Regional Boards > Central States

MODOT Contract Lettings

<< < (35/37) > >>

SkyPesos:

--- Quote from: mvak36 on November 11, 2021, 11:55:40 AM ---(2): Job J6S3638 Route I-44 ST LOUIS CITY County. Grading and pavement to rebuild off ramp from I-44 express lane to Broadway, the total length of improvement being 0.314 miles.

--- End quote ---
When did I-44 started having an express lane in St Louis? I thought the only express lane in the metro area is on I-70, and a pretty useless one too.

J N Winkler:

--- Quote from: SkyPesos on November 11, 2021, 11:36:16 PM ---When did I-44 started having an express lane in St Louis? I thought the only express lane in the metro area is on I-70, and a pretty useless one too.
--- End quote ---

The express lane now overlaps partially with I-44, which was extended over former I-70 alignment to the west end of the Stan Span.

mvak36:
The winning bids for the November letting were awarded at the MHTC meeting on 12/1/21.

mvak36:
January 21, 2022 Letting:

Projects listed in blue font are part of Missouri Focus on Bridges program.

(1): Job J1P3379 Route 159 HOLT County. Pavement improvements from the Missouri River, near Rulo, NE, to Little Tarkio Creek, near Fortescue, the total length of improvement being 5.239 miles.
(2): Job J1P3432 Route 159 HOLT County. Pavement improvements from Route 111 n/o Forest City to Little Tarkio River, the total length of improvement being 4.268 miles.
(3): Job J1S3380 Route 111 HOLT County. Pavement improvements from 1 mile west of Route 118 to Route 118, the total length of improvement being 0.886 miles.

Job J1S3209C Route V CARROLL County. Bridge replacement with box culvert 2.6 miles south of Route 24 and Route V Intersection, the total length of improvement being 0.097 miles.
Job J2I3310 Route I-70 MONTGOMERY County. Resurface from Callaway County line to 2 miles east of Route F near High Hill, the total length of improvement being 32.43 miles.

(1): Job J2S3373 Route 107 MONROE County. Bridge deck seal coat over South Fork Salt River 0.6 mile south of Rte. U near Florida, the total length of improvement being 0.313 miles.
(2): Job J2S3374 Route 107 MONROE County. Bridge deck seal coat over North Fork Salt River 0.5 mile north of Rte. U near Florida, the total length of improvement being 0.381 miles.

Job J3I3227 Route 70 LAFAYETTE County. Shoulder improvements from Route 13 to Route Y, the total length of improvement being 13.14 miles.
Job J4I3484 Route I-35/I-29 CLAY County. Slope repair ramp from Southbound I-29 to Northbound I-35, the total length of improvement being 0.066 miles.
Job J5I3381 Route 44 PULASKI County. 2 Bridge rehabilitations over the Roubidoux Creek and over Trophy Lane near St Robert, the total length of improvement being 0.204 miles.
Job J5I3400 Route I70 COOPER County. Bridge rehabilitation bridge over Chouteau Creek, the total length of improvement being 0.106 miles.
Job J5I3595 Route I-70 BOONE, CALLAWAY County. Culvert repair 0.8mi. W/o Rte. Z, 0.9 mi. E/o St. Charles Rd., and 1.1 mi. W/o Rte. E, including Rte. B 0.4 mi. E/o Brown Station Rd., and Rte. 54 0.4 mi. S/o Rte. TT, the total length of improvement being 0.007 miles.

(1): Job J5S3283 Route 100 OSAGE County. Bridge deck replacement over Deer Creek 4 miles west of Chamois, the total length of improvement being 0.056 miles.
(2): Job J5S3348 Route 100 OSAGE County. Bridge replacement over Cedar Creek 0.1 Miles south of Route C in Luystown, the total length of improvement being 0.096 miles.

Job J5S3473B Route 63 MARIES County. Resurfacing and pavement repair .1 miles east of CR 541 to 0.1 miles east of CR 519, the total length of improvement being 6.609 miles.

(1): Job J6I3505 Route I-44 FRANKLIN County. Pavement Repair for 4 Ramps on I-44 Interchange at Route 47 pavement repair for 4 ramps on I-44 Interchange at Route 47, the total length of improvement being 0.436 miles.
(2): Job J6P3291 Route 30/47 FRANKLIN County. Bridge redecks over I-44, the total length of improvement being 0.235 miles.
(3): Job J6S3298 Route HH FRANKLIN County. Bridge replacement Route HH over Calvey Creek, the total length of improvement being 0.151 miles.

Job J6I3622 Route I-170 ST LOUIS County. Pavement repair I-170 from I-270 to I-64, the total length of improvement being 10.4 miles.

(1): Job J6M3413 Route I-70 ST LOUIS CITY County. Bridge rehabilitation over Grand Blvd., the total length of improvement being 0.036 miles.
(2): Job J6M3414 Route I-70 ST LOUIS CITY County. Bridge rehabilitation at Taylor Ave., the total length of improvement being 0.011 miles.

Job J6P3605 Route Various FRANKLIN County. Fixed Price Variable Scope Seal coat on MO 100 from Gasconade County Line to Route KK; on Route H North of Sapsucker Road to Mo 185; on Route YY from MO 185 to Route A, the total length of improvement being 28.061 miles.

(1): Job J6S3293 Route BB JEFFERSON County. Pavement improvements from Route 30 in Cedar Hill to Elm Street in Hillsboro, the total length of improvement being 10.5 miles.
(2): Job J6S3628 Route F JEFFERSON County. Pavement improvements from Route O to St. Joseph Hills Road, the total length of improvement being 3.982 miles.

Job J6S3404 Route Lackland, Midland ST LOUIS County. Bridge redeck on Lackland Road & MIdland Blvd over I-170, the total length of improvement being 0.165 miles.
Job J6S3606 Route Various FRANKLIN County. Fixed Price Variable Scope Seal coat on Route AE in Franklin County; on Route B from Mo100 to Lower Bottom Road in Franklin County, the total length of improvement being 8.256 miles.

(1): Job J7I3460 Route Various VARIOUS County. JOC for bridge repairs JOC for bridge repairs at various location in rural Southwest District, the total length of improvement being 0 miles.
(2): Job J8P3233 Route Various VARIOUS County. Job Order Contracting for bridge repairs Job Order Contracting for bridge repairs at various location in the urban Southwest District, the total length of improvement being 0 miles.

(1): Job J7I3498 Route Various VARIOUS County. Concrete Repairs at various locations in the rural Southwest District., the total length of improvement being 12.853 miles.
(2): Job J8P3241 Route Various VARIOUS County. Concrete Pavement Repairs at various locations in the urban Southwest District, the total length of improvement being 4.168 miles.

(1): Job J7P3502 Route Various VARIOUS County. Seal coat on various routes in various counties in Southwest District, the total length of improvement being 101.642 miles.
(2): Job J8P3229 Route Various VARIOUS County. SEAL COAT on various routes in Christian and Green Counties, the total length of improvement being 8.274 miles.

Job J7P3107I Route Route K BARTON County. Bridge Redeck from 0.3 miles south of Route V to 0.66 miles north of NW 70th RD northwest of Liberal, the total length of improvement being 0.1 miles.
Job J7P3502B Route Various VARIOUS County. Seal coat on routes in Barton, Bates, Cedar, Dallas, Henry, Hickory and Polk Counties, the total length of improvement being 86.112 miles.
Job J7S3285 Route LP49 JASPER County. Bridge Replacement bridge replacement and add sidewalk on Range Line Road over Kansas City Southern Railroad, the total length of improvement being 0.327 miles.
Job J7M0267 Route UU BENTON County. Seal coat from Route 7 to end of state maintenance, the total length of improvement being 2.533 miles.
Job J9I3643 Route I-55 SCOTT County. Bridge deck replacement over Route 62, the total length of improvement being 0.133 miles.
Job J9P3380 Route MO 34 WAYNE County. Bridge deck replacement over St. Francis River, the total length of improvement being 0.367 miles.
Job J9S3742 Route 181 TEXAS County. Intersection Improvements using Governor backfill money from Cherry Street to Rte. 60 in Cabool, the total length of improvement being 0.629 miles.

EDIT: Additional lettings added
Job J4I2006 Route CLAY County. I35 & 19th Street Interchange add a new interchange and local street improvements, the total length of improvement being 0.995 miles. Project website: https://www.modot.org/i-35-and-19th-street-interchange
Job J6P3646 Route Various ST LOUIS County. Fixed Price Variable Scope Bridge Crack Fill crack fill at various bridges, the total length of improvement being 0.454 miles.

(1): Job J6S3296 Route 61/67 JEFFERSON County. Grading and pavement from Meramec River Bridge to Collier Drive, the total length of improvement being 2.499 miles.
(2): Job J6S3433 Route 61/67 JEFFERSON County. Grading and pavement from Route 231 to Richardson Road, the total length of improvement being 0.307 miles.

Was previously let in November but wasn't approved due to high bids.
(1): Job J5I3397 Route I-44 PHELPS County. Resurfacing from Sugartree Road interchange to east of Route F interchange, the total length of improvement being 28.094 miles.
(2): Job J5I3482 Route I-44 PHELPS County. 2 Bridge rehabilitations and culvert extension over Bourbouse River Branch and over East Fork Little Beaver Creek, the total length of improvement being 0.043 miles.
(3): Job J5I3572 Route I-44 PHELPS County. Reconstruction of pavement on east bound lanes of I-44 from Rolla to St. James, the total length of improvement being 8.2 miles.

SkyPesos:

--- Quote from: mvak36 on December 10, 2021, 08:40:10 PM ---Job J6I3622 Route I-170 ST LOUIS County. Pavement repair I-170 from I-270 to I-64, the total length of improvement being 10.4 miles.

--- End quote ---
About time...  :clap:

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version