Regional Boards > Mid-Atlantic

Virginia

<< < (1407/1428) > >>

74/171FAN:

--- Quote from: WillWeaverRVA on March 27, 2019, 10:30:38 AM ---
--- Quote from: Mapmikey on March 12, 2019, 03:54:36 PM ---VA 357 decommissioning on the March 2019 CTB agenda...

http://www.ctb.virginia.gov/resources/2019/mar/agendas/ctb_action_meeting_march_2019.pdf

The Southside Training Facility was torn down and redeveloped by private interests.

--- End quote ---

Annnnnnd it's gone. VA 357 decommissioned.

--- End quote ---

Potentially related to this, I noticed yesterday that 2 lanes now continue on US 1 SB/US 460 BUS WB to the VA 226 intersection.  It is still only one lane EB.

1995hoo:
https://twitter.com/VaDOTNOVA/status/1730274858695623024

plain:
Pretty sure this project is meant to eliminate weaving on 395 SB, both here and at VA 110. Always a good thing.

1995hoo:

--- Quote from: plain on November 30, 2023, 03:58:35 PM ---Pretty sure this project is meant to eliminate weaving on 395 SB, both here and at VA 110. Always a good thing.

--- End quote ---

I believe part of it has to do with all the crashes that occur when people use the existing ramp and then try to slice all the way across to the left-side exit for Route 1. I must say I hate driving through that area in the mainline, and I really hate using the loop ramp coming from Reagan Airport to southbound I-395 to the point where I often just go through Old Town instead.

ElishaGOtis:
Did TransUrban start accepting regular SunPass (not PRO, which has already been accepted since 2021) for their express lanes? I'm aware PeachPass became compatible last summer, but this wording in the FAQ is news to me.

https://www.expresslanes.com/faqs#tabexpress-lanes-and-e-zpass (4th question down).

Currently, the SunPass website says only the PRO is accepted in VA.

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version