kphoger:
By the way, thank you for posting the county name so prominently on these.  It makes it much easier to scan through them and see if any interest me.

mvak36:

--- Quote from: kphoger on August 23, 2021, 01:21:51 PM ---By the way, thank you for posting the county name so prominently on these.  It makes it much easier to scan through them and see if any interest me.

--- End quote ---

Sure no problem. That's how they have it on their Plans site. I just copy those over so I can't really take credit for that.

SkyPesos:

--- Quote from: mvak36 on August 21, 2021, 09:05:52 AM ---(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.

--- End quote ---
Iím guessing the bridge rehab for MO 94 and Muegge is the in planning DDI? If itís not, then whatever this bridge rehab is would be a waste imo.
Also interesting that theyíre going to resurface MO 94 between 364 and I-70 now when there are plans later this decade to turn that section into a freeway w/ frontage lanes.

mvak36:

--- Quote from: SkyPesos on August 24, 2021, 11:34:57 AM ---
--- Quote from: mvak36 on August 21, 2021, 09:05:52 AM ---(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.

--- End quote ---
Iím guessing the bridge rehab for MO 94 and Muegge is the in planning DDI? If itís not, then whatever this bridge rehab is would be a waste imo.
Also interesting that theyíre going to resurface MO 94 between 364 and I-70 now when there are plans later this decade to turn that section into a freeway w/ frontage lanes.

--- End quote ---

I haven't looked at the plans (not sure I would understand it even I did), but the link you posted shows the Contract Award as October 2021 which lines up with when this letting gets awarded.

mvak36:

--- Quote from: SkyPesos on August 24, 2021, 11:34:57 AM ---
--- Quote from: mvak36 on August 21, 2021, 09:05:52 AM ---(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.

--- End quote ---
Iím guessing the bridge rehab for MO 94 and Muegge is the in planning DDI? If itís not, then whatever this bridge rehab is would be a waste imo.
Also interesting that theyíre going to resurface MO 94 between 364 and I-70 now when there are plans later this decade to turn that section into a freeway w/ frontage lanes.

--- End quote ---

Is there enough room to make it a freeway? It looks fairly built up as it gets closer to I-70.