As I predicted even before they inaugurated the work site, the delivery of the new Champlain Bridge, over the St. Lawrence River, between Montreal and Brossard, will be postponed to spring 2019.
Federal minister of Infrastructure, François-Philippe Champagne, announced that the bridge structure will be ready on time, but it will not be possible to put asphalt and to waterproof the road surface, due to winter's cold and humid weather. So the surface will be done on next spring, at the latest by the end of June of 2019.
The old Champlain Bridge will remain open, and maintained in condition until the opening of the new bridge.