Shockingly, I've uploaded some more new photos. Primarily these photos detail the extension of Highway 401 through Windsor, through the perspective of Hwy 3. By in large these photos were taken either in July or November 2015, though I have included a number of photos taken before construction to extend the 401 had commenced:

The start of Hwy 401

Hwy 3 briefly opens up with a wide median at the western-most Hwy 401 interchange. For a brief period, the eastbound and westbound lanes of the highway straddle Highway 401.

Ramp to Hwy 401 passing beneath Hwy 3.

View of the same ramp as above first passing through the Hearthwood Tunnel, before passing beneath the Hwy 3 tunnel.


Two views at the Huron Church Line intersection, looking east.


Two views looking easterly, just east of the Sandwich West Parkway intersection.

Hwy 3 in the vicinity of the Montgomery Street intersection.


Westerly view east of Howard Avenue.

And kind of a bonus, not in Windsor, this is Hwy 3 passing over the Grand River Bridge in Cayuga. Until this past year, an old 1920s vintage steel through truss bridge stood at this location. It was replaced with a new steel beam bridge. The new bridge was built off-alignment and will be slid into place using Teflon sliding pads. Construction was supposed to be completed in 2015, however litigation between a neighbouring first nation community, and the government halted construction for much of the 2015 construction season.
The entire gallery can be seen here:
http://www.asphaltplanet.ca/ON/hwy_3-9_images/Hwy3_images.htm