DJStephens:

--- Quote from: sprjus4 on January 30, 2023, 01:54:12 PM ---
--- Quote from: Bobby5280 on January 30, 2023, 12:46:42 PM ---That's good news. Although, it would not surprise me if substantial parts of I-57 North of Walnut Ridge were made with a single concrete slab 5 lanes wide (plus outboard shoulders). A cable barrier would run down the middle of it. That's opposed to the normal configuration of two separate roadways and a big median in between.

--- End quote ---
The brochure linked above showed a typical section with a 60 foot grass median dividing the two roadways.

--- End quote ---

Good.  Going cheap, like the BVB, with a minimal median, would be a regressive outcome.  The BVB, however, used a narrow "urban" cross - section, due to cut requirements.   

sprjus4:
The Belle Vista Bypass was reasonable due to the mountainous terrain of the route.

abqtraveler:

--- Quote from: sprjus4 on March 01, 2023, 10:01:01 PM ---The Belle Vista Bypass was reasonable due to the mountainous terrain of the route.

--- End quote ---
"Mountainous." Compared to what we have out here in New Mexico, those are hills! :)

abqtraveler:
For the reconstruction/widening of Future I-57/US-67 through Jacksonville, it looks like they're currently doing pre-construction activities, with actual construction scheduled to start next month.

https://www.arkansasonline.com/news/2023/feb/27/us-67167-lanes-to-be-closed-overnight/?news-arkansas

MikieTimT:
And preliminary schedule indicates 2027 for completing that segment.  They'll likely be moving dirt on the segment between Walnut Ridge and Corning by then.