I was inspired by route56's KDOT Letting thread so I am creating one for MODOT lettings. I will try to update them as my work schedule permits, but I will just post links to the PDF's of the Bid Results and the Bid Award Winners when they are awarded. I will also post some notable projects from each letting.
All the information I get is from this link. For past letting info, users will have to choose the letting date from the drop-down menu that they are looking for since the page always opens to an upcoming letting. The page also will have the proposals, plans, and cross sections (where applicable) for projects.
Previous Lettings (In the interest of time, I'm only putting a few projects from each letting ,if any):
June 24, 2016: Bid Results. Bid Award Winners
Notable Projects
Job J4I1980 and Job J4I3038B:I-435 and Route 210 Interchange Project. Resurfacing of 435 from 210 interchange to Parvin Road.
Job J4I3109 and Job J4I3116: I-35 and I-670, respectively. Coldmill and Resurfacing near downtown KC area.
Job J4U1108C: MO-45 widening between I-435 and Route K.
August 9, 2016: Bid Results. Bid Award Winners
Only one letting: Grand Ave bridge replacement over I-670.
August 26, 2016: Bid Results. Bid Award Winners
September 21, 2016: Bid Results. Bid Award Winners
Only one letting: Job J6Q2039F Route 67 St. Louis County. ITS system preservation, repair, and upgrades at the Lindbergh Tunnel.
September 23, 2016: Bid Results. Bid Award Winners
Notable Projects
Job J3I3042: I-70. Coldmill and resurface from Jackson County line to Johnson Drive in Odessa.
Job J4I3110: I-470. Resurface from Three Trails Crossing to Raytown Road.
Job J5I3001: I-70 in BOONE County. Coldmill and resurface from MO River to Lake of the Woods Interchange, the total length of improvement being 30.428 miles. (Note to self: Avoid I-70 this summer)
Job J8P2196: US 65 GREENE County. Grading, pavement and bridge 0.2 miles West of Rte. 65 and Chestnut Expressway Interchange.
October 21, 2016: Bid Results. Bid Award Winners
Notable Projects
Job J4I3111: I-29 CLAY County. Resurface from Route 35 split to Route 210
Job J4I3170: I-435 JACKSON County. Bridge removal at 83rd Street over I-435
Job J6I3112: I-70 ST LOUIS CITY County. Resurface from east of Union Avenue to Branch Street in St. Louis City, the total length of improvement being 5.343 miles.
Job J7I3072: I-49 MCDONALD County. Resurface and shoulder improvements from Route 59 near Goodman to 1.6 miles south of Route 76 in Anderson, the total length of improvement being 12.936 miles.
The following projects were combined and let as one project:
(1): Job J6I2377C I-64 ST LOUIS CITY County. Grading, pavement and bridge from Sixth Street to Illinois Route 3 Exit, the total length of improvement being 0.772 miles.
(2): Job J6I2377D I-64 ST LOUIS CITY County. Substructure Repair on the Poplar Street Bridge over the Mississippi River near St. Louis City, the total length of improvement being 0.772 miles.
(3): Job J6I3025 Route I-55 ST LOUIS CITY County. Bridge painting on the Poplar Street Bridge over the Mississippi River near St. Louis City, the total length of improvement being 0.418 miles.
(4): Job J6I3026 I-55 ST LOUIS CITY County. Resurface on the Poplar Street Bridge over the Mississippi River near St. Louis City, the total length of improvement being 0.58 miles.
The following projects were combined and let as one project:
(1): Job J7I3075 Route 44 LACLEDE, WEBSTER County. Coldmill and resurface from the Wbester County Line, east of Route 125 in Strafford to 2 miles east of Route Y in Conway, the total length of improvement being 33.82 miles.
(2): Job J7I3099 Route 44 WEBSTER County. High friction surface treatment on the curves at Route B near Northview, the total length of improvement being 1.333 miles.
(3): Job J8I3047 Route 44 GREENE County. Coldmill and resurface from just east of Route 125 in Strafford to the Webster County Line, the total length of improvement being 1.541 miles.
November 18, 2016: Bid Results. Bid Award Winners
Notable Projects
Job J4P2256: I-49 JACKSON County. Grading, paving, and bridge at 155th Street near Grandview, the total length of improvement being 0.297 miles. DDI at I-49 and 155th St interchange.
Job J3I3008: I-70 SALINE County. 2 Bridge deck replacements 1.2 miles west of Rte 127 at Sweet Springs over Davis Creek., the total length of improvement being 0.878 miles.
Job J6I3133: I-70 ST CHARLES County. Coldmill and resurface from Mid Rivers Mall Drive to 5th Street, the total length of improvement being 6.836 miles.
Job J6I3132: I-64 ST LOUIS County. Coldmill and resurface from Chesterfield Airport Road to Route 340, the total length of improvement being 6.059 miles.
Job J7I3049: I-44 LAWRENCE County. Bridge rehabilitation east bound Bridge A09771 over Spring River, the total length of improvement being 0.841 miles.
December 16, 2016: Bid Results. Bid Award Winners
Notable Projects
Job J4I3105: I-29 PLATTE County. Resurface from Todd Creek to US 69 near Vivion Road, the total length of improvement being 11.922 miles.
Job J4I3108: I-435 JACKSON County. Resurface from Route 24 to Route 78 in Kansas City, the total length of improvement being 1.64 miles.
Job J6S3183: I-70 ST CHARLES County. Resurface from Route 370 to Zumbehl Road, the total length of improvement being 2.404 miles.
Job J7P3167: Route Various VARIOUS County. Resurface on various routes in the Southwest District, the total length of improvement being 117.944 miles.
Job J8P3049B: US 60 GREENE County. Diamond grinding from Route 13 to Route 65 in Springfield, the total length of improvement being 7.815 miles.
The following four sets of projects were each let as one project (for each set).
(1): Job J4S3136 Route 152 CLAY County. Resurface and ADA improvements from Route 1 to I-35, the total length of improvement being 4.22 miles.
(2): Job J4S3147 Route 152 CLAY County. Resurface and ADA improvements from Route 169 to Route 1, the total length of improvement being 2.256 miles.
(3): Job J4S3149 Route 152 PLATTE County. Resurfacing from I-29 to Route 169, the total length of improvement being 4.09 miles.
(1): Job J5P3056 Route 50 COLE County. Intersection improvements from west of Moreau River near Jefferson City to Lisletown Road, the total length of improvement being 4.493 miles.
(2): Job J5P3127 Route 50 COLE County. Resurface from the Moreau River near Jefferson City to Osage County Line, the total length of improvement being 9.934 miles.
(1): Job J6I3110 Route 55 JEFFERSON County. Resurface from Route Z near Pevely to Ste. Genevieve County line, the total length of improvement being 16.086 miles.
(2): Job J6I3131 Route 55 JEFFERSON County. 21 Bridge rehabilitations from Route Z near Pevely to Plattin Creek south of Crystal City, the total length of improvement being 8.105 miles.
(1): Job J6I3113 Route 270 ST LOUIS County. Resurface from Route 44 to Route 55, the total length of improvement being 5.493 miles.
(2): Job J6I3157 Route 270 ST LOUIS County. Resurface from Route 364 to Route 44, the total length of improvement being 10.693 miles.
Upcoming Lettings:
January 20, 2017: Bid Results. Bid Award Winners.
Notable Projects
Job J4P2360: I-49 CASS County. Bridge rehabilitation over South Grand River north of Archie, the total length of improvement being 0.56 miles.
Job J4P3128: MO291 JACKSON County. Resurface and intersection improvements from I-470 to route 50, the total length of improvement being 3.36 miles.
Job J4S3134 Route 7 JACKSON County. Bridge rehabilitation over Route 24 in Jackson County, the total length of improvement being 0.1 miles.
Job J4S3135: Bridge rehabilitation over I-470 at Raytown Road, the total length of improvement being 0.08 miles.
Job J5P3164: US 50 GASCONADE County. Bridge rehabilitation at the Gasconade River near Mount Sterling, the total length of improvement being 0.14 miles.
Job J6M0261: MO141 ST LOUIS County. Bridge rehabilitation at the intersection with Route 70, the total length of improvement being 0.1 miles.
Job J6P3135: MO364 ST CHARLES County. Guardrail and guard cable from Route 64 to Mid Rivers Mall Drive, the total length of improvement being 8.355 miles.
February 17, 2017: Bid Results. Bid Award Winners.
Notable Projects
Job J4P2292: US 50 JACKSON County. Grading, pavement, signals, signing and ADA improvements at the intersection with Route 291, the total length of improvement being 0.379 miles. Project website. Another DDI/roundabout project like the I-49/155th St project. Radmacher Brothers Excavating Co., Inc had the winning bid for both DDI projects, the other being the I-49/155th St interchange.
Job J4S3133: MO350 JACKSON County. Bridge redeck and ADA improvements on Bannister Road over MO350 in Lee's Summit, the total length of improvement being 0.027 miles.
Job J4S3148 Route W JACKSON County. Full bridge deck replacement over Blue River Road, the total length of improvement being 0.463 miles.
Job J4P3002: MO291 CASS County. Grading, pavement, drainage and ADA from Waters Road to Royal Street in Harrisonville, the total length of improvement being 0.916 miles.
Job J6I3114: I-44 ST LOUIS County. Coldmill, resurface and guardrail from Route 141 to Route 109, the total length of improvement being 6.964 miles.
Job J6P3062: MO141 ST LOUIS County. Pavement improvements from Rider Trail South to Railroad south of Route 370, the total length of improvement being 2.132 miles.
Job J6P3158: MO100 FRANKLIN, ST LOUIS County. Pavement Improvements from MO 109 to Route OO, the total length of improvement being 7.52 miles.
Job J8P3007D: MO13, 160, 44LP GREENE County. ADA Improvements at Chestnut/West Bypass and Kansas Avenue/Grand Avenue, the total length of improvement being 0.2 miles.
Job J9P3156: US 63 OREGON County. Coldmill and resurface from south of Route F to north of Route 19 near Thayer, the total length of improvement being 6.424 miles.
Job J9P3300: US 60 EB/WB CARTER, HOWELL County. Add rumble strips various locations from Bus. 63 in Willow Springs to County Road 256 in Carter County., the total length of improvement being 44.562 miles.
The following two sets of projects were let as one project (for each set):
(1): Job J4I3026 Route 35 CLAY County. Grading, paving, and bridges at Route 69 in Liberty, the total length of improvement being 0.301 miles.
(2): Job J4I3036 Route 35 CLAY County. Coldmill, resurface, and guardrail from Fishing River to Pleasant Valley Road, the total length of improvement being 8.3 miles.
(1): Job J8P3048 Route 65 GREENE County. Concrete pavement from Route 744 to Business Route 65 in Springfield, the total length of improvement being 2.066 miles.
(2): Job J8P3079 Route 65 GREENE County. Guardrail from Route 744 to 0.3 mile north of Route D in Springfield, the total length of improvement being 3.496 miles.
(3): Job J8P3081 Route 65 GREENE County. Concrete pavement from Business Route 65 to south of Bennett Street in Springfield, the total length of improvement being 1.275 miles.
mvak36:
March 24, 2017 Letting: Bid Results. Bid Award Winners
Notable Projects: (lots of bridge projects in this letting)
Job J2S3072 Route 161 MONTGOMERY County. Bridge replacement over Cuivre River south of Route T near Middletown, the total length of improvement being 0.305 miles.
Job J3S3052 Route 131 LAFAYETTE County. Bridge deck replacement south of Wellington, the total length of improvement being 0.089 miles.
Job J4P1431 Route 58 JOHNSON County. Bridge replacement over Briar Creek south of Route 50, the total length of improvement being 0.101 miles.
Job J6I3136 Route 270 ST LOUIS, ST LOUIS CITY County. Resurface from I-170 to the Chain of Rocks Bridge, the total length of improvement being 8.016 miles.
Job J6I3197 Route Various ST CHARLES County. Bridge rehabilitation in St. Charles County, the total length of improvement being 0.502 miles.
Job J9P3302 Route 67 ST FRANCOIS, WAYNE County. Bridge rehabilitation on various locations along Route 67, the total length of improvement being 0 miles.
The following eight sets of projects were let as one project (for each set):
(1): Job J2P3082 Route 79 PIKE County. Bridge replacement north of Route D in Louisiana, the total length of improvement being 0.133 miles.
(2): Job J2P3086 Route 79 PIKE County. Bridge replacement south of Route D near Louisiana, the total length of improvement being 0.185 miles.
(1): Job J2P3118 Route 79 RALLS County. Bridge rehabilitation over Quarry Road south of Route T near Hannibal, the total length of improvement being 0.038 miles.
(2): Job J2P3119 Route 79 RALLS County. Bridge rehabilitation over Malaruni Creek south of Routes E near Hannibal, the total length of improvement being 0.044 miles.
(1): Job J2S3112 Route 156 LEWIS County. Bridge replacement west of Route D near Newark, the total length of improvement being 0.099 miles.
(2): Job J2S3113 Route 156 LEWIS County. Bridge replacement west of Route D near Newark, the total length of improvement being 0.129 miles.
(1): Job J3S3050 Route M PETTIS County. Bridge replacement over Flat Creek south of Sedalia, the total length of improvement being 0.155 miles.
(2): Job J3S3051 Route M PETTIS County. Bridge deck replacements over Breakfast Creek and Walnut Creek south of Sedalia, the total length of improvement being 0.12 miles.
(1): Job J7P2193I Route 37 JASPER County. ADA improvements from Loop 44 to Clarence Street in Sarcoxie, the total length of improvement being 0.256 miles.
(2): Job J7S3178 Route W BARRY County. ADA improvements from Route 86 to Route 37 in Wheaton, the total length of improvement being 0.445 miles.
(1): Job J5P3030 Route 68 PHELPS County. ADA and signal improvement west of I-44 in St. James, the total length of improvement being 0.29 miles.
(2): Job J5P3120 Route 68 PHELPS County. Microsurfacing west of I-44 to Route 8, the total length of improvement being 4.993 miles.
(1): Job J8P3007B Route 744 GREENE County. ADA improvements from west bypass to Route 13, the total length of improvement being 1.844 miles.
(2): Job J8P3007C Route 744 GREENE County. ADA improvements from west by-pass to Kansas Expressway, the total length of improvement being 1.877 miles.
(1): Job J9I3108 Route 55 PEMISCOT County. Bridge rehabilitation at various locations in the Southeast District, the total length of improvement being 0 miles.
(2): Job J9I3109 Route 55 PEMISCOT County. Bridge rehabilitation at various locations between Hayti and the state line, the total length of improvement being 0.201 miles.
(3): Job J9I3111 Route 55 NEW MADRID, PEMISCOT, SCOTT County. Resurfacing at various locations in Scott, New Madrid and Pemiscot Counties., the total length of improvement being 55.471 miles.
Removed from letting:
Job J9P3124 Route 49 WAYNE County. Bridge replacement bridge improvements over McKenzie creek., the total length of improvement being 0.049 miles.
Job J9P3132 Route 67 WAYNE County. Bridge replacement over Hubble Creek near Silva, the total length of improvement being 0.05 miles.
Job J9S3144 Route 158 BUTLER County. Bridge replacement west of Harviel, the total length of improvement being 0.119 miles.
Job J9S3151 Route CC BOLLINGER County. Bridge replacement south of county road 308/310 and north of US 51, the total length of improvement being 0.731 miles.
Scott5114:
--- Quote from: mvak36 on February 09, 2017, 05:10:25 PM ---(1): Job J8P3007B Route 744 GREENE County. ADA improvements from west bypass to Route 13, the total length of improvement being 1.844 miles.
(2): Job J8P3007C Route 744 GREENE County. ADA improvements from west by-pass to Kansas Expressway, the total length of improvement being 1.877 miles.
--- End quote ---
One wonders what is going on here, as Kansas Expressway is Route 13. (West Bypass is the street name of Route 160–I mean, US-160.)
mvak36:
--- Quote from: Scott5114 on February 10, 2017, 12:24:35 AM ---
--- Quote from: mvak36 on February 09, 2017, 05:10:25 PM ---(1): Job J8P3007B Route 744 GREENE County. ADA improvements from west bypass to Route 13, the total length of improvement being 1.844 miles.
(2): Job J8P3007C Route 744 GREENE County. ADA improvements from west by-pass to Kansas Expressway, the total length of improvement being 1.877 miles.
--- End quote ---
One wonders what is going on here, as Kansas Expressway is Route 13. (West Bypass is the street name of Route 160–I mean, US-160.)
--- End quote ---
I looked at the plans for this listing. J8P3007B is from Glenstone Ave to US65. J8P3007C is from US160 to MO13. Maybe it was a typo in the listing?
mvak36:
Not a letting, but for people going to St. Louis area this summer, here's a summary of the major road projects in the metro.
http://www.stltoday.com/news/local/metro/modot-lays-out-top-roadwork-projects-that-could-slow-drivers/article_66b6fe70-aa59-510b-9434-a453b2418b40.html