Author Topic: Montana Avenue US 62/180 Frwy work has started in El Paso  (Read 1253 times)

DJStephens

  • *
  • Online Online

  • Posts: 777
  • Age: 46
  • Location: Las Cruces NM 88012
  • Last Login: Today at 12:17:33 PM

  Upgrades to limited access for Montana Avenue (US 62 - 180) has started in East El Paso.  Drove through area last week, on way to work in the oil fields, and noticed grubbing and pier erection work at major future interchanges has begun.   
   Appears route will go from Yarborough avenue on the west, to just E of Loop 375 in the east.   Also appears route will be slightly shifted to N, with current Montana Avenue eastbound becoming the eastbound future frontage.   
   Montana Avenue, east of Yarborough was just six laned just a few years ago, with all new overhead signal gantries at major intersections.   Have to wonder why they didn't just use "temporary" signal heads strung from telephone poles as an interim measure.  Money to burn.   
   Project does not extend westward far enough, imho.  Should use pre-existing ROW from long-dead Trowbridge/Montana Frwy concept of the sixties and continue to just west of Hawkins Blvd.   Currently there is a car wash being allowed to be built on the SE corner of the Montana/Hawkins intersection, and congestion in and at the intersection is very bad.   There is also a Border patrol station just east of that Hawkins intersection, along with a weird EB lane split meant to separate Border patrol and general traffic to a degree.
   Baby steps, would guess.   
Logged

Bobby5280

  • *
  • Offline Offline

  • Posts: 2447
  • Location: Lawton, OK
  • Last Login: April 09, 2021, 03:03:37 PM
Re: Montana Avenue US 62/180 Frwy work has started in El Paso
« Reply #1 on: July 30, 2019, 05:31:13 PM »

The Montana Avenue freeway project ultimately needs to be a more ambitious project. Yarbrough Drive to Loop 375 is a start, but the freeway needs to be significantly extended both to the East and West.

There is a lot of cluttered crap along Montana Ave from Wedegewood Drive on West to Hawkins Blvd. But a bunch of that property doesn't look very valuable. In a perfect world the freeway would extend far enough to give El Paso Int'l Airport at least some kind of limited access link to the city's system of freeway. A direct link to I-10 is all but impossible.

Question: was Edgemere Linear Park once the site of a planned freeway? Edgemere Blvd looks like a pair of frontage roads with a park in the median. With the way El Paso is laid out now there's really nothing else that can be done with that park other than to leave it as a park.
Logged

DJStephens

  • *
  • Online Online

  • Posts: 777
  • Age: 46
  • Location: Las Cruces NM 88012
  • Last Login: Today at 12:17:33 PM
Re: Montana Avenue US 62/180 Frwy work has started in El Paso
« Reply #2 on: August 11, 2019, 12:46:15 PM »

The Montana Avenue freeway project ultimately needs to be a more ambitious project. Yarbrough Drive to Loop 375 is a start, but the freeway needs to be significantly extended both to the East and West.

There is a lot of cluttered crap along Montana Ave from Wedegewood Drive on West to Hawkins Blvd. But a bunch of that property doesn't look very valuable. In a perfect world the freeway would extend far enough to give El Paso Int'l Airport at least some kind of limited access link to the city's system of freeway. A direct link to I-10 is all but impossible.

Question: was Edgemere Linear Park once the site of a planned freeway? Edgemere Blvd looks like a pair of frontage roads with a park in the median. With the way El Paso is laid out now there's really nothing else that can be done with that park other than to leave it as a park.

The biggest problem on Montana Ave.  E of the end of the current project would be the need to slice off part of an apartment complex (Desert Trees) and a section of a golf course bordering the south side of Montana between Wedgwood and Hawkins.  The golf course likely would be the hardest section to "slice off" a piece of.    Am assuming it's private and has influential members.  The properties on the N side of Montana in that vicinity are mainly automotive and most utilize vacant ROW from the failed sixties freeway to their benefit.   There is a large aging Border Patrol office/station also, which could be relocated and demolished.   
No idea about the Edgemere median.  Have seen it, but believe it was not intended for eventual freeway.  The aborted sixties Trowbridge/Montana Ave freeway was to be placed nearly directly atop those respective routes.  Have seen a crude map on the Texas freeways web site.   
The El Paso airport, yes would agree has poor access.   A surface street (Airway) needs to be navigated in order to reach it from Interstate 10.  The airport is easier to reach from the newer Spur 601 from the N/NE but surface roads still need to used to reach it.  Believe as recently as the mid nineties, a corridor could have been carved out in order to bring an Interstate grade spur to the airport, but valuations of properties have increased dramatically, and retail and commercial activities in that area have been greatly intensified.   Over intensification of land use, imho.   
« Last Edit: August 13, 2019, 08:23:11 AM by DJStephens »
Logged

Stephane Dumas

  • *
  • Offline Offline

  • Posts: 2198
  • Last Login: Today at 09:01:04 AM
Re: Montana Avenue US 62/180 Frwy work has started in El Paso
« Reply #3 on: November 18, 2020, 07:51:39 PM »

I bump this thread by mentionning the recent Youtube clip posted last September about Montana Ave. upgrades.
Logged

Bobby5280

  • *
  • Offline Offline

  • Posts: 2447
  • Location: Lawton, OK
  • Last Login: April 09, 2021, 03:03:37 PM
Re: Montana Avenue US 62/180 Frwy work has started in El Paso
« Reply #4 on: November 18, 2020, 09:07:14 PM »

The beginnings of the Montana Ave Freeway project are visible in Google Street view. It's imagery dated February, 2020. The West end of the dirt work is at Limerick Road, which is a couple or so blocks West of the Yarbrough Road/Global Reach Drive intersection. The East End is the near the Montana intersection with Justice/Tierra Este. Basically, it's the easiest section along Montana Avenue to upgrade into a freeway.

Going farther West of Loop 375 to Zaragosa Road they could squeeze a 4-lane freeway into existing Montana Avenue using slip ramps and some elevated structures. It would be better than nothing. The current project just to the West of Loop 375 has a pretty wide ROW. You can get a good glimpse of it via 3/2020 Street View imagery on SB Loop 375. Freeway upgrades of US-62 to the East of Zaragosa Road would have to involve clearing a lot of existing buildings. The ROW gets too narrow there. Still, over the very long term it would be nice if US-62 had a Interstate quality outlet going East out of the El Paso area.
Logged

DJStephens

  • *
  • Online Online

  • Posts: 777
  • Age: 46
  • Location: Las Cruces NM 88012
  • Last Login: Today at 12:17:33 PM
Re: Montana Avenue US 62/180 Frwy work has started in El Paso
« Reply #5 on: November 20, 2020, 10:53:05 PM »

Essentially, the WB mainlines and frontage are being done first.  Several braided WB braided ramps along the corridor are complete, and waiting for WB traffic to be diverted onto the new structures.  With that done, the former WB lanes of Montana Ave can be closed, and work begun on the matching EB mainlines.  The existing Montana EB lanes will become the EB frontage.   
Am guessing the flyovers @ Yarbrough and Loop 375 will be constructed last.   
Logged

Stephane Dumas

  • *
  • Offline Offline

  • Posts: 2198
  • Last Login: Today at 09:01:04 AM
Re: Montana Avenue US 62/180 Frwy work has started in El Paso
« Reply #6 on: November 21, 2020, 02:17:23 PM »

Going farther West of Loop 375 to Zaragosa Road they could squeeze a 4-lane freeway into existing Montana Avenue using slip ramps and some elevated structures. It would be better than nothing. The current project just to the West of Loop 375 has a pretty wide ROW. You can get a good glimpse of it via 3/2020 Street View imagery on SB Loop 375. Freeway upgrades of US-62 to the East of Zaragosa Road would have to involve clearing a lot of existing buildings. The ROW gets too narrow there. Still, over the very long term it would be nice if US-62 had a Interstate quality outlet going East out of the El Paso area.

I wonder if it could be possible to uprade it into a "jersey freeway" like part of Main St/US-90A in the south of Houston?
Logged

Bobby5280

  • *
  • Offline Offline

  • Posts: 2447
  • Location: Lawton, OK
  • Last Login: April 09, 2021, 03:03:37 PM
Re: Montana Avenue US 62/180 Frwy work has started in El Paso
« Reply #7 on: November 21, 2020, 05:47:50 PM »

I think a "Jersey Freeway" setup would be very do-able. Put up a median barrier to eliminate all of the traffic cross-overs except at the most prominent, signal-controlled intersections. The convert those intersections into freeway exits piece-meal style.

Honestly, as depressed looking as the properties appear out East of the Zaragosa Road exit along US-62, TX DOT might not have as difficult a time buying and clearing properties for future freeway ROW out that way. There is a lot of open parcels along the North side of US-62. Perhaps if they opened that corridor up for a future freeway it might encourage a lot of improvement and new development in the Homestead Meadows North and South neighborhoods.

I think US-62 at least needs to be a divided 4-lane highway through the mountains East of Butterfield just for the sake of safety.
Logged

DJStephens

  • *
  • Online Online

  • Posts: 777
  • Age: 46
  • Location: Las Cruces NM 88012
  • Last Login: Today at 12:17:33 PM
Re: Montana Avenue US 62/180 Frwy work has started in El Paso
« Reply #8 on: December 18, 2020, 07:55:58 AM »

The four lane section E of Zaragosa Rd was four laned not that long ago.  Nineties time frame.  They recently added cable barriers along both sides of the gravel median, not that long ago.  Would doubt they will do anything with that section (E of Zaragosa) in the near to medium future.  The Zaragosa overpass, itself, btw, is lousy. Skewed and shifted off the mainline, and no provision for a third lane in each direction.   The properties along the EB frontages are still vacant.  There should have been additional acquisition there, in order to have built a proper Diamond interchange in the first place, with no shifting, and room for an additional lane, on US 62/180 in each direction.   
Logged

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.