US 89:

--- Quote from: Plutonic Panda on October 17, 2021, 09:40:05 PM ---^^^ not happy about that is needs to be a stack.

--- End quote ---

At I-80 and 56th West?  :-D  That would be some serious overkill and a tremendous waste of money that would be far better spent elsewhere in the state. Not to mention the lack of ROW without ripping up warehouses and hotels and whatever else.

Especially since in the somewhat near future we'll see a northward Mountain View Corridor extension to I-80.

Plutonic Panda:
^^^ Iím not too familiar with SLC. Is this the same road that is to become the West Davis freeway?

triplemultiplex:
Different freeway.
West Davis is up by Ogden.
Mountain View is UT 85.

US 89:
Looks like UDOT is conducting an environmental study for improvements to Orem's 1600 North between I-15 and US 89, along some of the newest state highway mileage in Utah:



This is a good thing and is why UDOT took over the road in the first place - this road has a ton of traffic and needs some upgrades that Orem and Lindon couldn't afford to make.

https://www.udot.utah.gov/connect/2021/11/04/udot-to-hold-public-meetings-on-environmental-study-about-potential-improvements-to-1600-north-in-orem/

Kniwt:
KSL reports that a section of SR 73 in Eagle Mountain will be lowered from 65mph to 55mph:
https://www.ksl.com/article/50294478/udot-to-reduce-speed-limit-along-section-of-busy-eagle-mountain-highway


--- Quote ---After residents voiced concerns about safety and too many traffic accidents, the Utah Department of Transportation said it will be reducing the speed limit along a section of state Route 73.

... In response, UDOT said it is in the final steps of approving a speed limit reduction in the area from 65 mph to 55 mph. The change could be finalized in the next few months.

... Geoff Dupaix, UDOT's region three senior communications manager, said UDOT does have the intersection of S.R. 73 and Six-Mile Cutoff Road, and other intersections along the corridor, identified for future traffic signals.

--- End quote ---

And there's this at the end of the report:

--- Quote ---Eventually, S.R. 73 will be converted into a freeway/frontage road system, but Dupaix said that could still be a decade away.

--- End quote ---