AARoads Forum

Please login or register.

Login with username, password and session length
Advanced search  

News:

The AARoads Wiki is live! Come check it out!

Author Topic: Federal Aid Secondary Route System  (Read 1253 times)

cahwyguy

  • *
  • Offline Offline

  • Posts: 807
  • California Highway Guy

  • Age: 64
  • Location: Northridge, CA
  • Last Login: March 18, 2024, 10:53:08 PM
    • California Highways
Federal Aid Secondary Route System
« on: February 03, 2018, 12:48:56 AM »

More from the Nov/Dec 66 CHPW: "Grade and pave to reconstruct and widen South Street (Federal Aid Secondary Route 737) from two to four lanes as an urban extension project between the San Gabriel River in Artesia and Carmenita Avenue in Dairy Valley, a distance of 3.3 miles. Estimated cost, $1,230,000, of which the State will pay 615,000, Dairy Valley, $499,000, and Artesia $116,000."

Does anyone know more about the Federal Aid Secondary Route system in California? How much does it overlap with post-1964 state routes?
« Last Edit: February 03, 2018, 01:41:22 AM by cahwyguy »
Logged
Daniel - California Highway Guy ● Highway Site: http://www.cahighways.org/ ●  Blog: http://blog.cahighways.org/ ● Podcast (CA Route by Route): http://caroutebyroute.org/ ● Follow California Highways on Facebook: https://www.facebook.com/cahighways

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.