPH County. Resurface on Routes E, EE, T, UU, in Carroll County, Routes TT, ZZ, EE, W in Linn County, Routes TT, ZZ, W in Chariton County, Route W in Randolph County and a potential for Route NN in Carroll County, Route C and UU in Chariton County, the total length of improvement being 68.21 miles.
Job JST0106 Route Y, P, F LEWIS, MARION County. Resurface on Route Y from Route K to Route 16, near Monticello, on Route F from Route E to 0.2 miles west of Route 61 near Palmyra, on Route P from Route A to the end of maitenance near Durham, the total length of improvement being 25.42 miles.
Job JST0096 Route Various COLE, COOPER, MONITEAU, MORGAN County. Resurface on various Routes in Cooper, Moniteau, Cole, and Morgan counties, the total length of improvement being 54.782 miles.
Job JCDM0064 Route I-70 BOONE County. Bridge rehabilitation over Route O/J, the total length of improvement being 0.01 miles.
Job JST0108 Route CC,B,MM,TT,AA,AA,Y BARRY, MCDONALD, NEWTON County. Resurface on Route B, CC, MM and TT in McDonald County, Route AA and Y in Barry County and Route AA in Newton County, the total length of improvement being 41.785 miles.
Counties: Counties visited
Travel Mapping: Summary

splashflash

#254
US 67 upgrade to freeway  :clap:
Phases 1b and 2? Of the Butler County MoDoT US 67 freeway project

(1): Job J9P3751 Route 67 BUTLER County. Upgrade to freeway, 3 bridges and 2 box culvert extensions from 2.0 miles south of Poplar Bluff to 4.5 miles south of Poplar Bluff, the total length of improvement being 2.504 miles.
(2): Job J9P3764 Route 67 BUTLER County. Upgrade to freeway from 1.5 mi. south of Route 158 near Harviell to County Road 338, the total length of improvement being 1.647 miles.


mvak36

Quote from: splashflash on August 15, 2024, 08:49:26 AMUS 67 upgrade to freeway  :clap:
Phases 1b and 2? Of the Butler County MoDoT US 67 freeway project

(1): Job J9P3751 Route 67 BUTLER County. Upgrade to freeway, 3 bridges and 2 box culvert extensions from 2.0 miles south of Poplar Bluff to 4.5 miles south of Poplar Bluff, the total length of improvement being 2.504 miles.
(2): Job J9P3764 Route 67 BUTLER County. Upgrade to freeway from 1.5 mi. south of Route 158 near Harviell to County Road 338, the total length of improvement being 1.647 miles.



From looking at the plans and this, I think it is.
Counties: Counties visited
Travel Mapping: Summary

I-39

Quote from: mvak36 on August 15, 2024, 10:39:19 AM
Quote from: splashflash on August 15, 2024, 08:49:26 AMUS 67 upgrade to freeway  :clap:
Phases 1b and 2? Of the Butler County MoDoT US 67 freeway project

(1): Job J9P3751 Route 67 BUTLER County. Upgrade to freeway, 3 bridges and 2 box culvert extensions from 2.0 miles south of Poplar Bluff to 4.5 miles south of Poplar Bluff, the total length of improvement being 2.504 miles.
(2): Job J9P3764 Route 67 BUTLER County. Upgrade to freeway from 1.5 mi. south of Route 158 near Harviell to County Road 338, the total length of improvement being 1.647 miles.



From looking at the plans and this, I think it is.

Is the first job closing the two at grade intersections just north of Route 158? What would that be for?

mvak36

Quote from: I-39 on August 15, 2024, 10:56:10 AM
Quote from: mvak36 on August 15, 2024, 10:39:19 AM
Quote from: splashflash on August 15, 2024, 08:49:26 AMUS 67 upgrade to freeway  :clap:
Phases 1b and 2? Of the Butler County MoDoT US 67 freeway project

(1): Job J9P3751 Route 67 BUTLER County. Upgrade to freeway, 3 bridges and 2 box culvert extensions from 2.0 miles south of Poplar Bluff to 4.5 miles south of Poplar Bluff, the total length of improvement being 2.504 miles.
(2): Job J9P3764 Route 67 BUTLER County. Upgrade to freeway from 1.5 mi. south of Route 158 near Harviell to County Road 338, the total length of improvement being 1.647 miles.



From looking at the plans and this, I think it is.

Is the first job closing the two at grade intersections just north of Route 158? What would that be for?
So it looks the first Job listed is actually Phase 2 and the second one is Phase 1B. I don't know if either project is for anything north of Route 158.
Counties: Counties visited
Travel Mapping: Summary

I-39

Quote from: mvak36 on August 15, 2024, 11:28:48 AM
Quote from: I-39 on August 15, 2024, 10:56:10 AM
Quote from: mvak36 on August 15, 2024, 10:39:19 AM
Quote from: splashflash on August 15, 2024, 08:49:26 AMUS 67 upgrade to freeway  :clap:
Phases 1b and 2? Of the Butler County MoDoT US 67 freeway project

(1): Job J9P3751 Route 67 BUTLER County. Upgrade to freeway, 3 bridges and 2 box culvert extensions from 2.0 miles south of Poplar Bluff to 4.5 miles south of Poplar Bluff, the total length of improvement being 2.504 miles.
(2): Job J9P3764 Route 67 BUTLER County. Upgrade to freeway from 1.5 mi. south of Route 158 near Harviell to County Road 338, the total length of improvement being 1.647 miles.



From looking at the plans and this, I think it is.

Is the first job closing the two at grade intersections just north of Route 158? What would that be for?
So it looks the first Job listed is actually Phase 2 and the second one is Phase 1B. I don't know if either project is for anything north of Route 158.

I see. I would imagine Phases 3 and 4 won't be too far behind as funding recently came in place.

mvak36

The winning bids for the August 16 letting were awarded at the MHTC meeting on 09/05/24.

Also, an update on few single project lettings. The July 8 letting was awarded at the MHTC meeting on July 10. The August 13 letting was awarded on August 14.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#260
September 27, 2024 Letting: Bid Results. Bid Award Winners.

Job JNWM0068 I-35 HARRISON County. Urgent bridge repair north of Bethany on East 280th Street over I-35, the total length of improvements being .025 mile.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#261
October 18, 2024 Letting: Bid Results. Bid Award Winners.

Job JNW0008 Route B, DD, H ANDREW, BUCHANAN County. 3 Bridge deck replacements on Route B over Upper Neely Branch near Bolckow, on Route DD over Jenkins Creek near Gower, and on Route H over Lincoln Creek near Fillmore, the total length of improvement being 0 miles.
Job JNW0034 Route 136 NODAWAY County. Resurface from Route 46 to Route J near Conception, the total length of improvement being 7.354 miles.
Job JNW0111 Route F, 59, T ATCHISON, HOLT County. 3 Bridge deck replacements on Route F over Rock Creek near Westboro, on Route 59 over Interstate 29 near Craig, and on Route T over Mill Creek near Forest City, the total length of improvement being 0 miles.
Job JNW0133 Route I-35, 69 CLINTON County. Concrete pavement replacement and pavement rehab on I-35 from Shoal Creek to north of Route 116 near Lathrop and on Route 69 from Shoal Creek to Route 116 near Lathrop, the total length of improvement being 16.31 miles.
Job JST0102 Route Various CALDWELL, DAVIESS, GENTRY, HARRISON, LIVINGSTON County. Resurface Rte T Gentry, Rte H Harrison, Rte CC, M, B, NN, V, T, and YY Daviess, Rte M and CC Caldwell, Rte A and T in Livingston, the total length of improvement being 74.954 miles.
Job J2P3354 Route 36 MARION, RALLS County. Pavement repairs and diamond grinding on eastbound lanes from 0.9 mile east of Rte. H to 1.8 miles east of Rte. 24 east junction and on westbound lanes from 0.7 mile west of Rte. 61 to 0.5 mile west of Rte. Z near Monroe City, the total length of improvement being 21.054 miles.

(1): Job JNE0040 Route DD RANDOLPH County. Resurface from County Road 1650 to Route 24 in Moberly, the total length of improvement being 10.278 miles.
(2): Job JNE0078 Route D RANDOLPH County. Resurface from Route C near Huntsville to Route BB, the total length of improvement being 3.527 miles.
(3): Job JNE0079 Route BB RANDOLPH County. Resurface from Route 3 to Route A near Moberly, the total length of improvement being 10.284 miles.

Job JNE0041 Route 94 MONTGOMERY, WARREN County. Seal Coat from Route 19 near McKittrick to St. Charles County line, the total length of improvement being 29.342 miles.
Job JST0104 Route O,C,CC,EE,M,O,U,JJ,Y AUDRAIN, MONROE, RALLS, RANDOLPH County. Resurface on Routes O and U in Randolph County, on Routes CC and JJ in Audrain County, on Routes Y and C in Audrain and Monroe Counties, on Route EE in Ralls County, and on Route M and U in Monroe County, the total length of improvement being 56.267 miles.
Job J4I3174 Route Various CASS, CLAY, JACKSON, PLATTE County. Job Order Contract for lighting repair at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4P3468 Route I-435 CLAY County. 4 Bridge rehabilitations over Parvin Road and 48th Street, the total length of improvement being 1.19 miles.
Job J4P3485 Route 291, I-29 JACKSON County. Bridge washing over the Missouri River in the urban Kansas City District, the total length of improvement being 1.015 miles.
Job JKR0090 Route 23 JOHNSON County. Resurface, signal, guardrail and adding right turn lane from Route 50 to Route DD, the total length of improvement being 1.924 miles.

(1): Job JKU0018 Route I-35 JACKSON County. Resurface from I-70 to Kansas state line, the total length of improvement being 3.41 miles.
(2): Job JKU0029 Route I-670 JACKSON County. Resurface from the Belleview Overpass to Troost Avenue, the total length of improvement being 2.028 miles.

Job JKU0036 Route 435 JACKSON County. Coldmill and resurface from Missouri River to Route 24, the total length of improvement being 2.846 miles.

(1): Job JKU0044 Route VV CASS County. Resurface from Route 7 to Route E, the total length of improvement being 4.688 miles.
(2): Job JKU0069 Route E JACKSON County. Resurface from Route 150 to Route KK, the total length of improvement being 2.037 miles.
(3): Job JKU0265 Route C CASS County. Resurface from Main Street to Route 2, the total length of improvement being 7.608 miles.
(4): Job JKU0435 Route KK CASS County. Resurface from Route E to 163rd St., the total length of improvement being 2.06 miles.

Job JKU0060 Route I-35 CLAY County. Resurface from 1.6 miles north of 128th Street to Pleasant Valley Road, the total length of improvement being 18.315 miles.
Job JKU0074 Route 40 JACKSON County. Coldmill and resurface from Sterling Avenue to I-70 in Grain Valley, the total length of improvement being 13.905 miles.
Job JKU0115 Route I-470, 291 JACKSON County. Drainage on the Northbound lanes of I-470, 291, south of the 291 Northbound on-ramp, the total length of improvement being 0.1 miles.
Job JKU0410 Route Various CASS, JACKSON County. 7 Bridge rehabilitations at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job JKU0421 Route V,Y,J,CC,B,Y CASS, CLAY, PLATTE, RAY County. Resurface on Routes V and Y in Platte County, on Routes J and CC in Clay County, on Route B in Ray County, on Route Y and B in Cass County, the total length of improvement being 44.909 miles.
Job JKU0443 Route F, ZZ, E CASS, CLAY, PLATTE County. Seal coat on Route F in Platte County, Route ZZ in Cass County, and Route E in Clay County, the total length of improvement being 4.734 miles.
Job J5P3433 Route AC, 63 BOONE County. Modify interchange configuration at Route AC and Route 63 in Columbia, the total length of improvement being 0.479 miles.
Job JCD0067 Route H, M DENT, PHELPS County. Resurface on Route H from Route 63 to Route 72 and on Route M from Route J to Route 63, the total length of improvement being 30.593 miles.
Job JCD0220 Route 54 COLE County. High friction surface treatment east of Pleasant Hill Road to .38 miles east of Gray Road, the total length of improvement being 0.286 miles.
Job JST0097 Route H, E, AC, NN, PP, JJ CAMDEN, LACLEDE, PULASKI County. Resurface on Route H from Route BB to Route 7, on Route E from Route 7 to Route A, on Route AC from Route N to Route K, on Route NN from Route 17 to SME, on Route PP from Route 28 to SME, and on Route JJ from Route T to Route F, the total length of improvement being 28.34 miles.
Job J5P3500 Route 54 MILLER County. Coldmill, resurface, and guard cable on Route 54 from Cole County line to Route 242, the total length of improvement being 0 miles.
Job JCD0148 Route V MILLER County. Resurface on Route V from 54 to end of state maintenance, the total length of improvement being 0 miles.

(1): Job JCD0055 Route E BOONE County. Resurface from Route 124 to north of Blackfoot Rd, the total length of improvement being 12.476 miles.
(2): Job JCD0066 Route VV, 63 OR, PP BOONE County. Resurface on Route VV from SME to Rte 763, on Route 63 OR from SME to Rte 763, on Route PP from Kircher Rd to Ballenger Rd, the total length of improvement being 10.897 miles.

Job JCDM0041 Route TT BOONE County. Coldmill and resurface from East of Fairview Rd to Route 740, the total length of improvement being 0.454 miles.
Job J6I3484 Route I-55 JEFFERSON, ST LOUIS, ST LOUIS CITY County. Sign replacement from I-44 to 0.2 mile south of Rte. TT, the total length of improvement being 44.2 miles.
Job J6Q2025E Route Various FRANKLIN, JEFFERSON, ST CHARLES, ST LOUIS, ST LOUIS CITY County. ITS maintenance at various locations throughout the St. Louis District, the total length of improvement being 0 miles.
Job J6S3582 Route 366 ST LOUIS County. Resurface, bridge replacement, ADA improvements, and signal improvements west of Geyer Road to the Saint Louis City limit, the total length of improvement being 6.29 miles.
Job JSL0028 Route 141 ST LOUIS County. Resurface from 0.5 mile north of I-70 to south of Casino Center Drive, the total length of improvement being 1.784 miles.
Job JSL0064 Route I-64 ST LOUIS CITY County. Resurface from Sarah Street to 22nd Street, the total length of improvement being 2.255 miles.
Job JSL0128 Route I-44 FRANKLIN, ST LOUIS, ST LOUIS CITY County. Pavement marking from I-70 to the Franklin County line, the total length of improvement being 69.235 miles.
Job JSL0011 Route 94 ST CHARLES County. Resurface from BNSF railroad crossing in Orchard Farm to Rte. J, the total length of improvement being 6.721 miles.
Job JST0109 Route K,F,JJ,TT,Y,F DALLAS, LACLEDE, WEBSTER County. Resurface on Routes F, JJ, TT and Y in Dallas County, Routes F and Y in Webster County and Route Y in Laclede County, the total length of improvement being 51.458 miles.
Job JST0110 Route W, A, DD, T, TT, W BENTON, HENRY, ST CLAIR County. Resurface on Routes A, DD and W in Benton County, Routes T and W in Henry County and Route TT in St. Clair County, the total length of improvement being 48.276 miles.
Job J7P3425C Route 60 WEBSTER County. Interchange at Route A in Diggins, the total length of improvement being 4.282 miles. Tentatively will be let in December.
Job J9P3575 Route 61 CAPE GIRARDEAU County. Drainage improvements from Williams Creek to the south intersection of Mount Auburn Road, the total length of improvement being 4.131 miles.
Job J9P3703 Route 60 NEW MADRID County. Shoulder improvements from 1 mile east of Route 114 to Route 61, the total length of improvement being 6.719 miles.
Job J9S3706 Route 25 CAPE GIRARDEAU County. Bridge rehabilitation over Headwater Diversion Channel near Dutchtown, the total length of improvement being 0.345 miles.
Job JSE0046 Route 38, 19, W, CC, B HOWELL, OZARK, RIPLEY, SHANNON, TEXAS, WRIGHT County. Scrub seal on Route 38 from Route 95 to Route 17, on Route 19 from Riverview Drive to north of Route 60, on Route W from Route 17 to Mountain View, on Route CC from Route 181 to Route 63 and on Route B from Route 160 to Route 142, the total length of improvement being 71.87 miles.
Job JSE0047 Route KK, T, N CAPE GIRARDEAU, PERRY, STE GENEVIEVE County. Scrub seal on Route KK from Route B to Route 61 near Friedheim, on Route T from Route BB to Route 51 near Perryville, and on Route N from Route M to end of state maintenance near Minnith, the total length of improvement being 34.821 miles.
Job JSEM0061 Route I-55 CAPE GIRARDEAU County. Truck parking 0.8 miles south of Route E, the total length of improvement being 1 miles.

EDIT: Additional Lettings Added
Job JST0101 Route Various HARRISON, WORTH County. Resurface on Route A, O, M, HH, UU, and YY in Harrison County, on Route D, F, K, O, and AA in Worth County, the total length of improvement being 51.285 miles.

Job JST0071 Route I - 64, I - 55, I-70 ST. LOUIS CITY, ST. LOUIS, ST. CHARLES AND PEMISCOT County. Bridge rehabilitations Bridge A1501 EB & WB over various city streets, Bridge A1700 about 3.6 miles southeast of Route 84 over the Mississippi River, bridge A3292 from about 1.4 miles southeast of Route 94 over the Missouri River, the total length of improvement being 3.566 miles.
Counties: Counties visited
Travel Mapping: Summary

ilpt4u

Quote from: mvak36 on September 24, 2024, 10:46:53 PMOctober 18, 2024 Letting:

Job J9P3703 Route 60 NEW MADRID County. Shoulder improvements from 1 mile east of Route 114 to Route 61, the total length of improvement being 6.719 miles.
Is this improvement related to I-57, I wonder?

mvak36

#263
October 25, 2024 Letting: Bid Results. Bid Award Winners.

Job JNW0145 Route I-29 HOLT County. Slide repair on I-29 northbound 1.1 miles south of Route W near County Road 110, the total length of improvement being 0.208 miles.
Counties: Counties visited
Travel Mapping: Summary

mvak36

The winning bids for the September 20 and September 27 lettings were awarded at the MHTC meeting on 10/02/24.

It looks like a few calls in the Sep 20 letting were awarded on Oct 3 and Oct 4.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#265
November 15, 2024 Letting: Bid Results. Bid Award Winners.

Job JNW0009 Route 169, M, B GENTRY, WORTH County. 3 Bridge deck replacements over Middle Fork of Grand River, East Fork of Grand River and Zounds Creek, the total length of improvement being 0.234 miles.
Job JNW0112 Route I-35 DAVIESS, HARRISON County. 2 Bridge deck replacements on Route N and Route 6, over I-35, the total length of improvement being 0.115 miles.

(1): Job J2S3195 Route ZZ MONTGOMERY County. Bridge replacement over Little Loutre Creek near Wellsville, the total length of improvement being 0.085 miles.
(2): Job J2S3314 Route K AUDRAIN County. Bridge replacement over Hickory Creek near Farber, the total length of improvement being 0.168 miles.

(1): Job J3S3191 Route T RAY County. Resurface from Route 210 to Route 10 near Richmond, the total length of improvement being 10.444 miles.
(2): Job JKU0071 Route DD CLAY County. Resurface from Litton Way to Route 92 near Smithville, the total length of improvement being 1.733 miles.
(3): Job JKU0418 Route F RAY County. Resurface from Route B to end of state maintenance near Richmond, the total length of improvement being 3.735 miles.

Job J4P3268D Route 58, 2, 7, 71, A, O CASS County. ADA improvements at various locations in Cass County, the total length of improvement being 2.907 miles.
Job JKU0059 Route I-29 CLAY County. Coldmill and resurface from 0.2 mile north of Parvin Road to Route 210, the total length of improvement being 1.317 miles.
Job JKU0116 Route Various JACKSON County. Lighting at various locations in Jackson County, the total length of improvement being 0 miles.
Job JKU0389 Route Various CASS, CLAY, JACKSON, PLATTE, RAY County. Sign replacements at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job JST0107 Route F, AA, O, W, EE, 127 JOHNSON, LAFAYETTE, PETTIS, SALINE County. Resurface on Routes F Johnson County, on Route EE Saline County, on Route 127, O, W, and AA Pettis County, the total length of improvement being 68.5 miles.

(1): Job J5P3574 Route 50 OSAGE County. Signalized intersection and ADA improvement at Route CC in Linn, the total length of improvement being 0.668 miles.
(2): Job JCD0044 Route 50 GASCONADE, OSAGE County. Coldmill and resurface from west of Linn to east of Rosebud, the total length of improvement being 34.734 miles.
(3): Job JCD0045 Route 19 GASCONADE County. Resurface from Route 50 to Crawford County line, the total length of improvement being 17.621 miles.

Job JCD0048 Route C, PP, HH LACLEDE County. Resurface from I-44 to Route 5, the total length of improvement being 20.97 miles.

(1): Job JCD0057 Route U MONITEAU County. Bridge deck replacement over Howard Creek near Jamestown, the total length of improvement being 0.079 miles.
(2): Job JCD0115 Route 179 MONITEAU County. Bridge deck replacement over Moniteau Creek near Jamestown, the total length of improvement being 0.109 miles.

Job JCD0058 Route 54/HH CALLAWAY, CRAWFORD County. 3 Bridge paintings on Route 54 near Fulton and on Route HH Crawford County near Cherryville, the total length of improvement being 0.142 miles.
Job JCD0085 Route Various PHELPS, PULASKI County. Resurface at various locations near St. James, St. Robert, and Doolittle, the total length of improvement being 19.289 miles.

(1): Job JCD0111 Route I-44 PULASKI County. Pavement widening on eastbound I-44 from Superior Road to 0.7 mile west of Route 66 Trail near St. Robert, the total length of improvement being 1.699 miles.
(2): Job JCD0112 Route I-44 PULASKI County. Pavement widening at westbound on-ramp at Loop 44 in St. Robert, the total length of improvement being 0.226 miles.

Job J5S3564 Route K,J DENT, SHANNON County. Resurface on Route J from Route 72 to Route 32 in Salem, on Route K from Route 19 to Route KK near Jadwin, the total length of improvement being 19.209 miles.
Job JCD0086 Route CC, T PHELPS County. Resurface on Route CC from Route 63 to State Maintenance Ends near Rolla and on Route T from I-44 to Route P near Doolittle, the total length of improvement being 7.471 miles.

(1): Job J5P3523 Route 50 COLE County. 3 Bridge rehabilitation over Route 50 and Vetter Lane in Jefferson City, the total length of improvement being 0.104 miles.
(2): Job J5P3525 Route 54 COLE County. 8 Bridge rehabilitations along Route 54 in Jefferson City, the total length of improvement being 0 miles.
Will be let in Dec

Job JCD0075 Route 50 COLE County. Bridge removal at Route 54 in Jefferson City, the total length of improvement being 0.032 miles.Will be let in Dec


(1): Job JCD0051 Route 179 COOPER, MONITEAU County. Seal coat from Route 98 to Route 87, the total length of improvement being 12.746 miles.
(2): Job JCD0068 Route Y BOONE, CALLAWAY County. Seal coat from Route 63 to Route J, the total length of improvement being 8.93 miles.

Job JCD0054 Route OR70 BOONE County. Seal coat from end of state maintenance to Route 740, the total length of improvement being 2.231 miles.
Job J6I3538 Route I-64 ST CHARLES, ST LOUIS County. Bridge rehabilitation and painting for the Boone Bridge, the total length of improvement being 1.972 miles.
Job J6I3571 Route I-70 ST LOUIS County. 12 Bridge paintings from Route 115 interchange to east of I-170 interchange, the total length of improvement being 1.458 miles.
Job J6S3283 Route 21 ST LOUIS County. Coldmill, resurface, signals, ADA improvements, and 2 bridge rehabilitations from Route 30 (Gravois Road) to the Meramec River and bridge rehabilitations over Gravois Creek and Grant's Trail, the total length of improvement being 8.141 miles.
Job JSL0034 Route O, F, NN FRANKLIN County. Coldmill, resurface, 2 bridge rehabilitations, signing, guardrail improvements from Osage St. to Rte. O, Rte. O from Rte. AT to Rte. F, Rte. NN from Rte. O to Rte. 30, Tiny Ridge Way Rd. from Rte. NN to EOM, the total length of improvement being 24.867 miles.
Job JSL0076 Route 340 ST LOUIS County. Coldmill, resurface and ADA improvements from I-270 to Industrial Dielman Court in Creve Coeur, the total length of improvement being 4.325 miles.
Job JSL0125 Route I-170 ST LOUIS County. Pavement marking from I-270 to I-64, the total length of improvement being 10.854 miles.
Job JSL0143 Route Various JEFFERSON, ST CHARLES, ST LOUIS County. Fixed Price Variable Scope for bridge deck sealing at various locations in the St. Louis District, the total length of improvement being 0 miles.
Job JSL0177 Route Various ST CHARLES, ST LOUIS County. Replace High Mast luminaires at various locations within St. Louis District, the total length of improvement being 0 miles.
Job JST0098 Route M FRANKLIN County. Resurface from Route 100 to Route AT near Villa Ridge, the total length of improvement being 2.287 miles.

(1): Job JSL0077 Route 109 ST LOUIS County. Coldmill, resurface and ADA improvements from Manchester Road to Wild Horse Creek Rd. in Wildwood, the total length of improvement being 4.426 miles.
(2): Job JSL0080 Route BA ST LOUIS County. Coldmill and resurface from Route 109 north intersection to Route 109 south intersection, near Babler State Park, the total length of improvement being 3.31 miles.

(1): Job J8S0736F Route CC CHRISTIAN County. Roudabout and ADA improvements at Main Street in Nixa, the total length of improvement being 0.13 miles.
(2): Job JSU0216 Route CC CHRISTIAN County. Add lanes and ADA improvements from south of Route CC to north of Tracker Road in Nixa, the total length of improvement being 0.456 miles.

(1): Job JSR0042 Route 160 BARTON, DADE County. Resurface and ADA improvements from SE 30th Lane to Route 39 near Greenfield, the total length of improvement being 26.661 miles.
(2): Job JSR0163 Route 160 BARTON County. Coldmill and resurface from 0.1 mile west of NW 1 Lane in Lamar to SE 30th Lane, the total length of improvement being 3.241 miles.
(3): Job JSR0164 Route 97 DADE, LAWRENCE County. Resurface from Route 160 in Dade to Route 96 in Lawrence, the total length of improvement being 14.01 miles.

Job JSR0094 Route 13 STONE County. Roundabout at the intersection Route 160 near Reeds Spring, the total length of improvement being 0.211 miles.
Job JSR0296 Route Various BARRY, BARTON, JASPER, LAWRENCE, STONE County. Seal coat on various routes in Southwest District, the total length of improvement being 91.84 miles.
Job JSR0095 Route 60 BARRY, NEWTON County. Intersection improvements at Route Y/CC, at Hammer Road, at Oak Ridge Drive, at Route HH, at Routes M/W, and at Route 97, the total length of improvement being 1.72 miles.
Job JST0111 Route AB,UU,C,B,O,HH,DD DALLAS, HICKORY, POLK County. Resurface on Route O in Hickory County, Route C in Dallas, and Routes B, C, O, AB, and UU in Polk County. Potential additional alternates on Route HH in Dallas, Hickory, Polk County and on Route B in Dallas County, the total length of improvement being 53.92 miles.
Job J8S3238 Route 125 GREENE County. Roundabout at I-44 ramps and at Chestnut Street, add signal at Route OO and add turn lane from Washington Avenue to Route OO in Strafford, the total length of improvement being 0.762 miles.
Job JSRM0039 Route CC WEBSTER County. Barrier repair at I-44 in Marshfield, the total length of improvement being 0.04 miles.
Job JSR0296B Route A ST CLAIR County. Seal coat from Route 13 to Route 52 near Appleton City, the total length of improvement being 16.898 miles.
Job JSR0296C Route MM BENTON County. Seal coat from Pratt Avenue to Route 83 near Warsaw, the total length of improvement being 5.947 miles.
Job J9P3548 Route Route 21 IRON County. Resurface and safety improvements from Route E to Route 49 in Arcadia, the total length of improvement being 8.033 miles.
Job J9P3667 Route 62 DUNKLIN County. Resurface from Arkansas State line to Route 53 and from Route 53 to Route 25 near Campbell, the total length of improvement being 10.056 miles.
Job J9P3701 Route 14 DOUGLAS, HOWELL County. Resurface and guardrail replacement from Route 181 south to Route 63, the total length of improvement being 20.156 miles.
Job JSE0002 Route 67 ST FRANCOIS County. Coldmill and resurface Jefferson County line to Route 221, the total length of improvement being 21.106 miles.
Job JSE0020 Route 95 DOUGLAS County. Resurface from Route 76 to Route 14 near West Plains, the total length of improvement being 9.46 miles.
Job JSE0115 Route 158 BUTLER County. Bridge replacement Over Craven Ditch near Harvell, the total length of improvement being 0.152 miles.
Job JSE0198 Route 67 WAYNE County. Bridge rehabilitation over the St. Francis River near Greenville, the total length of improvement being 0.172 miles.
Job J9S3516 Route 61 NEW MADRID County. Coldmill and resurface from Route 60 to I-55 near Matthews, the total length of improvement being 20.691 miles.
Job JSEM0070 Route 60 WRIGHT County. Diamond grooving in the eastbound lane from 0.7 mile west of Route EE to 0.3 miles west of Route EE, the total length of improvement being 0.34 miles.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#266
November 27, 2024 Letting: Bid Results. Bid Award Winners.

Job JST0016B Route I-70 SALINE County. 2 Bridge replacements over I-70 on Lemon Trail and over I-70 on Nitrogen Avenue, the total length of improvement being 0.198 miles.
Counties: Counties visited
Travel Mapping: Summary

mvak36

The winning bids for the October 18 and October 25 lettings were awarded at the MHTC meeting on 11/08/24.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#268
December 13, 2024 Letting:

(1): Job J1I3262 Route I-29 ANDREW County. 2 Bridge rehabilitations over Mill Creek, 2.2 miles north of Route K near Amazonia, the total length of improvement being 0.181 miles.
(2): Job J1I3280 Route I-29 ATCHISON County. 2 Bridge rehabilitations over Mill Creek, 0.2 miles south of Route Z near Corning, the total length of improvement being 0.149 miles.

Job J2I3309 Route I-70 MONTGOMERY, WARREN County. Coldmill and resurface from 1.4 miles east of Route F to east of Route MM in Warrenton, the total length of improvement being 20.425 miles.
Job J3S3162 Route Y LAFAYETTE, SALINE County. Bridge replacement over I-70 north of Emma, the total length of improvement being 0.13 miles.
Job J4S3453 Route D CASS County. Bridge replacement over Coldwater Creek, 0.1 mile south of East 319th Street and 0.3 miles north of 323rd Street, the total length of improvement being 0.098 miles.

(1): Job JCD0097 Route I-70 VARIOUS County. Pavement marking on I-70 in Cooper, Boone, and Callaway Counties, the total length of improvement being 115.489 miles.
(2): Job JCD0104 Route I-44 VARIOUS County. Pavement marking on I-44 in Laclede, Pulaski, Crawford and Phelps counties, the total length of improvement being 221.453 miles.

Job JCD0113 Route 87 MONITEAU County. Roundabout at Route C near High Point, the total length of improvement being 0.137 miles.
Job JCD0209 Route I-44 PHELPS County. High friction surface treatment on I-44 westbound near Rolla, the total length of improvement being 1.149 miles.
Job J6S3669 Route 67 ST LOUIS County. 2 Bridge deck replacements and 1 bridge rehabilitation over Lynn Haven Lane, over Coldwater Creek 0.1 mile north of Patterson Road, and over Coldwater Creek 0.5 miles north of Route AC (New Halls Ferry), the total length of improvement being 0.776 miles.
Job JSL0035 Route 100 FRANKLIN County. Coldmill, resurface, bridge deck replacement and bridge deck rehabilitation from 0.1 mile east of Fifth Street to 0.2 miles west of Route OO, the total length of improvement being 15.716 miles.
Job JSL0042 Route 231 JEFFERSON County. Coldmill and resurface from Route 61 to the Meramec River, the total length of improvement being 2.061 miles.
Job JSL0127 Route I-70 ST CHARLES, ST LOUIS, ST LOUIS CITY County. Pavement marking from Warren County line to the Mississippi River, the total length of improvement being 45.52 miles.
Job JSL0075 Route I-70 ST LOUIS CITY County. Microsurfacing from Goodfellow Blvd. to Kingshighway Blvd., the total length of improvement being 1.931 miles.

(1): Job JSR0053 Route Various DADE, MCDONALD, TANEY County. 5 Bridge rehabilitations on I-49 in Jasper and McDonald Counties, on Route 160 in Dade County, and on Route 65, BU 65 and Branson Landing Boulevard in Taney County, the total length of improvement being 0.518 miles.
(2): Job JSR0053D Route 76 TANEY County. Bridge rehabilitation over Lake Taneycomo and Missouri and Northern Arkansas Railroad, the total length of improvement being 0.206 miles.

(1): Job J8I3044C Route I-44 GREENE County. Grading, drainage, and pavement from Route H to Route 65 in Springfield, the total length of improvement being 2.03 miles.
(2): Job J8I3225 Route I-44 GREENE County. Resurface from 0.6 miles west of Route 266 (Chestnut Expwy) to Route 160 in Springfield, the total length of improvement being 3.637 miles.
(3): Job JST0088B Route I-44 GREENE County. Pavement improvements from Route 13 to Route 65 in Springfield, the total length of improvement being 4.705 miles.
(4): Job JSU0076 Route I-44 GREENE County. Grading, drainage, bridge, and pavement from Route 13 to Route H in Springfield, the total length of improvement being 2.675 miles.
(5): Job JSU0114 Route I-44 GREENE County. Sound abatement on the eastbound lanes from Summitt Avenue to National Avenue in Springfield, the total length of improvement being 0.469 miles.

(1): Job JSR0097 Route 59, 90, O MCDONALD, NEWTON County. Sign installation on Route 90 at Slate Gap Lane near Jane, on Route 59 from 0.1 mile south of Mount Shira Road in Ginger Blue, and on Route O south of Queen's Lace Drive near Stella, the total length of improvement being 0.4 miles.
(2): Job JSR0099 Route Various BARRY, LAWRENCE, STONE, TANEY, WEBSTER County. Sign installation at various locations on Routes 39, 76, 160, 90, 176, 248, 265 and KK in Barry, Lawrence, Stone, Taney, and Webster Counties, the total length of improvement being 33.096 miles.

Job J9P3736 Route 72 IRON, MADISON County. Resurface and add shoulders from Route 67 to Route 21 near Arcadia, the total length of improvement being 17.982 miles.

(1): Job J9S3672 Route 158 BUTLER County. Resurface from Route 67 to Route 142 near Harviell, the total length of improvement being 4.962 miles.
(2): Job J9S3673 Route 142 BUTLER County. Resurface and bridge rehabilitation from Route HH to Route 53 near Harviell, the total length of improvement being 13.076 miles.

(1): Job J9S3722 Route BU 60 NEW MADRID, SCOTT County. Resurface and add shoulders from Route 60 to Route 114 near Sikeston, the total length of improvement being 1.278 miles.
(2): Job J9S3741 Route BB SCOTT County. Resurface and add shoulders from Route ZZ to Route 114 near Sikeston, the total length of improvement being 3.817 miles.
(3): Job J9S3743 Route ZZ SCOTT County. Resurface and add shoulders from beginning of state maintenance to Route 61, the total length of improvement being 4.109 miles.

Job JSE0129 Route Various VARIOUS County. Sign replacements on major highways in the Southeast District, the total length of improvement being 440.949 miles.

EDIT: Additional Lettings Added
(1): Job J5P3523 Route 50 COLE County. 3 Bridge rehabilitations at Bolivar St. and Vetter Ln. in Jefferson City, the total length of improvement being 0 miles.
(2): Job J5P3525 Route 54 COLE County. 8 Bridge rehabilitations at various location near Jefferson City, the total length of improvement being 0 miles.

Job JCD0075 Route 50 COLE County. Bridge removal at Route 54 in Jefferson City, the total length of improvement being 0.032 miles.
Counties: Counties visited
Travel Mapping: Summary

mvak36

The winning bids for the November 15 and November 27 lettings were awarded at the MHTC meeting on 12/04/24.
Counties: Counties visited
Travel Mapping: Summary

mvak36

January 17, 2025 Letting:

Job J1S3414 Route D CALDWELL County. Bridge replacement over Shoal Creek, the total length of improvement being 0.219 miles.

(1): Job JNW0035 Route 116 BUCHANAN, CLINTON County. Resurface from Route 59 near Rushville to Route 169, the total length of improvement being 28.945 miles.
(2): Job JNW0038 Route 6 DAVIESS, DEKALB County. Coldmill and resurface from Route 31 to Route 69 near Altamont, the total length of improvement being 22.393 miles.

Job JNW0146 Route 36 CALDWELL, LINN, LIVINGSTON County. Pavement repair 0.3 miles west of Route 13 near Hamilton to 2 miles east of Route 129 near Bucklin, the total length of improvement being 98.056 miles.

(1): Job JNE0049 Route V ADAIR County. Bridge Replacement over North Timber Branch 0.9 miles south of Route 6 near Brashear, the total length of improvement being 0.076 miles.
(2): Job JNE0141 Route E ADAIR County. Bridge replacement over Bear Creek 1.6 miles west of Route V near Gibbs, the total length of improvement being 0.108 miles.

Job JNE0050 Route J SHELBY County. Bridge replacement over Tiger Fork Creek 0.6 miles west of Route W near Bethel, the total length of improvement being 0.097 miles.
Job JNE0123 Route RA MONTGOMERY County. Bridge rehabilitation over Little Loutre Creek 0.5 miles west of Route ZZ, the total length of improvement being 0.069 miles.

(1): Job J4S3496 Route 9 CLAY County. 2 Bridge deck replacement over NW Briarcliff Parkway in Riverside, the total length of improvement being 0.057 miles.
(2): Job J4S3497 Route 9 PLATTE County. 2 Bridge deck replacement over Riverway Blvd in Riverside, the total length of improvement being 0.053 miles.
(3): Job J4S3498 Route 9 PLATTE County. 2 Bridge deck replacement over Line Creek in Riverside, the total length of improvement being 0.098 miles.

Job JKU0043 Route 150 JACKSON County. Coldmill and resurface from Route 291 to Route 50, the total length of improvement being 11.423 miles.
Job J5I3561 Route I-44 PHELPS County. Bridge rehabilitation over Little Piney Creek and BNSF Railroad, the total length of improvement being 0.392 miles.

(1): Job J5P3560 Route 54 COLE County. Bridge replacement over Neighorn Branch, the total length of improvement being 0.488 miles.
(2): Job JCD0157 Route 54 COLE County. Bridge deck replacement over Neighorn Branch, the total length of improvement being 0.18 miles.

Job JST0127 Route Various CRAWFORD, PHELPS County. Resurface on Route KK from Route ZZ near Cuba, on Route F from Route 19 to I-44, and Route EE from County Road 91 to Route B near St. James, the total length of improvement being 24.73 miles.
Job JSL0012 Route Z ST CHARLES County. Resurface and ADA improvements from Route N to Route D in New Melle, the total length of improvement being 4.305 miles.

(1): Job JSL0078 Route 141 ST LOUIS County. Coldmill and resurface from St. Luke's Hospital Road to I-64, the total length of improvement being 1.347 miles.
(2): Job JSL0121 Route 141 ST LOUIS County. Interchange improvement from I-64 to 0.62 south of I-64, the total length of improvement being 1.018 miles.

Job JSL0173 Route I-44, 364 FRANKLIN, ST CHARLES, ST LOUIS, ST LOUIS CITY County. Pavement marking on 364 from Technology Drive to 0.5 mile west of I-270 and on I-44 from 0.3 mile west of Route 47 to I-70, the total length of improvement being 89.035 miles.
Job JSL0210 Route Various FRANKLIN, ST CHARLES, ST LOUIS, ST LOUIS CITY County. Fixed Price Variable Scope for Crackfill at various locations in the St. Louis District, the total length of improvement being 53.406 miles.
Job J6I3624B Route I-170 ST LOUIS County. Bridge replacement over Pershall Road at I-270 interchange, the total length of improvement being 0.2367 miles.
Job JSLM0045 Route I-270 ST LOUIS County. Drainage improvements and culvert cleanouts 0.6 miles south of I-70 and 1 56 miles south of I-70, the total length of improvement being 0.105 miles.
Job J6S3619 Route KK FRANKLIN County. Resurface and pavement repair from Route C to Route 185, the total length of improvement being 5 miles.
Job J6S3619B Route KK FRANKLIN County. Resurface and pavement repair from Route 185 to Route 100, the total length of improvement being 4.98 miles.
Job JSL0145 Route Various FRANKLIN, JEFFERSON County. Fixed Price Variable Scope for seal coat on Route H from Route 50 to Route 185, on Route Z from Route A to Route I-55, on Route AT from Route 100 to Route 50, on Route BB from Route A to Route 50, on Route TT, all locations near Union, the total length of improvement being 25.192 miles.
Job JSLM0053 Route Various FRANKLIN, JEFFERSON, ST FRANCOIS County. Fixed Price Variable Scope for seal coat on Route ZZ from Beemont Scholl Rd to Route C, on Route UU from Route 50 to end of state maintenance, on Route ZZ from Route Y to Route C, the total length of improvement being 11.967 miles.
Job JSR0062 Route 7 BENTON County. Bridge rehabilitation over Truman Reservoir, the total length of improvement being 0.406 miles.
Job J7P3425C Route 60 WEBSTER County. Interchange at Route A in Diggins, the total length of improvement being 9.78 miles.
Job J7P3457 Route 13, 39 BARRY, STONE County. 2 Bridge washings on Route 13 over Table Rock Lake in Kimberling City and on Route 39 over Table Rock Lake in Shell Knob, the total length of improvement being 0.645 miles.
Job J9P3308 Route 74 CAPE GIRARDEAU County. Bridge rehabilitation over the Mississippi River near Cape Girardeau, the total length of improvement being 1.032 miles.
Job J9P3690 Route 17 TEXAS County. Bridge deck replacement over Roubidoux Creek, the total length of improvement being 0.127 miles.
Job J9P3842 Route 72 BOLLINGER County. Roundabout at the intersection of Route 72 and Route 51, the total length of improvement being 0.492 miles.
Job J9S3716 Route N BOLLINGER, CAPE GIRARDEAU County. Scrub seal and shoulder improvements from Route 51 in Bollinger County to Route 25 in Cape Girardeau County, the total length of improvement being 17.377 miles.
Job J9S3813 Route M SCOTT County. Coldmill, resurface and bridge rehabilitation from Route A to I-55, the total length of improvement being 7.053 miles.

(1): Job JSE0027 Route 137 TEXAS County. Bridge replacement over Pine Creek, the total length of improvement being 0.133 miles.
(2): Job JSE0028 Route 137 TEXAS County. Bridge replacement over Big Creek, the total length of improvement being 0.146 miles.
(3): Job JSE0029 Route 137 TEXAS County. Bridge replacement over South Fork of Jacks Fork River, the total length of improvement being 0.177 miles.

Job JSEM0069 Route 60 WRIGHT County. Drainage improvements 3.0 miles east of Route E, the total length of improvement being 0.01 miles.

(1): Job JSE0052 Route Y SCOTT, STODDARD County. Scrub seal from 2.3 miles east of Route 25 to Kingshighway in Sikeston, the total length of improvement being 20.139 miles.
(2): Job JSE0053 Route WW DUNKLIN County. Scrub seal from Route 53 to Route J, the total length of improvement being 5.579 miles.
(3): Job JSE0054 Route N DUNKLIN County. Scrub Seal from Route 412 to Route 153, the total length of improvement being 6.884 miles.
(4): Job JSE0079 Route D DUNKLIN, NEW MADRID County. Scrub seal from Route 25 to Route 61, the total length of improvement being 22.103 miles.
(5): Job JSE0080 Route U NEW MADRID County. Scrub seal from Route D to Route 61, the total length of improvement being 4.458 miles.
(6): Job JSE0081 Route H SCOTT County. Scrub seal from Route 77 to Route U, the total length of improvement being 5.77 miles.
(7): Job JSE0082 Route E SCOTT County. Scrub seal from Route 77 to Commerce, the total length of improvement being 7.942 miles.

Job JSE0055 Route F DUNKLIN County. Scrub Seal from Route 412 to Arkansas State line, the total length of improvement being 5.701 miles.
Counties: Counties visited
Travel Mapping: Summary



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.