News:

Thanks to everyone for the feedback on what errors you encountered from the forum database changes made in Fall 2023. Let us know if you discover anymore.

Main Menu

I-30 Frontage Roads Texarkana / FM2148.

Started by bwana39, March 11, 2023, 10:06:22 PM

Previous topic - Next topic

bwana39

TxDOT is in steps widening IH-30 from Just east of the Arkansas state line to at least FM 2253.

There could be an eventual connection to a direct connector between I-49 and I-369.

Here is my complaint about the project. Right now, they are building the frontage roads between FM-989 (King's Highway) to FM-3419 (Red Lick Road).

The first complaint is from the underpass at FM-2148 to JUST east of FM-3419 will initially be 2-way with no access to FM-3419. There will be turnarounds at the west end of each, but seemingly no access to 3419. (admittedly the FM-3419 overpass project scheduled to be let in 2026 will EVENTUALLY fix this. )

The second is the signage. FM-2148 is seldom used to cross the interstate. 90% + of the traffic follows 2148 from the north then accesses Hampton Road (the existing north frontage road) to King's Highway and vise versa.  There are VMS units on 3419 (Southbound) announcing that 2148 is closed at I-30. There are three of them  on FM-989 announcing it. The two on FM-2148 are probably appropriate and placed correctly. There is one on Hampton Rd (Westbound) that is probably a little bit late. Beyond the VMS overkill.  Are the "road closed ahead" and "no through traffic" signs. I am sure all of this is correct by the sign manual, but is is comical in person.

Then there is the real vexing part of it. The FM-2148 crossing of I-30. FM-2148 has a 3/4 box crossing. (From the north) it takes a 90 degree left turn, runs adjacent / parallel  to the freeway for about a quarter of a mile goes under the freeway then follows the other side adjacent / parallel to the freeway to another 90 degree turn in what should have been a straight overpass. It probably was initially built this way for a rail spur / bypass that crossed the freeway ROW and stopped.  Part of this project appears to be tearing the rails out and using the second portal of the underpass for the frontage road  facility as well.  The 3/4 box will still exist.


https://www.txdot.gov/projects/projects-studies/atlanta/i30-frontage-road-fm3419-fm989.html

https://www.txdot.gov/about/newsroom/local/atlanta/fm2148-i30-intersection-closure.html

https://www.txdot.gov/projects/projects-studies/atlanta/i30-bridge-replacement-fm3419.html

https://www.txdot.gov/projects/projects-studies/atlanta/i30-corridor-bowie-county.html





Let's build what we need as economically as possible.


Stephane Dumas

Interesting point, they could have made some temporary connections to FM-3419 until the new overpass is ready.

bwana39

Quote from: Stephane Dumas on March 13, 2023, 08:49:44 AM
Interesting point, they could have made some temporary connections to FM-3419 until the new overpass is ready.

They could. They could also straighten out that mess where 2148 crosses I-30. Oh well.

Let's build what we need as economically as possible.



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.