J N Winkler:

--- Quote from: mvak36 on October 08, 2021, 03:35:10 PM ---Please note that the links they provided don't open a pdf like before. It opens a pop up asking whether you want to open or download the file.
--- End quote ---

A couple of additional observations in this vein:

*  My MoDOT downloader has not worked since at least September 24 (the website address must have changed since the initial request lands on a redirect page that is not followed).  I plan to repair it in due course.

*  My script that extracts signing sheets automatically has not worked reliably since early this year.  It relies on sheet titles being populated as bookmarks in the PDF, and plans sets that have had bookmarks started slowing to a trickle sometime in the late winter and have now stopped altogether.  I have investigated the possibility of dumping each sheet to plain text and searching for signing-related keywords, a strategy that has worked well with other state DOTs that include metadata when they plot sheets.  With MoDOT, however, attempts at dumping text return just one garbage character per sheet.

mvak36:
October 22, 2021 Letting (Emergency Letting): Bid Results. Bid Award Winners.

Job J5S3410 Route Sorrels Overpass BOONE County. Bridge superstructure replacement over I-70 in Columbia, the total length of improvement being 0.272 miles.

Article about bridge damage: https://www.columbiamissourian.com/news/modot-updates-plans-for-sorrels-overpass/article_96631b16-30e3-11ec-b258-dbdee70685ab.html

MODOT News Release

--- Quote ---COLUMBIA – The Missouri Department of Transportation has awarded a contract for the accelerated replacement of the North Sorrel Overpass Drive bridge over Interstate 70 west of Columbia. The overpass, located at mile marker 122 on the west side of Columbia, was significantly damaged by a passing truck on Monday, October 18. The damages resulted in the closure of the bridge.

A plan had previously been in place to replace the 63-year-old bridge in 2022. However, this damage placed the bridge on a fast track for completion. The contract was awarded to Emery Sapp and Sons, Inc., which submitted the low bid of $1,038,857.

“In the aftermath of Monday’s crash, it became imperative to accelerate this project,” said Assistant Central District Engineer Randy Aulbur. “With the awarding of this contract, the contractor can begin as early as Monday, October 25. We are excited to move forward with the demolition and replacement of this structure.”

Under the terms of the contract, the current bridge must be demolished by November 8. MoDOT says there will be closures along I-70 as that demolition takes place. Closures will take place overnight and the majority will be single lane closures. Any full eastbound or westbound closures that are necessary will be limited to 15 minutes in one direction before traffic will be opened and allowed to clear. Motorists are encouraged to use alternate routes when possible, add extra time to their commute, and expect some delays in both directions of I-70.

“The closures are necessary for the safety of travelers and workers on the road,” said Aulbur. “We will be working with the contractor to limit those closures and keep them as brief as possible.”

Updates on specific closure times will be available through the MoDOT Traveler Information Map, signs on the roadway, news releases and social media. Details on the construction of the new bridge will be released once demolition is complete. MoDOT appreciates the patience of motorists during this project.

--- End quote ---

Project Website

Revive 755:

--- Quote from: mvak36 on October 08, 2021, 03:58:13 PM --- Route 367 ST LOUIS County. Resurface on Route 367 from North of I-270 to Halls Ferry Circle, the total length of improvement being 3.42 miles.

Job J6P3478 Route Various VARIOUS County. Sign Installation various locations in the St. Louis District, the total length of improvement being 0 miles.
--- End quote ---

There are also a lot of retroreflective signal backplates going in with this one.

mvak36:
The winning bids for the October letting were awarded at the MHTC meeting on 11/3/21.

mvak36:
December 17, 2021 Letting:

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J1MAMD02 Route Various VARIOUS County. Resurface in various counties in the Northwest District, the total length of improvement being 76.644 miles.

(1): Job J1P3446 Route 13 CALDWELL County. Bridge repair over Route 36 in Hamilton, the total length of improvement being 0.021 miles.
(2): Job J1P3456 Route 36 CALDWELL County. Sign installation in eastbound and westbound lanes 0.5 mile from route 13 in Hamilton, the total length of improvement being 0 miles.

(1): Job J2P3211 Route 79 PIKE, RALLS County. Resurface from Routes E and N to 0.8 Mile South of Route 54 East Junction in Louisiana, the total length of improvement being 24.52 miles.
(2): Job J2P3218 Route 54, 79 PIKE County. ADA improvement from Dougherty Pike to 4th Street and Noyes Street to South Carolina Street in Louisiana, the total length of improvement being 0.657 miles.
(3): Job J2P3346 Route 54, 79 PIKE, RALLS County. Pavement improvements from Routes E and N to 0.1 Mile North of Route 54 near Louisiana, the total length of improvement being 22.071 miles.

(1): Job J2P3241 Route 79 LINCOLN County. Resurface from Route N to 0.8 Mile North of Route C near Old Monroe, the total length of improvement being 3.77 miles.
(2): Job J2P3259 Route 61 LINCOLN, PIKE County. Resurface northbound Lanes from Route V to 0.4 Mile South of Route UU in Pike County near Bowling Green, the total length of improvement being 25.579 miles.

(1): Job J2P3248 Route 24 RANDOLPH County. Resurface and add shoulder from 0.9 mile east of Route 63 to the Monroe County line near Milton, the total length of improvement being 5.848 miles.
(2): Job J2S3337 Route Z RANDOLPH County. Resurface from Route DD to Route 63 near Cairo, the total length of improvement being 3.3 miles.
(3): Job J2S3340 Route PP MACON County. Resurface from Route 63 to Route V near Macon, the total length of improvement being 7.612 miles.

(1): Job J2P3258 Route 54 AUDRAIN County. Resurface from Route J in Mexico to Route 19 south junction near Martinsburg, the total length of improvement being 11.57 miles.
(2): Job J2S3265 Route J AUDRAIN County. Resurface from Bus 54 in Mexico to Route 54 at Basinger Corner, the total length of improvement being 17.796 miles.
(3): Job J2S3336 Route KK AUDRAIN County. Resurface from Route J to Route B near Rush Hill, the total length of improvement being 6.72 miles.

Job J2S3358 Route BUS 61 PIKE County. Grading and pavement at Route 161 and South Court Street in Bowling Green, the total length of improvement being 0.0825 miles.
Job J2S3369 Route BUS 63 ADAIR County. Grading and pavement from Route 63 west outer road to Route 6 north junction in Kirksville, the total length of improvement being 1.181 miles.
Job J5I3252 Route I-70 COOPER County. Resurface from the Saline County line to west of the Missouri River, the total length of improvement being 52.249 miles.
Job J5MAMD03 Route Various GASCONADE, OSAGE County. Resurface on Rte. J from Rte. 89 to SME, Osage Rte. N from US 50 to Rte. 100, Gasconade Rte. F from Rte. 19 to SME, Gasconade Rte. CC from Rte. B to SME, the total length of improvement being 42.542 miles.

(1): Job J5P3439 Route 42, Osage Beach Pkwy CAMDEN, MILLER County. Resurface and guardrail replacement from Osage Beach Pkwy to Iberia, the total length of improvement being 21.73 miles.
(2): Job J5P3499 Route 54 CAMDEN County. Resurface from the Grand Glaize Bridge to east of East Osage Beach Parkway in Osage Beach, the total length of improvement being 6.239 miles.

Job J5S3349 Route U PHELPS County. Bridge redeck over I-44, the total length of improvement being 0.049 miles.

(1): Job J5S3330 Route 40 HOWARD County. Bridge replacement 1.95 miles west of Route 240, near Rocheport, the total length of improvement being 0.353 miles.
(2): Job J5S3403 Route F COOPER County. Bridge redeck over Stephens Branch, the total length of improvement being 0.053 miles.
(3): Job J5S3416 Route 40 HOWARD County. Bridge redeck over Bonne Femme Creek, the total length of improvement being 0.06 miles.

Job J5S3470 Route 179, AA COLE, MONITEAU County. Resurface on Route 179 from Route 87 to Truman Blvd. and on Route AA from Route 179 to Route 87, the total length of improvement being 22.189 miles.
Job J5S3492 Route Various MILLER, MONITEAU County. Resurface from E to 52 in Eldon, the total length of improvement being 30.86 miles.
Job J5I3413 Route I-70 BOONE, CALLAWAY County. Bridge rehabilitation of westbound lanes over Cedar Creek and Little Cedar Creek east of Columbia, the total length of improvement being 0.294 miles.
Job J5P3332 Route 32 LACLEDE County. Bridge Replacement over Mill Creek south of Route U near Nebo, the total length of improvement being 0.051 miles.
Job J5S3317 Route D CALLAWAY County. Resurface and shoulder widening from I-70 to Route 94, the total length of improvement being 18.175 miles.
Job J6P3242B Route 21 JEFFERSON County. Intersection improvements at Lowry Lane, the total length of improvement being 0.607 miles.

(1): Job J6S3272 Route I-44 ST LOUIS CITY County. Bridge replacement at Broadway over I-44, the total length of improvement being 0.314 miles.
(2): Job J6S3638 Route I-44 ST LOUIS CITY County. Grading and pavement to rebuild off ramp from I-44 express lane to Broadway, the total length of improvement being 0.314 miles.

(1): Job J7P3191B Route E NEWTON County. Bridge rehabilitation and guardrail replacement over Shoal Creek 1.3 miles north of Granby, the total length of improvement being 0.223 miles.
(2): Job J7P3191C Route E NEWTON County. Guardrail Replacement over BNSF RR north of Shoal Creek, the total length of improvement being 0.166 miles.

Job J8S3222 Route KK GREENE County. Replace culvert east of Hidden Lake Ln, the total length of improvement being 0.092 miles.
Job J9S3063B Route M SCOTT County. Signal and ADA improvements from the West Outer Road of I-55 to East Outer Roads of I-55 in Scott City, the total length of improvement being 0.296 miles.
Job J9S3452 Route 177 CAPE GIRARDEAU County. Grading, pavement, and bridge replacement from south of County Road 651 to north of County Road 643, the total length of improvement being 0.98 miles.
Job J9I3597 Route 155 PEMISCOT County. Resurface from Rte. 412 to Tennessee State line, the total length of improvement being 19.978 miles.

(1): Job J9S3560 Route 162 NEW MADRID County. Bridge Replacement over Drainage Ditches 1 & 251, the total length of improvement being 0.242 miles.
(2): Job J9S3562 Route 162 NEW MADRID County. Culvert replacement over Drainage Ditch 62, the total length of improvement being 0.057 miles.

EDIT: Additional Lettings added
Job J5S3350 Route B PHELPS County. Bridge replacement over Clear Creek near Royal, the total length of improvement being 0.21 miles.

(1): Job J6I3149 Route I-55 ST LOUIS County. Bridge Rehabilitation from Holly Hills Ave to Arsenal St, the total length of improvement being 3.888 miles.
(2): Job J6I3187 Route I-55 ST LOUIS County. Bridge Rehabilitation from Lindbergh Blvd (61/67) to Holly Hills Ave, the total length of improvement being 5.654 miles.