Regional Boards > Central States

MODOT Contract Lettings

<< < (37/39) > >>

mvak36:

--- Quote from: MikieTimT on January 14, 2022, 09:27:39 AM ---Looks like they're fixing pavement on significant chunks of I-49.  It's about time.  Surface is pretty advanced in age on a good portion from long before it was promoted to an interstate.

--- End quote ---

Yes. They're doing repairs along 111 miles of I-49 if I calculated it right. It seems like it will be spot repairs if I understood it correctly.

mvak36:
The winning bids for the January letting were awarded at the MHTC meeting on 02/01/22.

US71:

--- Quote from: MikieTimT on January 14, 2022, 09:27:39 AM ---Looks like they're fixing pavement on significant chunks of I-49.  It's about time.  Surface is pretty advanced in age on a good portion from long before it was promoted to an interstate.

--- End quote ---

They replaced a bridge last year on I-49 that was a leftover from 71. North Fork Spring River, I believe.

mvak36:
March 18, 2022 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J1P3302 Route 24 CARROLL County. Resurface on Route 24 from Route 65 to 1.5 miles east of Route 41 near DeWitt, the total length of improvement being 14.691 miles.

(1): Job J1S3207 Route E CARROLL County. Bridge replacement bridge replacement over Turkey Creek 0.8 mile east of Rte. D near Norborne, the total length of improvement being 0.131 miles.
(2): Job J1S3208 Route E CARROLL County. Bridge replacement bridge replacement over Lost Creek 0.9 mile east of Rte. OO near Carrollton, the total length of improvement being 0.041 miles.

Job J1S3458 Route Z CARROLL County. Slide repair 0.1 mile south of Rte. C, the total length of improvement being 0.056 miles.
Job JNWM0004 Route Various VARIOUS County. Resurface at various locations in the Northwest District, the total length of improvement being 61.773 miles.
Job J2P3156 Route 54 AUDRAIN County. Grading, paving, and drainage to construct roundabout at Rte. 19 junction north of Laddonia, the total length of improvement being 0.341 miles.
Job J2S3454 Route U MONROE County. Grading, paving, and culvert replacement from 0.3 to 0.9 miles west of Rte. 107 near Florida, the total length of improvement being 0.363 miles.
Job J2S3450 Route B SCOTLAND County. Bridge replacement over north fork of North Fabius River 0.1 mile west of Rte. JJ, the total length of improvement being 0.095 miles.
Job J2S3403 Route F WARREN County. Bridge painting Route F over I-70 and Wildcat Drive over I-70, the total length of improvement being 0.09 miles.
Job J3P3181 Route 65 SALINE County. Grading and pavement from I-70 to 110th Street, the total length of improvement being 0.382 miles.
Job J6P3560 Route 50 FRANKLIN County. Resurface from Route C to Route BB, the total length of improvement being 11.43 miles.
Job J6P3334 Route Various VARIOUS County. Job order contract for concrete pavement repair in St Louis City, St Louis , St Charles , Franklin , and Jefferson Counties, the total length of improvement being 0 miles.
Job J6P3455 Route Various VARIOUS County. Job order contract for asphalt pavement repair in St Louis City, St Louis, St Charles, Franklin, and Jefferson Counties, the total length of improvement being 0 miles.

(1): Job J7S3367D Route 160 GREENE County. ADA improvements on Route 160 from Chandler Avenue to Routes F and V and on Route V from north of College Street to Route 160 in Ash Grove, the total length of improvement being 0.313 miles.
(2): Job J8S3179 Route Norton Road GREENE County. ADA improvements on Norton Road near Rte. 13 in Springfield and on Rte. Z at the Frisco Highline Trail north of Jackson Street in Willard, the total length of improvement being 0.337 miles.

Job J7P3105E Route MO 249 JASPER County. 3 Bridge deck sealing at the Rte. 171 interchange, the total length of improvement being 0.421 miles.
Job J7S3171 Route 96 JASPER County. Bridge replacement over White Oak Creek, the total length of improvement being 0.174 miles.
Job J9I3858 Route I-55 PEMISCOT County. Pavement improvements at Route 164 and weigh station near Steele, the total length of improvement being 0.5 miles.
Job J9S3859 Route N STODDARD County. Resurface from Route 91 to Route 60, the total length of improvement being 14.339 miles.
Job J9S3396 Route WW STODDARD County. Bridge rehabilitation over Drainage Ditch 26, Approx. 2.9 miles South of Route J, the total length of improvement being 0.06 miles.
Job J9P3633 Route Various VARIOUS County. Job Order Contract for asphalt pavement repair on all major highways except interstates, the total length of improvement being 0 miles.
Job J9P3636 Route Various VARIOUS County. Job Order Contract for concrete pavement repair on all major highways except interstates, the total length of improvement being 0 miles.

EDIT: Additional Lettings Added
Job J3P3078 Route 50 PETTIS County. Intersection improvement at the intersection of Route 127 near La Monte, the total length of improvement being 0.99 miles. Construction of J-Turn at intersection.
Job J5S3448 Route M and Z COOPER County. Bridge rehabilitation 0.19 miles North of Route OO and 0.27 miles South of Route AE, the total length of improvement being 0.078 miles.

(1): Job J6Q3468 Route Various VARIOUS County. ITS maintenance Dynamic Message Sign replacement at various locations in the St Louis District, the total length of improvement being 0 miles.
(2): Job J6Q3474 Route Various VARIOUS County. ITS maintenance CCTV camera replacements at various locations in the St Louis District, the total length of improvement being 0 miles.


mvak36:
The winning bids for the February letting were awarded at the MHTC meeting on 03/01/22.

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version