I-35 Gainesville Construction

Started by rte66man, June 18, 2022, 06:02:31 PM

Previous topic - Next topic

rte66man

TxDOT is moving along on the (as you go south from OK) first construction segment from roughly US82 south past FM218. Photos were taken June 9.


Looking to the southwest just past FM51. You can see how much of the curve will be taken out.  According to TxDOT, all of the Trinity River bridges will be replaced.


Showing the SB frontage road and the SB main lanes.  Initially set to be 2x3x3x2, it is supposed to be easily converted to 2x4x4x2.




The SB frontage road bridge across the Trinity. I would guess they will use it as temporary SB main lanes while the remaining bridges are built.
When you come to a fork in the road... TAKE IT.

                                                               -Yogi Berra


rte66man

BIG BUMP

Clearing the RoW has begun from the south end of the Red River bridge to the railroad overpass. Almost all of the additional land was taken from the east side of the existing RoW. I hope to have updated photos soon.
When you come to a fork in the road... TAKE IT.

                                                               -Yogi Berra

thisdj78

Quote from: rte66man on April 20, 2023, 02:05:01 PM
BIG BUMP

Clearing the RoW has begun from the south end of the Red River bridge to the railroad overpass. Almost all of the additional land was taken from the east side of the existing RoW. I hope to have updated photos soon.

I must have missed the news, but are they building a new Red River bridge for I-35?

J N Winkler

#3
Quote from: thisdj78 on April 20, 2023, 03:28:46 PMI must have missed the news, but are they building a new Red River bridge for I-35?

There is a schematic, which Rte66man found and posted in another thread:

http://ftp.dot.state.tx.us/pub/txdot/get-involved/wfs/i35ea/062717-schematic.pdf

However, I haven't heard that a contract has been let.

Edit:  Fixed a misspelling of Rte66man's handle.
"It is necessary to spend a hundred lire now to save a thousand lire later."--Piero Puricelli, explaining the need for a first-class road system to Benito Mussolini

thisdj78

Quote from: J N Winkler on April 20, 2023, 04:17:45 PM
Quote from: thisdj78 on April 20, 2023, 03:28:46 PMI must have missed the news, but are they building a new Red River bridge for I-35?

There is a schematic, which Rteman66 found and posted in another thread:

http://ftp.dot.state.tx.us/pub/txdot/get-involved/wfs/i35ea/062717-schematic.pdf

However, I haven't heard that a contract has been let.

Interesting, looks like they are going to revive the US77 bridge to run along the new I-35 mainlanes bridge. That's smart because if there's a accident or something, you are stuck with no nearby alternative.

rte66man

Quote from: thisdj78 on April 20, 2023, 05:28:08 PM
Quote from: J N Winkler on April 20, 2023, 04:17:45 PM
Quote from: thisdj78 on April 20, 2023, 03:28:46 PMI must have missed the news, but are they building a new Red River bridge for I-35?

There is a schematic, which Rteman66 found and posted in another thread:

http://ftp.dot.state.tx.us/pub/txdot/get-involved/wfs/i35ea/062717-schematic.pdf

However, I haven't heard that a contract has been let.

Interesting, looks like they are going to revive the US77 bridge to run along the new I-35 mainlanes bridge. That's smart because if there's a accident or something, you are stuck with no nearby alternative.

That is correct and it was stated the reason for it was for an accident detour.
When you come to a fork in the road... TAKE IT.

                                                               -Yogi Berra

rte66man

Quote from: J N Winkler on April 20, 2023, 04:17:45 PM
Quote from: thisdj78 on April 20, 2023, 03:28:46 PMI must have missed the news, but are they building a new Red River bridge for I-35?

There is a schematic, which Rte66man found and posted in another thread:

http://ftp.dot.state.tx.us/pub/txdot/get-involved/wfs/i35ea/062717-schematic.pdf

However, I haven't heard that a contract has been let.

Edit:  Fixed a misspelling of Rte66man's handle.

The first time it appears in the 8-Year plan is 2027.
When you come to a fork in the road... TAKE IT.

                                                               -Yogi Berra

rte66man

https://oklahoma.gov/odot/citizen/major-projects/ongoing-projects/i-35-corridor-projects.html

Quote
Future projects featured in the Eight-Year Construction Work Plan https://oklahoma.gov/odot/programs-and-projects/8-year-construction-work-plan.html
I-35 from the Texas state line north 1 mile to mm 1, money only, TXDOT participation, FFY 2023, $34 million
I-35, SH-153 bridge over I-35 reconstruction and interchange 5.3 miles north of Texas state line, FFY 2027, $12 million
I-35 reconstruct to 6 lanes from mm 3.2 north to mm 4.7, FFY 2027, $7.5 million
I-35 reconstruct to 6 lanes from mm 5.7 to mm 7.7, FFY 2027, $8 million
I-35 reconstruct to 6 lanes from mm 8.3 to 11.3, FFY 2030, $15 million

No mention of the bridge yet it is listed inn the FFY2027 data...........
When you come to a fork in the road... TAKE IT.

                                                               -Yogi Berra