Author Topic: US 74 in Shelby NC  (Read 22403 times)

cowboy_wilhelm

  • *
  • Offline Offline

  • Posts: 331
  • Location: Raleigh
  • Last Login: November 25, 2023, 08:13:52 PM
Re: US 74 in Shelby NC
« Reply #75 on: May 23, 2023, 11:41:45 AM »

Project plans have been posted for the final sections of the U.S. 74 Shelby Bypass. The contract will be let 7/18/2023 and construction can begin 8/28/2023. Completion date is 4/30/2029 with substantial completion by 11/1/2028.

A few items I’ve noticed:

Speed limit of 65 MPH… figured it would have been 70.
Bus 74 will get an exit number (211), but still no exit numbers for the three interchanges at Kings Mountain. Seems like a missed opportunity to incorporate design and construction with this project.
Eastbound control city will be Gastonia and not Charlotte.

Project proposal and plans.
Logged

sprjus4

  • *
  • Offline Offline

  • Posts: 8660
  • Location: Hampton Roads, VA
  • Last Login: December 08, 2023, 02:15:23 AM
Re: US 74 in Shelby NC
« Reply #76 on: May 23, 2023, 12:43:09 PM »

^ As far as the speed limit, I imagine NCDOT may at some point in the future increase it to 70 mph, but at the same time I would not be surprised if they leave it 65 mph since they are notoriously inconsistent with speed setting.
Logged

cowboy_wilhelm

  • *
  • Offline Offline

  • Posts: 331
  • Location: Raleigh
  • Last Login: November 25, 2023, 08:13:52 PM
Re: US 74 in Shelby NC
« Reply #77 on: May 29, 2023, 08:41:23 PM »

Looking back at the project plans, the design speed for many of the curves is only 70 MPH, so it the posted speed limit may end up staying at 65.

Paving is taking place westbound on the Y-line at NC 18. I guess it's possible they'll have all of this section paved by the end of the summer. Not a great picture looking east (it was getting dark and I couldn't slow down too much due to traffic).



Still grading and drainage work at the N. Lafayette St. overpass (looking east).

Logged

ARMOURERERIC

  • *
  • Offline Offline

  • Posts: 1308
  • Age: 59
  • Location: Morganton NC
  • Last Login: December 08, 2023, 08:14:15 PM
Re: US 74 in Shelby NC
« Reply #78 on: May 29, 2023, 09:13:19 PM »

Just getting it open to NC18 from the west will have a big impact on Shelby traffic
Logged

74/171FAN

  • *
  • *
  • Offline Offline

  • Posts: 4735
  • Age: 31
  • Location: Harrisburg, PA
  • Last Login: December 08, 2023, 11:12:09 PM
Re: US 74 in Shelby NC
« Reply #79 on: July 19, 2023, 01:36:45 PM »

So is the SR Designation of SR 9000 according to OSM for the Shelby Bypass actually correct?
Logged
I am now a PennDOT employee.  My opinions/views do not necessarily reflect the opinions/views of PennDOT.

Mapmikey

  • *
  • Offline Offline

  • Posts: 4299
  • Co-curator with Froggie of www.vahighways.com

  • Age: 53
  • Last Login: December 08, 2023, 09:29:08 PM
    • Co-curator Virginia Highways Project
Re: US 74 in Shelby NC
« Reply #80 on: July 19, 2023, 02:13:06 PM »

So is the SR Designation of SR 9000 according to OSM for the Shelby Bypass actually correct?

NCDOT frequently assigns SR 900x designations to freeway projects that are either under construction or if open, those they don't want to give a temp NC number to.
Logged

The Ghostbuster

  • *
  • Offline Offline

  • Posts: 4672
  • Age: 39
  • Location: Madison, WI
  • Last Login: December 08, 2023, 09:12:23 PM
Re: US 74 in Shelby NC
« Reply #81 on: July 19, 2023, 03:07:52 PM »

I would have liked it if there were at least Future US 74 Bypass signs along the completed portions of the Shelby Bypass. Instead, the overhead signs say To NC 226 at Exit 194, with no route signs or reassurance shields along the roadway after on-ramps. Is this normal for new North Carolina roadways?
Logged

ARMOURERERIC

  • *
  • Offline Offline

  • Posts: 1308
  • Age: 59
  • Location: Morganton NC
  • Last Login: December 08, 2023, 08:14:15 PM
Re: US 74 in Shelby NC
« Reply #82 on: July 19, 2023, 05:08:32 PM »

I would have liked it if there were at least Future US 74 Bypass signs along the completed portions of the Shelby Bypass. Instead, the overhead signs say To NC 226 at Exit 194, with no route signs or reassurance shields along the roadway after on-ramps. Is this normal for new North Carolina roadways?

As a Pseudo local, this would cause more driver confusion than help.  If they can get it open to NC 18 or 150, then I may reconsider.  Right now the biggest use for what is open is to get trucks from the Walmart distribution center an egress to the west.
Logged

cowboy_wilhelm

  • *
  • Offline Offline

  • Posts: 331
  • Location: Raleigh
  • Last Login: November 25, 2023, 08:13:52 PM
Re: US 74 in Shelby NC
« Reply #83 on: July 19, 2023, 07:47:53 PM »

 
So is the SR Designation of SR 9000 according to OSM for the Shelby Bypass actually correct?

NCDOT frequently assigns SR 900x designations to freeway projects that are either under construction or if open, those they don't want to give a temp NC number to.

https://xfer.services.ncdot.gov/gisdot/DOTDELetters/2020/07_July/Div12/R-2707F.pdf
Logged

cowboy_wilhelm

  • *
  • Offline Offline

  • Posts: 331
  • Location: Raleigh
  • Last Login: November 25, 2023, 08:13:52 PM
Re: US 74 in Shelby NC
« Reply #84 on: July 27, 2023, 03:28:08 PM »

Contracts have been awarded for the last sections of the Shelby Bypass and the new interchange at Mooresboro. Construction can begin on the rest of the bypass at the end of August and is supposed to be completed by the end of October 2028. Once both projects are finished, U.S. 74 will be a continuous freeway from I-26 to I-85.

R-2707D/E award letter
R-4045 award letter

Google Street View has updated imagery from July at the future N.C. 18 interchange where paving is ongoing. It doesn't look like the Airport Rd. overpass has started construction yet.

Looking east toward the future Airport Rd. overpass and N.C. 150/N.C. 180 interchange and westbound paving.



Looking west at eastbound paving prep.

Logged

ARMOURERERIC

  • *
  • Offline Offline

  • Posts: 1308
  • Age: 59
  • Location: Morganton NC
  • Last Login: December 08, 2023, 08:14:15 PM
Re: US 74 in Shelby NC
« Reply #85 on: August 10, 2023, 09:41:42 PM »

Drove by today.  Looks like all the paving east of the NC 18 bridge is done.
Logged

cowboy_wilhelm

  • *
  • Offline Offline

  • Posts: 331
  • Location: Raleigh
  • Last Login: November 25, 2023, 08:13:52 PM
Re: US 74 in Shelby NC
« Reply #86 on: October 09, 2023, 08:58:21 PM »

Looking east from Metcalf Rd.


Looking east from N. Lafayette St.


Looking west from N. Lafayette St.


Looking east from McBrayer-Springs Rd.


Looking east from N.C. 18/Fallston Rd.


Looking west from the future Airport Rd. overpass.


Future Airport Rd. overpass. Bonus points if you find the orange cat.
Logged

ARMOURERERIC

  • *
  • Offline Offline

  • Posts: 1308
  • Age: 59
  • Location: Morganton NC
  • Last Login: December 08, 2023, 08:14:15 PM
Re: US 74 in Shelby NC
« Reply #87 on: October 22, 2023, 07:12:53 PM »

Drove down NC 180 today, looks like beam placement for Airport Rd is 65-100% complete.
Logged

Gnutella

  • *
  • Offline Offline

  • Posts: 595
  • Last Login: December 08, 2023, 01:49:02 AM
Re: US 74 in Shelby NC
« Reply #88 on: October 27, 2023, 10:42:42 PM »

Future Airport Rd. overpass. Bonus points if you find the orange cat.


Sitting in the crane?
Logged

cowboy_wilhelm

  • *
  • Offline Offline

  • Posts: 331
  • Location: Raleigh
  • Last Login: November 25, 2023, 08:13:52 PM
Re: US 74 in Shelby NC
« Reply #89 on: November 05, 2023, 10:26:42 AM »

Bonus points if you find the orange cat.

Sitting in the crane?

Nope, and since no one else has taken a guess....

Logged

 