That cemetery seems to be why the whole project is built the way it is in the first place. All having to be built in a narrow passageway over the existing north-south freeway including a three level crossing at Browning Road.
Yep, that cemetery has a lot to do with both the current and future routing. NJDOT was able to purchase some land from the cemetery to help squeeze in the future roadways. A questionably historic house that was taken had been used as the cemeteries' offices. NJDOT also bought land directly behind two mausoleums that the cemetery had plans for 2 additional mausoleum in the future. NJDOT took some housing on the west side of the interchange as well that had some regional significance, in which NJDOT funded new housing on available land in the same area.
BTW, I have 2 grandparents that are buried in this cemetary also.
Another interesting area is the building at the corner Leaf and Harding Ave. I orginally assumed that they would be demolishing it but it now looks like the ramp will go over the building.
I'm trying to figure that one out myself. Took a ride in this area, and it appears that building is being used by the contractor for the project. Judging by the angles, it appears they can put the bridge piers over what remains of the building...barely! If I were to take a guess, after the contractor is finishing up the project and doesnt need the building anymore, the remainder of the building will be knocked down.