January 19, 2018 Letting: Bid Results. Bid Award Winners.

Notable Projects:
Job J1P3108 Route 10 CARROLL County. Resurfacing from Rte. FF to Bus. 65 near Carrollton, the total length of improvement being 14.166 miles.
Job J2P3059C Route 24/61 MARION County. Bridge rehabilitation over South Fabius River 1.2 miles south of Rte. 6 near Taylor, the total length of improvement being 0.087 miles.
Job J3I3009 Route I-70 SALINE County. Bridge rehabilitation at Route 65 interchange, 3.3 miles east of Route YY and 6.6 miles west of Route J, the total length of improvement being 0.896 miles.
Job J3P3061 Route 65 SALINE County. Coldmill and resurface from Bus. 65 to Pettis County Line, the total length of improvement being 10.612 miles.
Job J3S3058 Route WW LAFAYETTE County. Bridge deck replacement over I-70, 2.3 miles west of Route 131 and 3.4 miles east of Route D, the total length of improvement being 0.108 miles.
Job J4I3242 Route I-435 PLATTE County. Slide repair south of Prairie Creek, the total length of improvement being 0.104 miles.
Job J4P3140 Route 69 CLAY County. Coldmill and resurface SB McCleary to Lightburne and NB Fishing River to McCleary, the total length of improvement being 8.93 miles.
Job J4P3156 Route 50 JACKSON County. Resurfacing from RA to County Line, the total length of improvement being 12.25 miles.
Job J4S3152 Route 2 CASS County. Bridge rehabilitation interchange in the City of Harrisonville, the total length of improvement being 0.184 miles.
Job J5I3226 Route I-44 CRAWFORD, LACLEDE County. Pavement repairs from Elm St. at Lebanon to 0.4 miles west of Rte. 133 and on the EB lanes from 1.2 miles east of Rte. ZZ to 0.5 miles west of Rte. H in Crawford County, the total length of improvement being 23.87 miles.
Job J5I3300 Route 44 LACLEDE County. Shoulder improvements 6 miles south of Lebanon, the total length of improvement being 11.096 miles.
Job J5P3109 Route 7 PULASKI County. Bridge painting over the Gasconade River, the total length of improvement being 0.141 miles.
Job J5P3118 Route 54 COLE County. Coldmill and resurface from just west of Stadium Blvd to the Missouri River Bridge, the total length of improvement being 1.825 miles.
Job J5P3165 Route 63 BOONE County. Bridge rehabilitation over Bonne Femme Creek, the total length of improvement being 0.347 miles.
Job J6I3150 Route I-44 ST LOUIS CITY County. Bridge replacements and rehabilitation's at Kingshighway Blvd., Thurman Ave., and 39th St. and rehab bridges at UP RR, Vandeventer Ave., and Tower Grove Ave, the total length of improvement being 1.312 miles.
Job J6I3182 Route 61, 70 ST CHARLES County. Bridge rehabilitation ramps at Interchange, the total length of improvement being 1.072 miles.
Job J6P2345 Route 21 JEFFERSON County. Intersection improvements at Route 110 north of DeSoto, the total length of improvement being 0.312 miles.
Job J6S3160 Route 30 JEFFERSON County. Microsurfacing from St. Louis county line to west of Route PP near High Ridge, the total length of improvement being 5.272 miles.
Job J6S3161 Route 47 FRANKLIN County. Microsurfacing from Commercial St in St. Clair to Norwood Trailer Ct in Washington, the total length of improvement being 11.36 miles.
Job J7I3204 Route I-44 NEWTON County. Bridge rehabilitation in Newton County over Shoal Creek, the total length of improvement being 0.336 miles.
Job J7P3000 Route I-49 JASPER County. Bridge rehabilitation over BNSF Railroad and Spring River in Carthage, the total length of improvement being 1.502 miles.Job J8P3111 Route 65 GREENE County. Pavement rehabilitation at the interchange of I-44 and at the interchange of Route 60, the total length of improvement being 0.592 miles.
Job J9S3290 Route 74 CAPE GIRARDEAU County. Resurface from Route 25 to I-55, the total length of improvement being 5.19 miles.                 

The following set of projects was let as one project (for each set):
(1): Job J2P3151 Route 61 CLARK, LEWIS County. Coldmill and resurfacing from Iowa State Line to Rte. 27 and six disconnected sections on southbound lanes, the total length of improvement being 16.009 miles.
(2): Job J2P3219 Route 61 LEWIS County. Safety improvements on northbound lanes from 0.9 miles north of Rte. B south junction to 0.4 mile south of Rte. B north junction near Canton, the total length of improvement being 10.295 miles. 
Counties: Counties visited
Travel Mapping: Summary


mvak36

#26
Article about major construction projects for 2018 in the Kansas City area. 2018 construction list in Southwest Missouri. If I find any other articles for other regions in the state, I will update this post.

Also, a gas tax increase will be debated again this year in the legislature. The 21st Century Missouri Transportation System Task Force recommended an increase of 10 cents, among other revenue sources for roads. If it passes through the legislature, it will go to a public vote in November. I'm cautiously optimistic it will pass, but then again it is Missouri  :-|.

EDIT: NW Missouri 2018 project list

Counties: Counties visited
Travel Mapping: Summary

mvak36

#27
MODOT will be converting the I-70/I-435 interchange near the stadiums to a partial turbine interchange. Say goodbye to those left hand exits.

https://www.kshb.com/news/local-news/big-change-coming-to-busy-interchange-in-kcmo.
QuoteKANSAS CITY, Mo. -- Changes are coming to the I-70 and I-435 interchange near Arrowhead and Kauffman Stadium.

The interchange sees about 100,000 cars every day. It's also seen several crashes over recent years, especially involving tractor trailer roll overs.

"On those ramps, there are pretty tight turns, especially for tractor trailers. And if they aren't paying enough attention, they simply cannot navigate it and the trucks tip over," said Chris Redline, the Assistant District Engineer for MoDOT.

That was the case Wednesday morning when a tanker truck rolled over and spilled chicken fat in the interchange, causing a ramp closure for more than five hours.

In 2019, MoDOT will start replacing some of the bridges in the interchange to help make is safer. They will be building what is called a "Partial Turbine" configuration.

As part of the project, crews will make the two loop ramps less sharp and more rounded. The interchange will also get rid of the two left exits from I-435 to I-70 and instead feature flyovers around the interchange. This will help with congestion on I-435, especially during the evening commute.

The project is estimated at $40 million and is fully funded by MoDOT.

When the project starts next year, there will be ramp closures and even full closures of parts of I-70 as they tear down and rebuild the bridges.

EDIT: The I-70 Second Tier Combined Final Environmental Impact Statement has been submitted.  They do not have funding for construction except for the I-70/I-435 interchange and the recently completed Manchester Trafficway bridges.

http://www.modot.org/kansascity/metroi70/
QuoteThe I-70 Second Tier Combined Final Environmental Impact Statement and Record of Decision document has been submitted for publication in the Federal Register on Jan. 19, 2018.

MoDOT and FHWA combined the Final Environmental Impact Statement (FEIS) and Record of Decision (ROD) in accordance with provisions on environmental documentation in the Moving Ahead for Progress in the 21st Century Act (MAP-21) and the Fixing America's Surface Transportation (FAST) Act.  MoDOT and FHWA have addressed all agency and public comments from the DEIS in the combined FEIS/ROD.

The combining of the FEIS and ROD means that there will be no comment period on the FEIS.  However, MoDOT and FHWA previously invited comments based on information provided in an EIS update packet provided to DEIS commenters and made available on this website.

With the signing of the combined FEIS/ROD, FHWA approves MoDOT Preferred Alternative as the Selected Alternative for I-70 between the Paseo Boulevard and Blue Ridge Cutoff in Kansas City, Missouri.

The final study document is now available on this website, as well. 

MoDOT thanks all the community members, organizations and agencies who participated in the study and helped us develop the preferred environmental alternative.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#28
February 16, 2018 Letting: Bid Results. Bid Award Winners.

Notable Projects:
Job J2P3104 Route 15 SHELBY County. Resurface from Rte. 168 at Shelbyville to just north of Rte. 36 at Shelbina, the total length of improvement being 6.909 miles.
Job J2S3125 Route 161 MONTGOMERY County. Bridge replacement over I-70 near Mineola, the total length of improvement being 0.44 miles. Job J3I3128 Route I-70 LAFAYETTE County. Sign installation westbound in Odessa, the total length of improvement being 0.918 miles.
Job J4I3198 Route I-70 JACKSON County. Bridge rehabilitation and ADA improvements on 8th Street, 9th Street, 10th Street and Chestnut Ave, the total length of improvement being 0.437 miles.
Job J4I3199 Route I-70 JACKSON County. Bridge replacements at Pittman, Crysler and Phelps Road, the total length of improvement being 0.272 miles.
Job J4M0260 Route 70OR JACKSON County. Culvert replacement southeast of Blue Ridge Cutoff interchange, the total length of improvement being 0.008 miles.
Job J4P3144 Route 169 CLAY County. Coldmilling and resurfacing from I-29 to Barry Road, the total length of improvement being 3.99 miles.
Job J4S3204 Route 33 CLAY County. Intersection improvements at 162nd Street in Kearney, the total length of improvement being 0.026 miles.
Job J4S3301 Route 150, BB JACKSON County. Drainage improvements at I-70 between Raytown Road and Horridge Road, the total length of improvement being 0.198 miles.
Job J9I2167 Route I-44 LACLEDE, PHELPS, PULASKI County. Coldmill, resurfacing and bridge rehabilitations from Phelps County to Laclede County across entire Pulaski County, the total length of improvement being 50.1 miles.
Job J6I3159 Route I-55 JEFFERSON County. Crack seal and guardrail from Route M to Route Z in Barnhart, the total length of improvement being 4.317 miles.
Job J6S3231 Route 185 FRANKLIN County. Signal improvements and ADA improvements at East Springfield Road in Sullivan, the total length of improvement being 0.095 miles.
Job J6S3244 Route I-44 FRANKLIN County. Coldmill and resurface from north of Route W in Stanton to end of State Maintenance near Oak Grove Village, including on Route W from I-44 to Brandi King Lane, the total length of improvement being 2.989 miles.
Job J6S3353 Route 141, 340, 180 ST LOUIS County. Pavement Marking in St. Louis County, the total length of improvement being 38.55 miles.
Job J7I3074 Route I-44 LAWRENCE County. Concrete pavement replacement Lawrence County E.B. log mile 33.030 to log mile 37.480, the total length of improvement being 4.45 miles.
Job J7P0881 Route 60 BARRY County. Intersection improvements at Route 37 in Monett., the total length of improvement being 0.366 miles.
Job J7S3207 Route 86 NEWTON County. ADA improvements at various locations from e/o Loop 49 to e/o Rte. HH, the total length of improvement being 1.581 miles.
Job J9P3293 Route 160 HOWELL County. Resurface and add shoulders from Route 101 to just west of Route JJ, the total length of improvement being 13.269 miles.
Job J9P3295 Route 160 OZARK, TANEY County. Resurface from Route 125 South to Route 5 South, the total length of improvement being 24.306 miles.
Job J9S3341 Route 77 MISSISSIPPI, SCOTT County. Resurfacing, and add shoulders from Route 61 to in Benton to 0.8 mile west of Route 105 in Charleston, the total length of improvement being 19.406 miles.

The following three sets of projects was let as one project (for each set):

(1): Job J2P3083 Route 79 PIKE County. Bridge replacement over Ramsey Creek 2.4 miles north of Route H near Annada, the total length of improvement being 0.103 miles.
(2): Job J2P3084 Route 79 PIKE County. Bridge replacement over Fox Creek 1.9 miles south of Route W near Clarksville, the total length of improvement being 0.046 miles.

(1): Job J6I3146 Route I-270 ST LOUIS County. Bridge rehabilitation from 1.9 mile north of Rte. 364 to 1.5 mile south of I-70 in Maryland Heights, the total length of improvement being 0.49 miles.
(2): Job J6S3261 Route I-270 ST LOUIS County. Bridge painting at McKelvey Road over I-270, the total length of improvement being 0.5 miles.

(1): Job J9P3265 Route 25 DUNKLIN, NEW MADRID County. Resurface north to just south of Co Rd 218, the total length of improvement being 5.021 miles.
(2): Job J9S3266 Route 25 DUNKLIN, NEW MADRID County. Resurface to Route 25/Route 62, the total length of improvement being 2.971 miles.
Counties: Counties visited
Travel Mapping: Summary

US71

Quote from: mvak36 on January 12, 2018, 03:31:34 PM
February 16, 2018 Letting:

Notable Projects:

Job J7P0881 Route 60 BARRY County. Intersection improvements at Route 37 in Monett., the total length of improvement being 0.366 miles.


Any word on what is planned (more lanes? roundabout)? Seems like every few years, MoDOT redoes this intersection.
Like Alice I Try To Believe Three Impossible Things Before Breakfast

J N Winkler

It looks like they are lengthening the eastbound right-turn lane and possibly also updating the signals.  Plans (about 4 MB) are available at this link:

http://www.modot.org/eBidLettingPublicWeb/viewFileStream.do?documentType=plan&key=5681
"It is necessary to spend a hundred lire now to save a thousand lire later."--Piero Puricelli, explaining the need for a first-class road system to Benito Mussolini

kphoger

Quote from: US71 on January 12, 2018, 03:36:53 PM
Quote from: mvak36 on January 12, 2018, 03:31:34 PM
February 16, 2018 Letting:

Notable Projects:

Job J7P0881 Route 60 BARRY County. Intersection improvements at Route 37 in Monett., the total length of improvement being 0.366 miles.


Any word on what is planned (more lanes? roundabout)? Seems like every few years, MoDOT redoes this intersection.

Quote from: J N Winkler on January 12, 2018, 03:42:40 PM
It looks like they are lengthening the eastbound right-turn lane and possibly also updating the signals.  Plans (about 4 MB) are available at this link:

http://www.modot.org/eBidLettingPublicWeb/viewFileStream.do?documentType=plan&key=5681

Regarding the signal upgrade...

Quote from: Memorandum–Missouri Department of Trnansportation, SW District
Route 60
Barry County
Intersection Improvement Project at Route 60 and37
Job No. J7P0881
Proprietary Item Certification/Public Interest Finding

With reference to the above-mentioned project, we are requesting approval to use the following
proprietary items.
- Uninterruptable Power Supply: Alpha FXM 1100 system. The system is comprised of the following items:
1 each - Alpha Outdoor Enclosure S6, w/ Generator Option, UATS, UGTS, BCK, AG (Alpha026-053-33)
1 each — FXM 1100, 120Vac Input and Output, 48Vdc Battery Bus, SNMP Kit, AC and DC Breakers with Auxiliary Switch and Ethernet capability (Alpha-017-230-23)
4 each — Battery, AlphaCell Gel 195GXL, 12V, 100Ah @ 20 hrs., Top Terminal (Alpha-181-230-10)

This item is necessary to provide continuous power supply to the traffic signals being installed at this location. We are requesting approval to specify this item in this contract to be consistent with the other installations in the Springfield area. The Southwest District has made this product the standard product for all Springfield area inventories and future usage. It has a proven product support from multiple signal supply vendors (technical support as well as price competition). Our maintenance inventory and repair processes and staff training have been oriented around the usage of this project.

Keep right except to pass.  Yes.  You.
Visit scenic Orleans County, NY!
Male pronouns, please.

Quote from: Philip K. DickIf you can control the meaning of words, you can control the people who must use them.

mvak36

Construction won't start on this project till 2019, but check out this interchange configuration they are proposing for the I-35/MO152 interchange in Liberty.



What is this type of interchange called? I don't think I have ever seen anything like this before.
Counties: Counties visited
Travel Mapping: Summary

US71

Quote from: mvak36 on January 19, 2018, 04:31:17 PM


What is this type of interchange called? I don't think I have ever seen anything like this before.

Ausgeforked ;)
Like Alice I Try To Believe Three Impossible Things Before Breakfast

kphoger

Quote from: mvak36 on January 19, 2018, 04:31:17 PM
Construction won't start on this project till 2019, but check out this interchange configuration ...
What is this type of interchange called? I don't think I have ever seen anything like this before.

DD½  ???
Keep right except to pass.  Yes.  You.
Visit scenic Orleans County, NY!
Male pronouns, please.

Quote from: Philip K. DickIf you can control the meaning of words, you can control the people who must use them.

intelati49


mvak36

Counties: Counties visited
Travel Mapping: Summary

mvak36

#37
March 16, 2018 Letting: Bid Results. Bid Award Winners.


Notable Projects:
Job J1S0579 Route 13 DAVIESS County. Bridge replacement over Honey Creek, 0.5 miles north of Route HH near Gallatin, the total length of improvement being 0.103 miles.
Job J1S3125 Route 116 CLINTON County. Culvert replacement over McGuire Creek 1.7 miles west of Route 169 near Gower, the total length of improvement being 0.02 miles.
Job J2P3059D Route 94 MONTGOMERY County. Bridge rehabilitation over Loutre River 0.1 mile west of Rte. 19 near McKittrick, the total length of improvement being 0.095 miles.
Job J3I3010 Route I-70 LAFAYETTE County. Grading, paving and bridge over Route E and Route H, the total length of improvement being 0.49 miles.
Job J3P3086 Route 65 PETTIS County. Coldmill and Resurface from Saline County Line to Route 765 north of Sedalia, the total length of improvement being 13.945 miles.
Job J5M0277 Route OR 44 PULASKI County. Culvert replacement 0.1 mile west of outer road and Route 7 intersection, the total length of improvement being 0.243 miles.
Job J6I2418 Route I-70 ST CHARLES County. Grading, paving and bridge from West of Route K to T.R. Hughes Blvd, the total length of improvement being 1.61 miles.
Job J6I3166 Route 70/270 ST LOUIS County. Concrete pavement repair at the 70/270 access ramps including Route 180 interconnecting ramps, the total length of improvement being 1.044 miles.
Job J6M0265 Route BL 44 FRANKLIN County. Culvert Repair on Route I-44 BL (Osage St) west of Intergram Drive in Pacific, the total length of improvement being 0.059 miles.
Job J6P0876R Route 21 JEFFERSON County. Grading and drainage between Old Route 21 and Klable Road, the total length of improvement being 0.776 miles.
Job J6S3220 Route 231 ST LOUIS County. Signal improvements and ADA improvements from Hoffmeister Ave to Jeffersonian Road, the total length of improvement being 0.237 miles.
Job J6S3238 Route 67 ST LOUIS County. Signal improvements at Quailways Dr, Ladue Rd, Chaminade Dr, the total length of improvement being 0 miles.
Job J6I3111 Route I-64 ST LOUIS CITY County. Coldmill and resurface from Sarah Street to Vandeventer Street, the total length of improvement being 1.714 miles.
Job J6S3160 Route 30 JEFFERSON County. Microsurfacing from St. Louis county line to west of Route PP near High Ridge, the total length of improvement being 5.272 miles.
Job J7M0261 Route 59 MCDONALD County. Drainage improvements 0.07 mile north of Route 76 in the city of Anderson, the total length of improvement being 0.056 miles.
Job J0S3018J Route 14 VARIOUS County. ADA improvements in Houston and West Plains, the total length of improvement being 0.749 miles.

The following five sets of projects was let as one project (for each set):

(1): Job J1P3067 Route 136 PUTNAM County. Bridge replacement at West Locust Creek, 6 miles east of Lucerne, the total length of improvement being 0.213 miles.
(2): Job J2P2186 Route 136 PUTNAM County. Bridge replacement at Elm Branch, 3 miles east of Lucerne, the total length of improvement being 0.154 miles.

(1): Job J2P3059B Route 151 SHELBY County. Bridge replacement 1.1 miles east of Route B near Leonard, the total length of improvement being 0.239 miles.
(2): Job J2S3123 Route 151 SHELBY County. Bridge replacement 1.1 miles north of Route MM near Clarence, the total length of improvement being 0.267 miles.

(1): Job J6S3249 Route AC ST LOUIS County. Coldmill and resurface from Lindbergh Blvd to the end of state maintenance, the total length of improvement being 5.667 miles.
(2): Job J6S3250 Route 67 ST LOUIS County. Coldmill and resurface at Route AC intersection, the total length of improvement being 0.064 miles.

(1): Job J8P2293 Route 65 GREENE County. Bridge replacement from 0.2 miles north of Interstate 44 to 0.14 miles south of Interstate 44 in Springfield, the total length of improvement being 0.364 miles.
(2): Job J8P3079C Route 65 GREENE County. Guardrail replacement from Valley Water Mill Road to Kearney Street, the total length of improvement being 1.138 miles.
(3): Job J8P3080B Route 65 GREENE County. Pavement improvements from Valley Water Mill Road to Kearney Street, the total length of improvement being 1.138 miles.
(4): Job J8S3061 Route LP44, Bus 65 GREENE County. Resurface and ADA improvements disconnected sections of Glenstone Ave. from I-44 to Lombard St. in Springfield, the total length of improvement being 0.473 miles.

(1): Job J9S3253 Route 80 MISSISSIPPI, NEW MADRID County. Coldmill, resurface and add shoulder from Route 61 to Route 102, the total length of improvement being 12.561 miles.
(2): Job J9S3254 Route 80 MISSISSIPPI County. Resurface at Route 77 to .2 miles east of County Road 501, the total length of improvement being 2.4 miles. 
Counties: Counties visited
Travel Mapping: Summary

US71

#38

I got about half of those last night, but I guess it was only a partial list:


    Cedar County Route U: Bridge replacement over Adler Creek near Willowville
        Awarded to Boone Construction Co. of Columbia, for low bid amount of $620,000
    Greene County U.S. Route 65: Pavement rehabilitation on northbound Route 65 to westbound I-44 ramp
        Awarded to Branco Enterprises, Inc. of Springfield for low bid amount of $416,000
    Henry County Route V: Bridge replacement over Tebo Creek south of Calhoun
        Awarded to Boone Construction Co. of Columbia, for low bid amount of $770,000
    Jasper County I-49: Two bridge rehabilitations over the Spring River near Carthage
        Awarded to Capital Paving and Construction, LLC of Jefferson City, for low bid amount of $4.5 million
    Jasper County Missouri Route 66: Sidewalk improvements between Range Line Road and Duquesne Road in Joplin
        Awarded to Emery Sapp & Sons, Inc. of Springfield, for low bid amount of $762,000
    Jasper/Lawrence counties I-44: Resurfacing between 2.5 miles west of the Jasper/Lawrence county line to the Lawrence/Greene county line
        Awarded to Capital Paving and Construction, LLC of Jefferson City for low bid amount of $14.2 million
    Newton County I-44: Two bridge rehabilitations over Shoal Creek in Joplin
        Awarded to Capital Paving and Construction, LLC of Jefferson City for low bid amount of $3.2 million
    Stone County Route V: Bridge replacement over Goff Creek
        Awarded to Hartman & Co. of Springfield for low bid amount of $509,000
    Taney County U.S. Route 160 & Missouri Route 76: Intersection improvements in Forsyth
        Awarded to Lehman Construction, LLC of California for low  bid amount of $845,000
Like Alice I Try To Believe Three Impossible Things Before Breakfast

mvak36

#39
Quote from: US71 on February 09, 2018, 10:12:44 AM

I got about half of those last night, but I guess it was only a partial list:


    Cedar County Route U: Bridge replacement over Adler Creek near Willowville
        Awarded to Boone Construction Co. of Columbia, for low bid amount of $620,000
    Greene County U.S. Route 65: Pavement rehabilitation on northbound Route 65 to westbound I-44 ramp
        Awarded to Branco Enterprises, Inc. of Springfield for low bid amount of $416,000
    Henry County Route V: Bridge replacement over Tebo Creek south of Calhoun
        Awarded to Boone Construction Co. of Columbia, for low bid amount of $770,000
    Jasper County I-49: Two bridge rehabilitations over the Spring River near Carthage
        Awarded to Capital Paving and Construction, LLC of Jefferson City, for low bid amount of $4.5 million
    Jasper County Missouri Route 66: Sidewalk improvements between Range Line Road and Duquesne Road in Joplin
        Awarded to Emery Sapp & Sons, Inc. of Springfield, for low bid amount of $762,000
    Jasper/Lawrence counties I-44: Resurfacing between 2.5 miles west of the Jasper/Lawrence county line to the Lawrence/Greene county line
        Awarded to Capital Paving and Construction, LLC of Jefferson City for low bid amount of $14.2 million
    Newton County I-44: Two bridge rehabilitations over Shoal Creek in Joplin
        Awarded to Capital Paving and Construction, LLC of Jefferson City for low bid amount of $3.2 million
    Stone County Route V: Bridge replacement over Goff Creek
        Awarded to Hartman & Co. of Springfield for low bid amount of $509,000
    Taney County U.S. Route 160 & Missouri Route 76: Intersection improvements in Forsyth
        Awarded to Lehman Construction, LLC of California for low  bid amount of $845,000

I apologize. I haven't updated the January bids and the Bid award summary. I will update the post later.
https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7160
https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7200
Counties: Counties visited
Travel Mapping: Summary

mvak36

#40
http://www.kctv5.com/story/37610649/modot-to-permanently-close-ramp-from-nb-i-435-to-rt-210

They're demolishing the flyover from 435 NB to 210 WB. This will enable them to finally get rid of the lane drop near that intersection and make it three continuous lanes through there.

The I-435/Rte 210 project is supposed to be completed by the end of this year.

Next year they will start the I-70/I-435 interchange project (tentative letting this August). That will get rid of the left exits at that interchange and most of the 435 beltway in KS and MO won't have any left exits (with the exception of the MO-350 exit off of 435 SB and the 435EB to 71NB ramp). It should be at least three lanes everywhere except between exits 22 and 49. The concurrency with I-29 is also at least 3 lanes.

I think I got everything but I probably missed something. Feel free to correct me if you guys see any wrong info.

EDIT: 435 is only two lanes through the Grandview Triangle interchange.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#41
April 20, 2018 Letting: Bid Results. Bid Award Winners.

Notable Projects:

Job J1L1800B Route MO 139 PUTNAM, SULLIVAN County. Resurface from Iowa State Line to Rte. 6 in Sullivan County, the total length of improvement being 32.793 miles.
Job J2P3169 Route C, 24 RALLS, RANDOLPH County. Bridge rehabilitation on Rte. 24 over Rte. 36 near Monroe City and Rte. C over Rte. 24 near Huntsville, the total length of improvement being 0.206 miles.
Job J2S3170 Route F, Wildcat Drive WARREN County. Bridge rehabilitation Route F over I-70 and Wildcat Drive over I-70, the total length of improvement being 0 miles.
Job J5S3162 Route I-44 Outer Rd LACLEDE County. Grading, drainage, paving and bridge from 0.9 miles south of Hazelgreen over the Gasconade River, the total length of improvement being 0.64 miles.
Job J6I3248 Route I-270, MO 370 ST LOUIS County. Bridge rehabilitation at the I-270/MO 370 interchange, the total length of improvement being 0.151 miles.
Job J6P3211 Route 364 ST CHARLES County. Pavement Improvements from 0.7 mile west of Mid Rivers Mall Drive to 0.5 mile east of Central School Road, the total length of improvement being 1.496 miles.
Job J6S3208 Route I-44 Outer Rd ST LOUIS County. Grading on Votaw Levee along I-44 outer road in Eureka, the total length of improvement being 0.222 miles.
Job J6S3262 Route 94 ST CHARLES County. Seal Coat from Route H/J to Route 67, the total length of improvement being 9.603 miles.
Job J8I3109 Route I-44 GREENE County. Bridge rehabilitation crossing over Kearney Street in the southwest Springfield, the total length of improvement being 0.091 miles.
Job J8P3132 Route 60, 65 GREENE County. Guardrail improvements at the ramp interchanges in Greene County, the total length of improvement being 0.893 miles.
Job J9I3307 Route I-55 SCOTT County. Bridge deck replacement over I-57/US 60, the total length of improvement being 0.46 miles.
Job J9P3104 Route 51 PERRY County. Bridge rehabilitation over Mississippi River at Chester, the total length of improvement being 0.535 miles.
Job J9P3128 Route 21 IRON County. Bridge replacement over Carver Creek, the total length of improvement being 0.157 miles.
Job J9P3246 Route 67 MADISON County. Slope repair in various locations on Route 67, the total length of improvement being 51.73 miles.   
Counties: Counties visited
Travel Mapping: Summary

mvak36

I found links to the INFRA grants that MODOT applied for: http://www.modot.org/plansandprojects/documents/TheMerchantsBridgeRehabilitationProgram110217Final.pdf and http://www.modot.org/plansandprojects/documents/MissouriDOT-INFRA-Grant-2017-10-30-v3.pdf

The second link is more interesting because if they get the grant, there could be a lot of important projects that they could do, including widening I-70 from Wentzville to Warrenton, the I-270 North Project, and the I-70 Missouri River bridge.


Counties: Counties visited
Travel Mapping: Summary

mvak36

Counties: Counties visited
Travel Mapping: Summary

mvak36

#44
May 18, 2018 Letting: Bid Results. Bid Award Winners.

Notable Projects:

Job J2M0275 Route 19 MONTGOMERY County. Pavement repair on north and south ends of bridge over Norfolk Southern Railroad 0.2 mile north of Route WW near New Florence, the total length of improvement being 0.644 miles.
Job J3P3107 Route 10 RAY County. Resurface from Clay county line to Route C, the total length of improvement being 10.894 miles.
Job J4I3169 Route I-35 CLAY County. Fence replacement along outer roads of I-35 (Church Rd, Steward Rd, and Palmer Rd), the total length of improvement being 2.718 miles.
Job J4I3300 Route I-29 PLATTE County. Median fence installation from n/o Barry Road to n/o 56th Street, the total length of improvement being 3.649 miles.
Job J4P3206 Route 50 JACKSON County. Intersection improvements at Buckner Tarsney Road, the total length of improvement being 0.3 miles.
Job J4S3243 Route 24 JACKSON County. Slope repair 0.9 miles east of I-435, the total length of improvement being 0.125 miles.
Job J5P3200 Route OR50 COLE County. Pavement improvements includes ramps to Route 50 and Truman Blvd interchange, portions of Missouri Blvd, Truman Blvd and Big Horn Drive in Jefferson City, the total length of improvement being 2.184 miles.
Job J6I3189 Route I-44 FRANKLIN County. Resurface and guardrail upgrades from Route 30 to Crawford County Line, the total length of improvement being 15.289 miles.
Job J6I3268 Route I-44, I-70 ST LOUIS CITY County. Pedestrian bridge replacement west of Kingshighway and west of Madison, the total length of improvement being 0.17 miles.
Job J6S3228 Route D ST LOUIS CITY County. Signal replacement and ADA improvements in various locations on Page Boulevard from Clara Avenue to Grand Avenue, the total length of improvement being 3.21 miles.
Job J6S3235 Route 30 ST LOUIS CITY County. Signal and ADA improvements from River Des Peres to Spring, the total length of improvement being 3.325 miles.
Job J6S3358 Route 367 ST LOUIS CITY County. Resurface and ADA improvements at Halls Ferry Circle, the total length of improvement being 0.943 miles.
Job J6S3360 Route OR 64 ST LOUIS County. Resurface from Chesterfield Parkway to I-270, the total length of improvement being 10.79 miles.
ob J6S3361 Route 100, D ST LOUIS CITY County. Signal and ADA improvements in 7 locations on MO 100 and 8 locations on Route D, the total length of improvement being 0 miles.
Job J7I3342 Route I-44 GREENE County. Bridge replacement 2.3 miles east of Route P, over Pickerel Creek, the total length of improvement being 0.53 miles.
Job J9P3064 Route 67 WAYNE County. Bridge replacement one miles south of Route EE, the total length of improvement being 0.099 miles.

The following four sets of projects were let as one project (for each set):
(1): Job J6P3144 Route 67 JEFFERSON County. Paving, grading and drainage at Montauk Road north of Olympian Village, the total length of improvement being 0.146 miles.
(2): Job J6P3145 Route 67 JEFFERSON County. Paving, grading and drainage at Victoria Road north of Olympian Village, the total length of improvement being 0.371 miles.

(1): Job J9P3197 Route 60 SHANNON County. Resurface eastbound lane from Route 19 to Winona, the total length of improvement being 2.601 miles.
(2): Job J9P3198 Route 60 SHANNON County. Resurface eastbound lane from County Road 583 to Route P, the total length of improvement being 5.032 miles.

(1): Job J9P3288 Route 5 WRIGHT County. Shoulder improvements from Route Z to Route 60, the total length of improvement being 10.274 miles.
(2): Job J9P3425 Route 5 WRIGHT County. Shoulder improvements from Route H/M to Route Z, the total length of improvement being 13.314 miles.

(1): Job J9S3203 Route V CAPE GIRARDEAU County. Bridge deck replacement over Little Indian Creek, the total length of improvement being 0.142 miles.
(2): Job J9S3216 Route KK CAPE GIRARDEAU County. Bridge deck replacement over Little Apple Creek, the total length of improvement being 0.134 miles.
(3): Job J9S3292 Route KK CAPE GIRARDEAU County. Resurface from Route B to Route 61, the total length of improvement being 8.632 miles.
 

Counties: Counties visited
Travel Mapping: Summary

mvak36

http://www.kansascity.com/opinion/editorials/article209505129.html

They might be considering a gas tax increase in the legislature this week. If they pass a 10 cent gas tax increase (I'm not holding my breath), it could go to a public vote depending on how the increase is implemented. If it's all at once, then it would go to a public vote. If it's phased in over something like 5 years then it might not need to go to one. I'm not sure what the threshold is that triggers a public vote.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#46
June 22, 2018 Letting: Bid Results. Bid Award Winners.

Notable Projects:

Job J1P3103 Route 169 CLINTON County. Bridge replacement over Castile Creek, 1 mile south of Gower, the total length of improvement being 0.195 miles.
Job J5P3185 Route 54 COLE, MILLER County. 9 Bridge rehabilitations 0.3 miles west of Route V in Miller County to Route 17 in Cole County, the total length of improvement being 0.704 miles.
Job J6I3170 Route I-64 ST LOUIS CITY County. Bridge rehabilitation from 18th street to Broadway, the total length of improvement being 0.901 miles.
Job J6M3409 Route I-55 ST LOUIS CITY County. Inlet top replacements from Weber Road to Broadway and Broadway to 1300' east of Broadway, the total length of improvement being 3.408 miles.
Job J9P3428 Route 19 SHANNON County. Resurfacing and shoulders from Riverview Drive to north of Route 60, the total length of improvement being 12.074 miles.
Job J9P3505 Route 67 ST FRANCOIS County. Intersection improvement 1.0 miles south of Route 221 in Farmington, the total length of improvement being 0.852 miles.
Counties: Counties visited
Travel Mapping: Summary

mvak36

http://www.kansascity.com/news/politics-government/article211433409.html

Gas tax increase will go to the voters this November. If they vote to increase it, gas taxes will go up 2.5 cents per gallon every year for the next four years.
Counties: Counties visited
Travel Mapping: Summary

edwaleni

Quote from: mvak36 on May 19, 2018, 12:11:03 PM
http://www.kansascity.com/news/politics-government/article211433409.html

Gas tax increase will go to the voters this November. If they vote to increase it, gas taxes will go up 2.5 cents per gallon every year for the next four years.

I am not a tax nut but this is needed. I support a 5 cent fed gas tax as well. 8 cents on diesel. I would support 2 more cents for both to support Amtrak so they can have their own trust fund and stop the madness with them.

mvak36

#49
August 17, 2018 Letting: Bid Results. Bid Award Winners.

Notable Projects:

Job J1I3019 Route I-29 HOLT County. Resurface from Davis Creek Bridge to Route 59 Interchange Near Mile Marker 67, the total length of improvement being 16.541 miles.
Job J4S3283 Route 350 JACKSON County. Slide repair WB off ramp to 63rd Street, the total length of improvement being 0.112 miles.
Job J5M0283 Route I-44 Spur PULASKI County. Pipe repair at Eastlawn Avenue in St. Roberts, the total length of improvement being 0.02 miles.
Job J6P3355 Route 364 ST LOUIS County. Detention structure clean out at the Bennington Detention Basin, the total length of improvement being 0 miles.
Job J7P3142 Route 176, EE TANEY County. Coldmill and resurface from Route 160 W Junction to Route 160 E Junction and from 176 W Junction to 176E Junction, the total length of improvement being 6.155 miles.
Job J9P3509 Route 21 REYNOLDS County. Drainage structure replacement 0.1 mile north of Route 21/106 intersection in Ellington, the total length of improvement being 0.014 miles.
Job J9S3498 Route Bus 60 HOWELL County. Bridge replacement over Kings Creek, the total length of improvement being 0.061 miles.   

The following four sets of projects were let as one project (for each set):

(1): Job J1I3192 Route I-35 DAVIESS County. Strip seal gland replacement 3 miles south of Pattonsburg, the total length of improvement being 0.892 miles.
(2): Job J1P3147 Route Various CARROLL, DAVIESS, LINN, LIVINGSTON County. Bridge rehabilitation on various routes and counties in the NW District, the total length of improvement being 0.66 miles.

(1): Job J1P3175 Route 24, 65 CARROLL County. Bridge rehabilitation 1.9 miles north of the Missouri River near Carrollton, the total length of improvement being 0.135 miles.
(2): Job J1P3176 Route 24, 65 CARROLL County. Bridge rehabilitation over Wakenda Creek, 0.5 miles north of Route 10 near Carrollton, the total length of improvement being 0.222 miles.
(3): Job J1P3177 Route 24 CHARITON County. Bridge rehabilitation over Long Creek, 0.7 miles west of Route KK near Keytesville, the total length of improvement being 0.194 miles.
(4): Job J1P3178 Route 24 CHARITON County. Bridge rehabilitation over Chariton River, 0.3 miles west of Route KK near Keytesville, the total length of improvement being 0.184 miles.

(1): Job J1S3076 Route 371 BUCHANAN County. Resurface From Route 752 to Buchanan/Platte Co. Line, the total length of improvement being 13.026 miles.
(2): Job J1S3153 Route 111 HOLT County. Resurface and add shoulders from Route T in Forest City to Route 59 in Oregon, the total length of improvement being 2.493 miles.

(1): Job J4I1597C Route I-70, I-435 JACKSON County. Interchange improvements at the I-70 and I-435 interchange, the total length of improvement being 1.05 miles.
(2): Job J4I3124B Route I-70 JACKSON County. Coldmill and resurface from Manchester Trafficway to Blue Ridge Cutoff, the total length of improvement being 1.914 miles.
(3): Job J4I3126 Route I-435 JACKSON County. Coldmill and resurface from Route 78 to Raytown Road, the total length of improvement being 1.56 miles.   
Counties: Counties visited