mvak36:
April 21, 2017 Letting: Bid Results. Bid Award Winners

Notable Projects:
Job J1S2192 Route DD BUCHANAN County. Bridge replacement, grading, and paving over I-29 near Faucett, the total length of improvement being 0.173 miles.
Job J0I3003J Route I-70 MONTGOMERY, WARREN County. JOC - asphalt pavement repair at various locations from Callaway County to St. Charles County, the total length of improvement being 0 miles.
Job J2P3058C Route 63 RANDOLPH County. Bridge rehabilitation 2.6 miles north of Route B near Clark, the total length of improvement being 1.08 miles.
Job J2P3164 Route 61 MARION County. High friction surface treatment on the Route 24/61 Interchange near Taylor, the total length of improvement being 0.62 miles.
Job J3P3057 Route 24 LAFAYETTE County. Intersection improvements at Route 131 south of Wellington, the total length of improvement being 0.289 miles.
Job J3P3069 Route 50, 65 PETTIS County. Signal interconnect in Sedalia, the total length of improvement being 2.45 miles.
Job J3P3077 Route 50 JOHNSON County. Intersection improvement and Grading and pavement for J-Turns at the intersection of Route 131, the total length of improvement being 1.078 miles.
Job J3S3079 Route Various VARIOUS County. Install chevron signs at curves in various rural counties, the total length of improvement being 0 miles.
Job J4P3227 Route Various VARIOUS County. JOC - Concrete Pavement Repair at various locations throughout the rural Kansas City District, the total length of improvement being 0 miles.
Job J0I3003I Route 70 VARIOUS County. JOC - asphalt pavement repair in Central District, the total length of improvement being 0 miles.
Job J0I3003Q Route 44 VARIOUS County. JOC - asphalt pavement repair in Central District, the total length of improvement being 0 miles.
Job J5L3075C Route 63 CALLAWAY County. Bridge deck replacement over Katy Trail 3 miles north of Route 54, the total length of improvement being 1.536 miles.
Job J5P3104 Route 32 DENT County. Bridge replacement over Dry Valley Creek on Route 32 near Salem, the total length of improvement being 0.183 miles.   
Job J5P3119 Route 54 CALLAWAY County. Bridge rehabilitation, guardrail upgrades, and guard cable from Kingdom City to Jefferson City, the total length of improvement being 28.807 miles.
Job J5P0933 Route 7 BENTON County. Bridge rehabilitation over the Osage River west of Route 65 in Warsaw, the total length of improvement being 0.216 miles.
Job J7S3000 Route 60 LAWRENCE County. Bridge replacement east of Route 37 in Monett, the total length of improvement being 0.313 miles.
Job J8I3055 Route 44 GREENE County. Grading, paving, lighting and signing. from Route 160 to Route H in Springfield, the total length of improvement being 1.466 miles.
Job J8P2226 Route 76 TANEY County. Grading, pavement, and bridge replacement over Bull Shoals Lake, the total length of improvement being 0.521 miles.
Job J9I3127 Route I-55 SCOTT County. Bridge rehabilitation at I-57 interchange, the total length of improvement being 0.49 miles.   

The following three sets of projects were let as one project (for each set):
(1): Job J1S3092 Route 6 BUCHANAN County. Pavement, coldmill and resurface from I-29 to Route AC, the total length of improvement being 1.551 miles.
(2): Job J1S3096 Route 6 BUCHANAN County. ADA improvements from Woodbine Road to Route AC in St. Joseph, the total length of improvement being 1.6714 miles.

(1): Job J4S3207 Route 152 PLATTE County. Guard cable from I-435 to Congress Ave near Kansas City, the total length of improvement being 4.083 miles.
(2): Job J4S3208 Route 9 CLAY, PLATTE County. Guard cable from I-635 to US 169, the total length of improvement being 1.593 miles.

(1): Job J7S3087 Route 76 TANEY County. Bridge replacement over Kentucky Hollow Creek, the total length of improvement being 0.139 miles.
(2): Job J7S3087B Route 76 TANEY County. Bridge replacement east of Route W in Brownbranch, the total length of improvement being 0.167 miles.
(3): Job J7S3087C Route 76 TANEY County. Bridge replacement west of Route W in Brownbranch, the total length of improvement being 0.067 miles 

mvak36:
Don't want to start a new thread for this, so posting this here.

I-70 Second Tier Study
I was browsing through the project sites MODOT Kansas City Major Projects page when I came across an update on the I-70 Second Tier Study page.

It looks like they will have a Record of Decision for that I-70 segment (from downtown to 435) in April.

--- Quote ---MoDOT and FHWA propose to combine the Final Environmental Impact Statement (FEIS) and Record of Decision (ROD) in accordance with provisions on environmental documentation in the Moving Ahead for Progress in the 21st Century Act (MAP-21) and the Fixing America's Surface Transportation (FAST) Act, selecting the Preferred Alternative
--- End quote ---

--- Quote ---MoDOT and FHWA will address all agency and public comments from the DEIS in the combined FEIS/ROD. A copy of the DEIS comments and MoDOT/FHWA’s responses are included with this letter.  The combining of the FEIS and ROD means that there will be no comment period on the FEIS.   However, MoDOT and FHWA invite comments now based on information provided in this packet.  MoDOT anticipates completing the combined FEIS/ROD by April 2017. MoDOT and FHWA request that you provide any comments or concerns on the enclosed information and the decision to complete a combined FEIS and ROD within a 30-day comment period (ending on March 16, 2017). This will be the last opportunity for you to provide comments that would be considered by MoDOT and FHWA as part of the environmental review process.
--- End quote ---

But what caught my eye towards the bottom of the webpage was this:
--- Quote ---Rebuilding the I-435 and I-70 interchange to remove left-hand exits is currently in design.
--- End quote ---

So I emailed MODOT asking about when they will do the construction.

--- Quote ---We plan to start construction in Fall of 2018, with the traffic impacts (ramp and lane closures) to begin in Spring 2019.  The project will be complete in Fall 2020.
--- End quote ---
I didn't ask them what type of interchange they're going to build, but going off of their Preferred Alternative (page 4 of pdf), it looks like it will be a partial turbine interchange. The left-hand exits (which I hate, btw) will be replaced with semi-directional ramps.

I-435 South Loop Link
Another interesting thing I noticed was a new webpage for the I-435 South Loop Link. I'm not sure what all will be happening on this segment of I-435 (from State Line to the Grandview Triangle), but going through the study documents, they recommend removing and replace the Wornall and Holmes Rd bridges, among many other changes. I asked about when they will start the project, but I didn't ask for any specific information about what changes they will make.

--- Quote ---Yes, that section will be under construction in 2018 & 2019.  The website you mentioned is the best source of information regarding that project.
--- End quote ---
This project is also listed in the 2017-2021 STIP (Job No. 4I2337):
--- Quote ---Bridge and corridor improvements from the Kansas State line to just west of I-49. Project involves twin bridges A1240, A1662, A1427, and A0610. Potential Design/Build project.
--- End quote ---

My commute the next couple of years is going to suck, with the 435 pavement reconstruction on the KS side and this project coming up :ded:.

mvak36:
May 19, 2017 Letting: Bid Results. Bid Award Winners

Notable Projects:
Job J1P3023C Route I-29 HOLT County. Bridge rehabilitation at Davis Creek and abandoned railroad, near Mound City, the total length of improvement being 0.241 miles.
Job J1P3179 Route 36 BUCHANAN, DEKALB County. High Friction Surface Treatment from 10th street bridge to Route 36 and I-229 Interchange and 1.5 miles east of Route 31 near Stewartsville in DeKalb Co, the total length of improvement being 0.327 miles.
Job J2P3058B Route 61 LINCOLN County. Bridge rehabilitation over Big Creek south of Route U near Moscow Mills, the total length of improvement being 0.392 miles.
Job J2S3159 Route F MONTGOMERY County. slide repair, lighting, and signing at I-70 interchange at High Hill, the total length of improvement being 1.223 miles.
Job J0I3003H Route 70 LAFAYETTE, SALINE County. JOC - asphalt pavement repair in Lafayette and Saline Counties, the total length of improvement being 0 miles.
Job J3P3030 Route 65 PETTIS County. Bridge deck replacement over Muddy Creek, the total length of improvement being 0.46 miles.
Job J3P3085B Route Z LAFAYETTE County. Grading, paving, drainage, pavement marking and signing at Route TT intersection near Bates City, the total length of improvement being 0.211 miles.
Job J4I3168 Route 470 JACKSON County. Bridge rehabilitation from Blue Ridge Blvd. to I-70, the total length of improvement being 14.929 miles.
Job J4P3228 Route Various VARIOUS County. Pavement markings at various roundabouts and intersections in urban Kansas City, the total length of improvement being 0 miles.
Job J4P3231 Route Various VARIOUS County. High friction resurfacing at various locations in the urban Kansas City District, the total length of improvement being 0.999 miles.
Job J0I3003Z Route 70 COOPER County. JOC - concrete pavement repair in various locations in Central District, the total length of improvement being 0 miles.
Job J5P3190 Route 17 PULASKI County. Slide repair north of I-44, the total length of improvement being 0.046 miles.
Job J6I3169 Route I-44 ST LOUIS County. Resurfacing, guardrail replacement and striping from Murdoch Avenue to Route 141, the total length of improvement being 8.8 miles.
Job J6I3224 Route 64 ST LOUIS, ST LOUIS CITY County. Bridge rehabilitation various bridges in St. Louis County and St. Louis City, the total length of improvement being 6.811 miles.
Job J6M0264 Route 185 Spur FRANKLIN County. Seal coat and Full Depth Reclamation in Franklin County, the total length of improvement being 2.21 miles.
Job J6P3164 Route 141 ST LOUIS County. Guard cable installation median from Casino Center Drive to River Valley Drive, the total length of improvement being 2.099 miles.
Job J6P3179 Route 61 ST CHARLES County. Signal replacements at Pitman Avenue in Wentzville, the total length of improvement being 0.152 miles.
Job J6S3174 Route Old Highway 21 JEFFERSON County. Signal Installation and ITS at Konert Road, the total length of improvement being 0.104 miles.
Job J8P3036 Route 65 GREENE County. Grading, drainage, paving and bridges and Route YY interchange in Springfield, the total length of improvement being 0.778 miles.
Job J8P3056 Route 413, 60 GREENE County. Grading, drainage, paving, signing and pavement marking from Route 175 in Republic to west of Route 160 in Springfield, the total length of improvement being 5.61 miles.
Job J8P3094 Route 60 GREENE County. Guardrail improvements south of I-44 to US65 in Springfield, the total length of improvement being 27.429 miles.
Job J8P3102 Route 360,60 GREENE County. Grading, drainage and paving at various locations in Springfield, the total length of improvement being 2.347 miles.
Job J0I3003S Route 55, 57 VARIOUS County. JOC - concrete repair in various locations in various counties, the total length of improvement being 0 miles.
Job J0I3003T Route 55, 57 VARIOUS County. JOC- asphalt repair in various locations in various counties, the total length of improvement being 0 miles.
Job J0I3003U Route 55, 155 NEW MADRID, PEMISCOT County. JOC - concrete repair in Southeast District, the total length of improvement being 0 miles.
Job J9P3303 Route 34, M BUTLER, REYNOLDS County. Sand seal pavement improvements from Route 21 to the Wayne County line and from Route 67 to paved shoulders west of interchange, the total length of improvement being 10.174 miles.   

The following three sets of projects were let as one project (for each set):
(1): Job J7P2228H Route 96 LAWRENCE County. Bridge replacement over Dry Fork Creek in Lawrence County, the total length of improvement being 0.144 miles.
(2): Job J7P2228I Route 96 LAWRENCE County. Bridge replacement over Stahl Creek in Lawrence County, the total length of improvement being 0.15 miles.
(3): Job J7S0526 Route 97 LAWRENCE County. Bridge replacement over Center Creek in Lawrence County, the total length of improvement being 0.152 miles.

(1): Job J7P3098 Route 76 STONE County. High Friction Surface Treatment near Deerfoot Trail in Stone County east of Cape Fair, the total length of improvement being 0.228 miles.
(2): Job J7P3161 Route 160 TANEY County. High Friction Surface Treatment from west of Silver Creek Road to Star Street north of Forsyth, the total length of improvement being 0.56 miles.
(3): Job J8P2386 Route 76 TANEY County. High Friction Surface Treatment near Lakeshore Drive east of Branson, the total length of improvement being 0.113 miles.

(1): Job J9S3069 Route K STODDARD County. Bridge replacement over Castor River near Puxico, the total length of improvement being 0.118 miles.
(2): Job J9S3135 Route 61 CAPE GIRARDEAU County. Bridge Replacement over Poor Creek near Pocahontas, the total length of improvement being 0.09 miles.
(3): Job J9S3139 Route C MISSISSIPPI County. Bridge replacement over Maple Slough near Dogwood, the total length of improvement being 0.072 miles.
(4): Job J9S3142 Route 102 MISSISSIPPI County. Bridge replacement over Lateral Ditch #2 near Whiting, the total length of improvement being 0.05 miles.       

intelati49:
(Instead of the whole list, I would pick and choose out the new lanes/Widenings/Bridgework/Signs and ignore the HFST and repaving projects. Kind of a overload RN and I think that's crushing the discussion here)

I was looking through Central states board for this topic exactly though

mvak36:
June 16, 2017 Letting: Bid Results. Bid Award Winners

Notable Projects:
Job J1P3101 Route 136 ATCHISON County. Bridge replacement over east fork Little Tarkio Creek, near Tarkio, the total length of improvement being 0.332 miles.
Job J2P2210 Route 36 LINN County. Shoulder Improvements 1.4 miles east of Route 11 to 4.3 miles east of Route 5 near Bucklin MO, the total length of improvement being 10.006 miles.
Job J6I3205 Route 70 ST LOUIS CITY County. Pavement to add turn lane and signals and ADA improvements at Broadway and Carrie Ave, the total length of improvement being 0.334 miles.
Job J6M0266 Route 340 ST LOUIS County. Cold milling and resurface shoulder from Clayton Road to Lea Oak Drive, the total length of improvement being 2.989 miles.
Job J8P3088E Route 125,44 GREENE County. Intersection improvements in Strafford, the total length of improvement being 0.296 miles.

The following set of projects was let as one project:
(1): Job J1P3102 Route 71 ANDREW, NODAWAY County. Resurface north of Route A (Nodaway Co.) to n/o Route 48 (Andrew Co.), the total length of improvement being 11.692 miles.
(2): Job J1P3182 Route 71 NODAWAY County. Resurfacing and intersection improvements at Main Street intersection in Maryville, the total length of improvement being 0.935 miles.