Here's a graphic I made showing the current progress on the 70/71 east split. The background photography is from April of this year, via Google Earth. The drawing on top represents current progress as I've observed, and future construction.
The white lines are the mainlines and ramps of the future configuration.
Bridges outlined in white (
- Grant Ave over I-70/71;
- 18th St over I-70; and
- the westbound exit to Mound St over
- Parsons Ave,
- I-71, and
- various ramps
) are complete, built anew for this interchange reconstruction.
The bridge outlined in magenta (
- Parsons Ave over the former path of I-70 EB
) has been removed.
The bridges outlined in cyan (
- I-70 over
- I-71 NB,
- Parsons Ave, and
- the I-71 SB to I-70 EB ramp; and
- the ramp from Fulton St to I-70 EB and I-71 NB over I-71 NB
) are currently under construction, with beams already set and decking in progress.
The bridges outlined in orange (
- I-70 [formerly WB, currently both directions] over
- I-71 [formerly both directions, now NB only],
- Parsons Ave, and
- the I-71 SB to I-70 EB ramp;
- Parsons Ave in its current alignment over
- the I-71 SB to I-70 EB ramp and
- the I-70 WB to I-71 NB ramp;
- I-71 NB over the I-71 SB to I-70 EB ramp [which I forgot to outline in the illustration]; and
- Main St over I-71
) are presently standing but will be removed.
The bridges outlined in yellow (
- the ramp from Fulton St to I-70 EB and I-71 NB over I-70 and I-71 SB;
- Parsons Ave in its new alignment over
- the I-71 SB to I-70 EB ramp and
- the I-70 WB to I-71 NB ramp;
- I-71 NB over
- the I-71 SB to I-70 EB ramp and
- the I-70 WB to I-71 NB to I-670 WB ramp;
- and Main St over I-71
) will be built in the future. Note that the Main St bridge over I-71 is marked as both "presently standing, will be removed" and "will be built in the future"; it is my understanding that the alignment of Main St may slightly change alignment, and the new bridge will probably have its supports in different places.
The next traffic shift will be of I-71 NB, to its new alignment under the new Fulton St ramp and I-70 bridges. This will happen next month, weather permitting; otherwise, it will be postponed until the spring.