Any bets on when they'll start resigning US 67 at I-40 in North Little Rock?
As in posting I-57 vs "Future 57"?
Posting I-57 reassurance signs.
I would think where new pavement would be laid would be posted with "Future I-57". No?
Maybe when it's complete to Sikeston?
Makes sense -- it's not like I-49 in NWA, where (a) there was an existing Interstate, and the action was simply a number change, and (b) it, like I-540 before it, connected an area with substantial population and equally substantial commercial interests to the rest of the Interstate system. Functionally, the existing Interstate-grade freeway portion of the I-57 corridor that could conceivably receive signage goes to a junction (US 63/412) and abruptly stops -- with the remainder of the corridor up to the state line and beyond in the very early planning stages; a specific alignment hasn't even been selected as of yet. It's a freeway to, if not nowhere, at least nowhere significant. If I were ARDOT, I'd hold off on any
real 57 reassurance shields until at least that extension to the state line is finalized --
plus an agreement with MODOT regarding the remainder of the route to Poplar Bluff is solidified. Full signage is pointless until then.