Yesterday I drove from Salado (South of Temple) to Waco.
All work is complete south of Loop 363 in Temple.
In Temple, work is substantially complete and looks like it should be done within 6 months.
North of Temple to Bruceville-Eddy, work is nearly complete, with only final work like the median barrier and restriping to be done. However, there is still major work to be done at Bruceville-Eddy, probably 6-months of work.
North of Bruceville-Eddy to Waco, it is complete.
Completed sections have a nice roomy feel.
But the $304 million expansion in Waco is slated to begin in 2019.
http://www.dot.state.tx.us/insdtdot/orgchart/cmd/cserve/let/2019/mclennan.htm#001501243
Completed section just south of Lorena (south of Temple)

Exit to I-14

Work in progress nearing completion in Temple

Between Temple and Bruceville-Eddy, much of it is done but not yet striped for 3 lanes. This shows a typical configuration with wide separation between the main lanes and frontage roads, which are continuous.

This is at Bruceville-Eddy, the spot which will probably take the longest to finish, maybe 6 months.