Author Topic: Complete NC 540 Project  (Read 73185 times)

Dirt Roads

  • *
  • Offline Offline

  • Posts: 2642
  • Location: Central North Carolina
  • Last Login: December 05, 2023, 01:19:09 PM
Re: Complete NC 540 Project
« Reply #250 on: June 09, 2023, 09:06:35 PM »

US 70 East exit ramps from I-40 to be closed this weekend due to crews making connections to new ramps as part of NC 540 extension project:
https://www.ncdot.gov/news/press-releases/Pages/2023/2023-06-09-us-70-exit-close-for-540-project.aspx

Aah.  The detour for Future I-42 involves a routing over NC-42.  Will wonders ever cease?
Logged

LM117

  • *
  • Offline Offline

  • Posts: 3268
  • Age: 34
  • Location: Danville, VA 👎
  • Last Login: December 05, 2023, 11:47:13 AM
Re: Complete NC 540 Project
« Reply #251 on: August 16, 2023, 06:06:37 PM »

Meanwhile, around July 11, Deer Meadow Drive is expected to close for about a year.

https://www.ncdot.gov/news/press-releases/Pages/2022/2022-07-01-complete-540-deerborn-drive-extension.aspx

It should reopen tomorrow.

https://www.ncdot.gov/news/press-releases/Pages/2023/2023-08-14-complete-540-opening-deer-meadow.aspx

In other news, a 4-month closure of a section of Donny Brook Road is expected to begin around August 21.

https://www.ncdot.gov/news/press-releases/Pages/2023/2023-08-16-complete-540-donny-brook-closure.aspx

There are also upcoming overnight closures on I-40 East at the US-70 interchange (Exit 309).

https://www.ncdot.gov/news/press-releases/Pages/2023/2023-08-16-i-40-east-540-70-closed-detour.aspx
Logged
“I don’t know whether to wind my ass or scratch my watch!” - Jim Cornette

cowboy_wilhelm

  • *
  • Offline Offline

  • Posts: 331
  • Location: Raleigh
  • Last Login: November 25, 2023, 08:13:52 PM
Re: Complete NC 540 Project
« Reply #252 on: September 08, 2023, 09:35:59 PM »

Section B of the the southeast extension was awarded this week as a design-build project. This is the northern portion from Rock Quarry Rd. to I-540/U.S. 64. The proposed completion date is September 20, 2028. Section A from Rock Quarry Rd. to I-40/U.S. 70 is scheduled to be let next month.

Award Letter C204825

Map 1
Map 2
Map 3
Map 4
Logged

mvak36

  • *
  • Offline Offline

  • Posts: 1352
  • Last Login: Today at 08:56:48 AM
Re: Complete NC 540 Project
« Reply #253 on: September 13, 2023, 07:57:45 PM »

Section B of the the southeast extension was awarded this week as a design-build project. This is the northern portion from Rock Quarry Rd. to I-540/U.S. 64. The proposed completion date is September 20, 2028. Section A from Rock Quarry Rd. to I-40/U.S. 70 is scheduled to be let next month.

Award Letter C204825

Map 1
Map 2
Map 3
Map 4

Did they say what the completion date would be?
Logged
Counties: Counties visited
Travel Mapping: Summary

LM117

  • *
  • Offline Offline

  • Posts: 3268
  • Age: 34
  • Location: Danville, VA 👎
  • Last Login: December 05, 2023, 11:47:13 AM
Re: Complete NC 540 Project
« Reply #254 on: September 21, 2023, 01:47:32 PM »

Section B of the the southeast extension was awarded this week as a design-build project. This is the northern portion from Rock Quarry Rd. to I-540/U.S. 64. The proposed completion date is September 20, 2028. Section A from Rock Quarry Rd. to I-40/U.S. 70 is scheduled to be let next month.

Award Letter C204825

Map 1
Map 2
Map 3
Map 4

Did they say what the completion date would be?

According to today's NCDOT press release, completion date is 2028. Construction will begin in 2024.

https://www.ncdot.gov/news/press-releases/Pages/2023/2023-09-21-first-contract-awarded-complete540.aspx
Logged
“I don’t know whether to wind my ass or scratch my watch!” - Jim Cornette

Plutonic Panda

  • *
  • Online Online

  • Posts: 3829
  • Location: Los Angeles/OKC
  • Last Login: Today at 04:11:05 PM
Logged

The Ghostbuster

  • *
  • Online Online

  • Posts: 4654
  • Age: 39
  • Location: Madison, WI
  • Last Login: Today at 04:13:56 PM
Re: Complete NC 540 Project
« Reply #256 on: October 06, 2023, 01:17:14 PM »

The article spelled Raleigh wrong. Nevertheless, it will be great to the Southern Wake Expressway segment of NC 540 completed, and construction on the Eastern Wake Expressway segment commencing.
Logged

nerdom

  • *
  • Offline Offline

  • Posts: 43
  • Location: new bern nc
  • Last Login: December 05, 2023, 07:34:50 AM
Re: Complete NC 540 Project
« Reply #257 on: October 08, 2023, 10:02:59 PM »

The article spelled Raleigh wrong. Nevertheless, it will be great to the Southern Wake Expressway segment of NC 540 completed, and construction on the Eastern Wake Expressway segment commencing.

I drive between New Bern and Durham twice a week for work. I'm literally dying for the southern arc to open. Late spring doesn't sound too bad.
Logged

1995hoo

  • *
  • Offline Offline

  • Posts: 15988
  • Age: 50
  • Location: Fairfax County, Virginia
  • Last Login: Today at 03:50:14 PM
Re: Complete NC 540 Project
« Reply #258 on: October 09, 2023, 11:28:25 AM »

The article spelled Raleigh wrong. Nevertheless, it will be great to the Southern Wake Expressway segment of NC 540 completed, and construction on the Eastern Wake Expressway segment commencing.

I drive between New Bern and Durham twice a week for work. I'm literally dying for the southern arc to open. Late spring doesn't sound too bad.

Have you made funeral arrangements yet? Sounds like you won’t make it to spring.
Logged
"You know, you never have a guaranteed spot until you have a spot guaranteed."
—Olaf Kolzig, as quoted in the Washington Times on March 28, 2003,
commenting on the Capitals clinching a playoff spot.

"That sounded stupid, didn't it?"
—Kolzig, to the same reporter a few seconds later.

nerdom

  • *
  • Offline Offline

  • Posts: 43
  • Location: new bern nc
  • Last Login: December 05, 2023, 07:34:50 AM
Re: Complete NC 540 Project
« Reply #259 on: October 10, 2023, 01:13:56 PM »

Cremated and ashes spread from the highest point of the 42/40/540 interchange... only if not completed.
Logged

LM117

  • *
  • Offline Offline

  • Posts: 3268
  • Age: 34
  • Location: Danville, VA 👎
  • Last Login: December 05, 2023, 11:47:13 AM
Re: Complete NC 540 Project
« Reply #260 on: October 18, 2023, 06:17:08 PM »

Logged
“I don’t know whether to wind my ass or scratch my watch!” - Jim Cornette

bob7374

  • *
  • Offline Offline

  • Posts: 1938
  • Age: 59
  • Location: East Weymouth, Massachusetts
  • Last Login: December 04, 2023, 09:31:26 PM
    • Bob Malme's Road Pages
Re: Complete NC 540 Project
« Reply #261 on: October 19, 2023, 12:07:00 PM »

The new Holly Springs Road bridge is expected to open on Oct. 21.

https://www.ncdot.gov/news/press-releases/Pages/2023/2023-10-18-complete540-opening-holly-springs-bridge.aspx
They are also closing I-40 West at (for now) NC 42 Thursday and Friday nights for NC 540 related work:
https://www.ncdot.gov/news/press-releases/Pages/2023/2023-10-19-interstate-40-closure-nc-42.aspx

Meanwhile, the NCDOT traffic map indicates the closure of the ramp from the US 70 Bypass (Future I-42) West to I-40 East that was supposed to end in early September is now planned through the end of the year.

LM117

  • *
  • Offline Offline

  • Posts: 3268
  • Age: 34
  • Location: Danville, VA 👎
  • Last Login: December 05, 2023, 11:47:13 AM
Re: Complete NC 540 Project
« Reply #262 on: November 08, 2023, 12:48:51 PM »

Quote
On or around November 14, Donny Brook Road east of Juaquin Lane and west of Reigate Lane is scheduled to reopen to traffic. Detour signs and barricades will be removed, and motorists will once again have full access to the road. The reopening of this road is weather dependent.

https://www.ncdot.gov/news/press-releases/Pages/2023/2023-11-08-complete-540-donny-brook-road-open.aspx
Logged
“I don’t know whether to wind my ass or scratch my watch!” - Jim Cornette

cowboy_wilhelm

  • *
  • Offline Offline

  • Posts: 331
  • Location: Raleigh
  • Last Login: November 25, 2023, 08:13:52 PM
Re: Complete NC 540 Project
« Reply #263 on: November 08, 2023, 01:43:29 PM »

The last section of 540 was awarded last week. This will complete the loop in 2028.

Award Letter
Logged

The Ghostbuster

  • *
  • Online Online

  • Posts: 4654
  • Age: 39
  • Location: Madison, WI
  • Last Login: Today at 04:13:56 PM
Re: Complete NC 540 Project
« Reply #264 on: November 08, 2023, 04:51:24 PM »

I had previously heard that the full loop would be completed sometime between 2030 and 2033. I would be very surprised if it were completed by 2028.
Logged

orulz

  • *
  • Offline Offline

  • Posts: 159
  • Age: 41
  • Location: NC
  • Last Login: December 04, 2023, 12:24:28 PM
Re: Complete NC 540 Project
« Reply #265 on: November 13, 2023, 10:19:36 AM »

I wish they would widen (and upgrade to Interstate standards) Future I-87 between US64 business in Knightdale and the US64/US264/I-87/I-587 split in Zebulon before finishing 540. That solves a much more existential problem for Eastern Wake than completing 540.

This unflinching commitment to finishing 540 above all else is sucking up too much of our region's transportation money.
Logged

bob7374

  • *
  • Offline Offline

  • Posts: 1938
  • Age: 59
  • Location: East Weymouth, Massachusetts
  • Last Login: December 04, 2023, 09:31:26 PM
    • Bob Malme's Road Pages
Re: Complete NC 540 Project
« Reply #266 on: November 13, 2023, 11:58:18 AM »

I wish they would widen (and upgrade to Interstate standards) Future I-87 between US64 business in Knightdale and the US64/US264/I-87/I-587 split in Zebulon before finishing 540. That solves a much more existential problem for Eastern Wake than completing 540.

This unflinching commitment to finishing 540 above all else is sucking up too much of our region's transportation money.
Unfortunately, the latest STIP removed any funding for upgrading and widening US 64/264 meaning, currently, there's no plans for the project to start until after 2033, several years after NC 540 is completed. Perhaps realization of increased traffic and the planned upgrading of US 264 to I-587 east of Zebulon will accelerate the starting of the project in future STIPs.

architect77

  • *
  • Offline Offline

  • Posts: 541
  • Location: Atlanta
  • Last Login: November 22, 2023, 12:56:06 AM
Re: Complete NC 540 Project
« Reply #267 on: November 13, 2023, 08:50:06 PM »

I wish they would widen (and upgrade to Interstate standards) Future I-87 between US64 business in Knightdale and the US64/US264/I-87/I-587 split in Zebulon before finishing 540. That solves a much more existential problem for Eastern Wake than completing 540.

This unflinching commitment to finishing 540 above all else is sucking up too much of our region's transportation money.


Isn't there a separation between building a tolled road and allocations for all the other roads in the state?

I would think with sold bonds there would be money right away for I-540 that isn't competing with other road projects for gas-tax generated funding statewide.

Logged

bob7374

  • *
  • Offline Offline

  • Posts: 1938
  • Age: 59
  • Location: East Weymouth, Massachusetts
  • Last Login: December 04, 2023, 09:31:26 PM
    • Bob Malme's Road Pages
Re: Complete NC 540 Project
« Reply #268 on: November 27, 2023, 12:32:08 PM »

NCDOT announces awarding of final Complete 540 contract, due to be finished in 2028:
https://www.ncdot.gov/news/press-releases/Pages/2023/2023-11-27-final-contract-awarded-complete-540-phase-2.aspx

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.