« Reply #2982 on: November 09, 2018, 07:26:43 PM »
I drove the Interstate this week. Both directions from Martinsville to Bloomington & back, the mainlanes of the Interstate are completed. The lane closures look to be shoulder work or landscaping, sign work and other construction to the side of the highway. There are even several mileage signs up in both directions. Southbound Washington & Evansville are mentioned (I even saw one in section 4 before I turned around), and northbound Indianapolis is listed. Most of the closures are north of SR 46. The signage for Exit 114 (I-69/SR 37 split) needs updating headed northbound. The lanes are striped correctly, however the BGS and little green signs are from the pre-interstate state.
IMO, the freeway should be completely open by Thanksgiving. Most of the work left looks as if construction could be completed during off-peak hours.
By the way, section 4 is down to one lane between miles 111-112. Work on the hillside. Looks like INDOT is trying to 'shore it up'.

Logged
2DI's traveled: 5, 8, 10, 12, 15, 20, 24, 30, 35, 39, 40, 41, 43, 44, 45, 49, 55, 57, 59, 64, 65, 66, 68, 69, 70, 71, 72, 74, 75, 76, 77, 78, 79, 80, 81, 85, 87, 88, 90, 93, 94, 95, 96