Regional Boards > Mountain West

Arizona

<< < (35/41) > >>

KeithE4Phx:

--- Quote from: kernals12 on March 23, 2023, 11:14:40 PM ---I don't know if this is one of those projects, but ADOT is starting work on a 5 mile segment of 93 north of Wickenburg, converting it to a 4 lane divided highway.
--- End quote ---

This is a part of 93 that would not eventually be a part of I-11.  But it will still be a big help as an access road from 11 to downtown Wickenburg once/if/when the interstate is finally build.

roadman65:
It looks like they’re going to build a direct free flowing ramp from Loop 303 NB to I-17 NB.
https://goo.gl/maps/GEoPbgtVfna6uS2BA

Sonic99:

--- Quote from: roadman65 on March 24, 2023, 12:46:19 PM ---It looks like they’re going to build a direct free flowing ramp from Loop 303 NB to I-17 NB.
https://goo.gl/maps/GEoPbgtVfna6uS2BA

--- End quote ---

That was done 10 years ago. No sign of converting that interchange into a free-flowing in at least the next 5 years (no mention in the current 5 Year Plan).

kwellada:

--- Quote from: kernals12 on March 23, 2023, 11:14:40 PM ---
I don't know if this is one of those projects, but ADOT is starting work on a 5 mile segment of 93 north of Wickenburg, converting it to a 4 lane divided highway.

--- End quote ---

I graduated high school from Wickenburg in the early 90s and drove that 5 mile segment every day. It was terrifying back then*. This feels like a project that really should have happened decades ago.

* Being a teenager driver in a large Chevy pickup truck, I probably was part of the reason why it was terrifying.

Plutonic Panda:
Anyone care to guess what an interstate quality bypass of Wickenburg will cost?

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version