News:

The AARoads Wiki is live! Come check it out!

Main Menu

New SR 520 Floating Bridge

Started by Bruce, January 13, 2016, 08:18:50 PM

Previous topic - Next topic

jakeroot

#75
Quote from: Bruce on September 12, 2024, 01:45:25 PMThe Montlake interchange's HOV ramps will open September 16:

https://www.youtube.com/watch?v=d15zUnb5i0g

I would love to have seen a mini roundabout instead of an all-way stop, especially when the all-way stop is surrounded by traffic lights. Would not surprise me if people consistently perform "California" stops when they can see the traffic light is green at E Lake Washington Blvd and are looking to make the light.

For the westbound movement towards northbound Montlake, does anyone know if it's meant to be a triple right turn, where the HOV right turn and off-ramp double right turn happen simultaneous with one-another? Having an extra phase to separate them does not seem like a good idea, but having two separate roadways merge mid-intersection isn't too common even with straight-ahead traffic, much less turning traffic.



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.