Regional Boards > Southeast
New Interstate 885 in Durham
fillup420:
--- Quote from: tolbs17 on December 18, 2021, 04:00:02 PM ---I'm sure a fact would be if it weren't for the railroad bridge going over the highway, this project could have been completed in 2019.
--- End quote ---
The railroad bridge which still has not been touched in regards to removal. We are waiting, CSX...........
Roadsguy:
How long before one of us pulls a Richard Ankrom and just tears the bridge down themself in the middle of the night?
74/171FAN:
As a note, I drove on I-85 through the area yesterday and there was no signage (even new overheads being installed) indicating Future I-885.
fillup420:
--- Quote from: Roadsguy on December 19, 2021, 11:09:23 AM ---How long before one of us pulls a Richard Ankrom and just tears the bridge down themself in the middle of the night?
--- End quote ---
I had very similar thoughts while passing under it yesterday. Time to locate some dynamite....
LM117:
NCDOT is insisting that the connector will open this spring.
https://www.wral.com/spring-opening-planned-for-east-end-connector-linking-nc-147-and-us-70-in-durham/20085935/
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version