AARoads Forum

Please login or register.

Login with username, password and session length
Advanced search  

News:

The AARoads Wiki is live! Come check it out!

Author Topic: MODOT Contract Lettings  (Read 66574 times)

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #75 on: April 15, 2019, 09:53:20 AM »

May 17, 2019 Letting: Bid Results. Bid Award Winners.

Notable Projects:
Job J1S3055 Route 111 ATCHISON County. Bridge replacement over Mill Creek, 1 mile south of Route Z near Corning, the total length of improvement being 0.265 miles.
Job J4I3189 Route I-435 CLAY County. Bridge deck replacement over the Missouri River, the total length of improvement being 1.14 miles.
Job J3I3145 Route I-70 VARIOUS County. Sign improvements on various ramp locations in the KC District, the total length of improvement being 53.452 miles.
Job J4I3324 Route I-70 JACKSON County. Sign improvements at various ramps in KC District, the total length of improvement being 27.397 miles.
Job J5I3136 Route I-70, 54 CALLAWAY County. Pipe repair east and north of Kingdom City, the total length of improvement being 4.216 miles.
Job J5M0286 Route V PHELPS County. Pavement improvements over I-44 east of Rolla, the total length of improvement being 0.083 miles.
Job J5S3232 Route M, B, 124 BOONE County. Resurface from Route Y to Route DD, includes Route B and Route 125 in Hallsville, the total length of improvement being 2.284 miles.
Job J5P3015 Route Dix Road COLE County. Bridge deck repair over Route 50 and 0.22 miles north of Business 50, the total length of improvement being 0.547 miles.
Job J6P3242 Route 21 JEFFERSON County. Intersection improvements at Amvets Drive in De Soto and Hilltop Mobile Home Court in Hillsboro, the total length of improvement being 0.437 miles.
Job J6P3142 Route 67 JEFFERSON County. Add acceleration lanes at Flucom Road south of Olympian Village, the total length of improvement being 0.76 miles.
Job J6S3267 Route 180 ST LOUIS County. Microsurface from Pennridge/Boenker to I-270, the total length of improvement being 0.14 miles.
Job J6S3196 Route H ST LOUIS CITY County. Resurface from Hall Street to North of I-270 Interchange, the total length of improvement being 3.878 miles.
Job J6M0271 Route 67 ST LOUIS County. Barrier wall improvements along the Hi-Collector Road (West of Lindbergh), the total length of improvement being 0.09 miles.
Job J7P3375 Route 37 BARRY County. Resurface and bridge rehabilitation from Dairy Street to Route 60, the total length of improvement being 0.091 miles.
Job J7P3157 Route 37 JASPER County. Bridge replacement over Center Creek, the total length of improvement being 0.149 miles.
Job J7P3165 Route 54, BL49 VERNON County. ADA improvements on Route 54 and Loop 49 in Nevada, the total length of improvement being 3.45 miles.
Job J7P3108C Route I-44 WEBSTER County. High friction surface treatment 3 miles west of Route B near Northview and on the westbound lanes 2 miles west of Route 38 in Marshfield, the total length of improvement being 2.19 miles.
Job J7P3108B Route Various BARRY, BARTON, BATES, BENTON, CASS, CHRISTIAN, GREENE, HENRY, JASPER, MCDONALD, NEWTON, POLK, ST CLAIR, STONE, TANEY County. Sign improvement various location throughout SW district, the total length of improvement being 39.842 miles.
Job J7S3345 Route Gaines Drive HENRY County. Pavement improvements and intersection improvements from Route 13 to Route 52 in Clinton, the total length of improvement being 1.078 miles.

The following four sets of projects were let as one project (for each set):
(1): Job J1P3128 Route 159 HOLT County. Bridge replacement over Penny Slough Creek, 1.2 miles west of Rte. 111 near Fortescue, the total length of improvement being 0.106 miles.
(2): Job J1S3127 Route 159 HOLT County. Bridge redeck on bridge over I-29 near Mound City, the total length of improvement being 0.112 miles.

(1): Job J3S3117 Route 58 JOHNSON County. ADA and pavement improvements from Charles Street to 9th Street in Holden, the total length of improvement being 1.031 miles.
(2): Job J3S3117B Route 131 JOHNSON County. ADA improvements and resurface from McKossick to 10th Street in Holden, the total length of improvement being 0.488 miles.

(1): Job J8P3093 Route 14 CHRISTIAN County. Pavement improvements from Cedar Heights Drive to Estes Street in Nixa, the total length of improvement being 1.34 miles.
(2): Job J8P3104 Route 14 CHRISTIAN County. ADA improvements from Cedar Heights Drive to Ellen Street in Nixa, the total length of improvement being 1.18 miles.

(1): Job J9I3125 Route I-55 CAPE GIRARDEAU County. Bridge replacements over Route 61, the total length of improvement being 0.808 miles.
(2): Job J9P3460 Route 61 CAPE GIRARDEAU County. Add interchange for diverging diamond from Old Orchard Road to 0.2 miles south of Veterans Memorial Drive, the total length of improvement being 1.53 miles.

Edit: Additional projects added to the letting:
Job J2M0277 Route 15 AUDRAIN County. Pavement improvements from 1.6 to 1.3 miles north of Route 22 near Mexico, the total length of improvement being 0.314 miles.
Job J9P3357 Route 61 CAPE GIRARDEAU County. Resurface from 0.3 miles south of Route I-55 to Route 34/Route 25, the total length of improvement being 3.611 miles.

(1): Job J8P0601B Route 160 GREENE County. Grading and paving from north of County Road 94 to north of I-44 between Willard and Springfield., the total length of improvement being 3.4564 miles.
(2): Job J8P0601C Route 160 GREENE County. Grading and paving from near Route AB to near north of County Road 94 in Willard., the total length of improvement being 2.4867 miles.
(3): Job J8P3150 Route 160 GREENE County. Bridge rehabilitation over Frisco Highline Trail, the total length of improvement being 0.06 miles.

(1): Job J8O3141 Route 160 CHRISTIAN County. Add lanes from Route 160 to Wilderness Road, the total length of improvement being 616 miles.
(2): Job J8P3051C Route 160 CHRISTIAN, GREENE County. Coldmill and resurface From north of Plainview Road to north of Route 14 in and north of Nixa, the total length of improvement being 4.777 miles.
(3): Job J8P3088B Route 160 CHRISTIAN County. Intersection improvements at Northview Road and at Tracker Road in Nixa, the total length of improvement being 0.36 miles.
(4): Job J8P3091B Route 160 GREENE County. Intersection improvements at Farm Road 157 & Farm Road 192, the total length of improvement being 0.682 miles.   
« Last Edit: June 07, 2019, 12:45:12 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

Revive 755

  • *
  • Offline Offline

  • Posts: 4789
  • Last Login: March 13, 2024, 10:56:10 PM
Re: MODOT Contract Lettings
« Reply #76 on: April 15, 2019, 10:32:23 PM »

(1): Job J9I3125 Route I-55 CAPE GIRARDEAU County. Bridge replacements over Route 61, the total length of improvement being 0.808 miles.
(2): Job J9P3460 Route 61 CAPE GIRARDEAU County. Add interchange for diverging diamond from Old Orchard Road to 0.2 miles south of Veterans Memorial Drive, the total length of improvement being 1.53 miles.

The signing  for the interchange suggests MO 34 is (was?) getting trimmed back to Jackson.
Logged

US71

  • Road Scholar , Master of Snark
  • *
  • Offline Offline

  • Posts: 11846
  • Mad man with a camera

  • Age: 64
  • Location: On the road again
  • Last Login: April 06, 2023, 10:39:02 PM
    • The Road Less Taken
Re: MODOT Contract Lettings
« Reply #77 on: May 02, 2019, 10:42:55 PM »

May 17, 2019 Letting:

Job J1S3055 Route 111 ATCHISON County. Bridge replacement over Mill Creek, 1 mile south of Route Z near Corning, the total length of improvement being 0.265 miles.

This one has been planned for nearly 5 years according to Bridgehunter.
Logged
Like Alice I Try To Believe Three Impossible Things Before Breakfast

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #78 on: May 23, 2019, 11:48:14 AM »

June 4, 2019 Letting:


Notable Projects:
1S3344 Route 111 HOLT County. Pavement improvement from Route 118 to Route 159, the total length of improvement being 4.44 miles.


EDIT: Letting Removed from MODOT site.

June 21, 2019 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Notable Projects:
Job J1I3296 Route I-29 ANDREW, BUCHANAN, HOLT County. Shoulder improvements from Route 59 Interchange at MM 67 to Pigeon Creek bridge, the total length of improvement being 26.994 miles.
Job J1P3250 Route 69,6 DAVIESS, GRUNDY County. Pavement and shoulder repairs starting at I-35 to Trenton, the total length of improvement being 34.475 miles.
Job J4S3287 Route 24 JACKSON County. Bridge replacement 3.6 miles east of I-435, the total length of improvement being 0.104 miles.
Job J4S3392 Route 7 JACKSON County. Pavement improvement from Oakhaven Drive to Rte. 150 South, the total length of improvement being 1.032 miles.
Job J6I3277 Route I-64 ST LOUIS County. Resurface and guardrail improvements west of Ballas to east of Spoede Road, the total length of improvement being 0.604 miles.
Job J6I3415 Route I-70 ST LOUIS CITY County. Bridge deck crack sealing on the Stan Musial Veterans Memorial Bridge, the total length of improvement being 1.22 miles.
Job J6S3276 Route BL 44 ST LOUIS County. Resurface from Neosho Street to E/O Six Flags Road, the total length of improvement being 4.35 miles.
Job J9P3058 Route 72 IRON County. Bridge replacement over Stouts Creek 1.8 miles east of Arcadia, the total length of improvement being 0.264 miles.

The following two sets of projects were let as one project (for each set):
(1): Job J1P3132 Route 24 CHARITON County. Bridge replacement 1.8 miles east of Route 129, east of Salisbury, the total length of improvement being 0.19 miles.
(2): Job J2P2183 Route 24 CHARITON County. Bridge replacement 1.6 miles east of Route 129, east of Salisbury, the total length of improvement being 0.218 miles.


(1): Job J1P3168B Route 129 PUTNAM, SULLIVAN County. scrub seal from Route 136 to Route 6 to Route YY, the total length of improvement being 18.723 miles.
(2): Job J1P3294 Route 6 SULLIVAN County. Scrub seal from Green City to Green Castle, the total length of improvement being 4.14 miles.
« Last Edit: September 13, 2019, 11:20:01 AM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #79 on: June 05, 2019, 04:57:54 PM »

DRAFT Statewide Transportation Improvement Program (DRAFT STIP) for 2020-2024 has been posted online. https://www.modot.org/DRAFTSTIP

Haven't had a chance to look through it really closely yet. As previously expected, the Bella Vista Bypass is listed for a Spring 2020 letting date. :)
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #80 on: August 07, 2019, 03:10:57 PM »

August 16, 2019 Letting: Bid Results. Bid Award Winners

Projects listed in blue font are part of Missouri Focus on Bridges program.

Notable Projects:
Job J1I3099 Route I-29 HOLT County. Bridge deck replacement over Route E and Kimsey Creek, the total length of improvement being 0.351 miles.
Job J1P3114 Route 65 LIVINGSTON County. Bridge rehabilitation over the Grand River 1.3 mi. s/o US 36 near Chillicothe, the total length of improvement being 0.331 miles.
Job J1S3156 Route 190 LIVINGSTON County. Bridge rehabilitation over Thompson River 0.9 mi. e/o Rte. Y near Chillicothe, the total length of improvement being 0.303 miles.
Job J2P3085 Route 79 LINCOLN County. Bridge replacement 0.1 Mile South of Route N near Winfield, the total length of improvement being 0.094 miles.
Job J2S3196 Route JJ MONTGOMERY County. Bridge replacement 1 mile West of Route E near Bellflower, the total length of improvement being 0.0701 miles.
Job J3S3089 Route J RAY County. Bridge deck replacement over Crooked River, the total length of improvement being 0.148 miles.
Job J4I3219 Route I-35 CLAY County. Bridge deck replacement on 128th Street, the total length of improvement being 0.768 miles.
Job J4I3221 Route Hillcrest Rd JACKSON County. Bridge deck replacement over I-470, the total length of improvement being 0.038 miles.
Job J6I3195 Route I-70 ST CHARLES County. Resurface from W/O Wentzville Pkwy to E/O Lake St. Louis Blvd, the total length of improvement being 6.374 miles.
Job J6M0271 Route 67 ST LOUIS County. Barrier wall improvements along the Hi-Collector Road (West of Lindbergh), the total length of improvement being 0.09 miles.
Job J7P3190E Route 13,64 POLK County. Bridge rehabilitation over North Dry Sac River and over Lindley Creek, the total length of improvement being 0.232 miles.
Job J7P3223 Route 37 BARTON, JASPER County. Resurface from Route 126 in Golden City to Route 96 in Avilla, the total length of improvement being 14.699 miles.
Job J9I3658 Route I-57 MISSISSIPPI County. Pavement improvements at County Road 325 south of Charleston, the total length of improvement being 0.077 miles.
Job 9M0279 Route K CAPE GIRARDEAU County. Add turn lanes at Route 25 intersection and Northwest ramp of I-55 interchange , the total length of improvement being 0.406 miles.
Job J5S3289 Route CC CRAWFORD County. Bridge deck replacement over Brush Creek, the total length of improvement being 0.089 miles.

The following two sets of projects were let as one project (for each set):
(1): Job J2P3182 Route 61 MARION County. Bridge rehabilitation over Rte. 24 outer road 1.5 miles north of Rte. 6 near Taylor, the total length of improvement being 0.155 miles.
(2): Job J2P3342 Route 24 MARION County. Bridge rehabilitation on ramp over Rte. 24 1.6 miles north of Rte. 6 at Taylor interchange, the total length of improvement being 0.324 miles.


(1): Job J7P3214 Route 82 BENTON, CEDAR, ST CLAIR County. Resurface from Route 54 in Cedar County to Route 83 in Benton County, the total length of improvement being 37.778 miles.
(2): Job J7S3180 Route WW ST CLAIR County. Resurface from Business 13 to Route V, the total length of improvement being 4.621 miles.
(3): Job J7S3221 Route HH CEDAR, VERNON County. Resurface from Route 54 in Vernon County to Route BB in Cedar County, the total length of improvement being 6.483 miles.
(4): Job J7S3241 Route H ST CLAIR County. Resurface from Route A to Route 82, the total length of improvement being 18.502 miles.
« Last Edit: September 13, 2019, 11:33:50 AM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #81 on: August 29, 2019, 10:25:46 AM »

August 21, 2019 Letting: Bid Results. Bid Award Winners

Notable Projects:
Job J1P3351 Route 41 CARROLL County. Urgent roadway repairs due to flood damage from 1.4 miles south of Route 24 to 1.2 miles north of the Missouri River near DeWitt, the total length of improvement being 0.573 miles.

The following set of projects was let as one project:
(1): Job J1S3342 Route 111 HOLT County. Debris removal from Spur 111, in Craig, to Route 118 intersection near Big Lake, the total length of improvement being 6.196 miles.
(2): Job J1S3343 Route 111 HOLT County. Pavement repair from Spur 111, in Craig, to Route 118 intersection near Big Lake, the total length of improvement being 6.196 miles.
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #82 on: August 29, 2019, 10:38:44 AM »

September 20, 2019 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Projects:
Job J1S3134 Route YY WORTH County. Bridge replacement over the Middle Fork Grand River, 0.5 mile north of Rte. W near Gentry, the total length of improvement being 0.106 miles.
Job J1S3137 Route A DEKALB County. Bridge replacement over North Fork Lost Creek, 1.6 miles south of Route Z near Maysville, the total length of improvement being 0.261 miles.
Job J1S3129 Route 116 BUCHANAN County. Bridge replacement 3 miles south of Faucett on I-29, the total length of improvement being 0.249 miles.
Job J4P3295B Route Various JACKSON County. Sign installation at various ramps in Jackson County, the total length of improvement being 0 miles.
Job J5I3424 Route I-44 CRAWFORD, LACLEDE, PHELPS, PULASKI County. Pavement repair across entire Pulaski/Phelps/Crawford and a section in Laclede County, the total length of improvement being 167.975 miles.
Job J5S3238 Route Z HOWARD County. Bridge replacement 2.48 miles west of Route 87, the total length of improvement being 0.053 miles.
Job J5S3249 Route HH BOONE County. Bridge redeck over Hinkson Creek, the total length of improvement being 0.169 miles.
Job J6M0277 Route I-70 ST LOUIS County. Coldmill and resurface 2 disconnected sections on Mark Twain Drive (I-70 SOR). East of McKelvey and West of Rte. 180, the total length of improvement being 1.058 miles.
Job J6S3327 Route 115 ST LOUIS County. Bridge rehabilitation over Metrolink Railroad Tracks, the total length of improvement being 0.05 miles.
Job J6S3395 Route Various JEFFERSON County. Sign installation in various locations throughout Jefferson County, the total length of improvement being 0 miles.
Job J4S2276 Route 18 HENRY County. Bridge rehabilitation over Grand River, the total length of improvement being 1.22 miles.
Job J7P3255 Route 7 HENRY County. Coldmill and resurface from 0.3 miles east of Route 13 to Route PP in Tightwad, the total length of improvement being 13.886 miles.
Job J7S3172 Route U JASPER County. Bridge redeck on Route U 0.6 miles north of La Russell, the total length of improvement being 0.118 miles.
Job J8I0445 Route I-44 WEBSTER County. New interchange and roadway at miles marker 103, 0.7 miles northeast of Marshfield, the total length of improvement being 3.758 miles.
Job J9M0277 Route I-55 SCOTT County. Tree clearing from Fruitland Exit 105 to Benton Exit 80, the total length of improvement being 24.78 miles.
Job J0I3005T Route Various STE GENEVIEVE County. Job order contract for asphalt repair from Jefferson County line to Arkansas State line on I-55; all of I-57 and all of I-155, the total length of improvement being 0 miles.
Job J9P3411 Route 32 IRON County. Pavement improvements from Route KK to Route 21, the total length of improvement being 27.317 miles.

The following nine sets of projects were let as one project (for each set):
(1): Job J1S3070 Route T HOLT County. Bridge rehabilitation over Spring Creek, 0.5 mile south of Rte. O near Oregon, the total length of improvement being 0.037 miles.
(2): Job J1S3071 Route T HOLT County. Bridge rehabilitation over Easter Creek, 0.8 mile north of Rte. U near Oregon, the total length of improvement being 0.05 miles.
(3): Job J1S3162 Route H HOLT County. Bridge rehabilitation over Nichols Creek, 0.3 mile east of Rte. B, near Oregon, the total length of improvement being 0.04 miles.
(4): Job J1S3204 Route U ATCHISON County. Bridge rehabilitation 1.3 miles south of Rte. 136 near Phelps City, the total length of improvement being 0.048 miles.


(1): Job J2P3144 Route 24 MONROE County. Resurface from 1.1 miles west of Rte. U to the Rte. 36 interchange at Monroe City, the total length of improvement being 18.697 miles.
(2): Job J2P3183 Route 24 MONROE County. Bridge rehabilitation over Middle Fork Salt River 1.0 miles west of Route 15 near Paris, the total length of improvement being 0.22 miles.
(3): Job J2P3282 Route 24 MONROE County. Resurface from Randolph County line to 1.1 miles west of Route U near Paris, the total length of improvement being 20.1 miles.

(1): Job J2S3172 Route C MACON County. Pavement improvements and ADA improvements in Bevier, the total length of improvement being 0.519 miles.
(2): Job J2S3223 Route 149 MACON County. ADA improvements from Trailer Court Lane to Delmar Place in New Cambria, the total length of improvement being 0.488 miles.

(1): Job J5S3262 Route D CAMDEN County. Bridge rehabilitation over Minnow Brook Creek, the total length of improvement being 0.11 miles.
(2): Job J5S3263 Route C MILLER County. Bridge rehabilitation over Deane Creek, the total length of improvement being 0.113 miles.


(1): Job J7P3187H Route CC WEBSTER County. Intersection improvements on Hubble Drive at Banning Street in Marshfield, the total length of improvement being 0.204 miles.
(2): Job J7S3348 Route CC WEBSTER County. Resurface from Rifle Range Road to Route 38 in Marshfield, the total length of improvement being 2.675 miles.

(1): Job J7S3217 Route Z DOUGLAS, WEBSTER County. Resurface from US 60 to Route 14, the total length of improvement being 11.855 miles.
(2): Job J7S3218 Route KK WEBSTER County. Resurface from Route A to Route B, the total length of improvement being 13.64 miles.
(3): Job J7S3219 Route D GREENE, WEBSTER County. Resurface from Route 125 to Route B, the total length of improvement being 4.125 miles.

(1): Job J7S3224 Route H JASPER County. Resurface from Route 171 to I-49 at Jasper, the total length of improvement being 17.875 miles.
(2): Job J7S3225 Route M JASPER County. Resurface from Route 43 to I-49, the total length of improvement being 9.795 miles.
(3): Job J7S3226 Route MM JASPER County. Resurface from Route 96 to Route D in Oronogo, the total length of improvement being 1.647 miles.
(4): Job J7S3231 Route CC NEWTON County. Resurface from Route 86 near Racine to Route 60, the total length of improvement being 4.587 miles.

(1): Job J8S3114 Route 413 GREENE County. Coldmill and resurface from Route 360 to Route 13 in Springfield, the total length of improvement being 4.986 miles.
(2): Job J8S3121 Route FF GREENE County. Coldmill and resurface from US 60 to south of Weaver Road, the total length of improvement being 1.763 miles.

(1): Job J9P3413 Route 19 SHANNON County. Resurface from Route A to Riverview Drive, the total length of improvement being 18.372 miles.
(2): Job J9P3446 Route 32 TEXAS County. Resurface from Route 17 to Route 63, the total length of improvement being 16.354 miles.

Edit: Added September 27 Letting
September 27, 2019 Letting: Bid Results. Bid Award Winners.

Job J1S3349 Route CC Atchison County. Culvert Replacement, the total length of improvement being 0.028 miles.
« Last Edit: October 02, 2019, 05:09:13 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #83 on: August 29, 2019, 12:52:11 PM »

https://ksisradio.com/modot-to-receive-over-20m-grant-to-replace-bridges/

Quote
MoDOT is set to receive over $20-million in federal grant money to assist in replacing 40 bridges in rural northern Missouri.

Governor Mike Parson's office says MoDOT will be able to replace 40 bridges in the northern part of the state as a result of an announcement by Congressman Sam Graves, in which Missouri has received a $20.7 million federal grant through the U.S. Department of Transportation’s Competitive Highway Bridge Program.

Parson's office says the bridges, all located north of I-70, are in poor condition, weight-restricted, supported by timber pile, and one-lane wide but carry two-way traffic. In addition to removing current detours and preventing future ones, the grant will help increase safety on the state’s rural roads and reduce costs associated with maintaining the bridges.

"Missouri's infrastructure, specifically bridge infrastructure, has been a key focus for our administration since day one. This grant continues the momentum we’ve gained in recent months to invest in infrastructure improvements," Governor Parson said. "Missouri’s farm-to-market roads are critical connections to Missouri’s highways, railways, and waterways, allowing our farmers to compete in the global marketplace. The bridges that will be replaced as a result of this grant would have posed obstacles to that connectivity had they been further weight restricted or closed."

“When this project is complete, there will be no bridges remaining in northern Missouri that meet those criteria,”  State Bridge Engineer Dennis Heckman said. He said the bridges, on average, are 77 years old and deteriorating rapidly.

Only 25 states were eligible to apply for the $225 million in the Competitive Highway Bridge Program — those with a population density of 100 or less per square mile, according to a press release from Parson's office. The grant also required that bridges be bundled in a single contract.

MoDOT intends to pursue a design-build contract to deliver this project.

The Competitive Highway Bridge Program grant comes on the heels of an $81.2 million Infrastructure for Rebuilding America (INFRA) grant from the U.S. Department of Transportation to build a new I-70 Missouri River Bridge at Rocheport.

Receipt of the INFRA grant will also trigger $301 million in state bonding, authorized by the Missouri General Assembly during the 2019 legislative session, that will repair or replace another 215 bridges across the state.

“We are poised to deliver these bridge improvement projects as quickly, efficiently, and innovatively as possible,”  MoDOT Director Patrick McKenna said. “We are grateful to Congressman Graves, Governor Parson, and Missouri legislators for their support of additional investment in transportation in Missouri.”

Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #84 on: September 13, 2019, 10:59:56 AM »

October 18, 2019 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Projects:
Job J1P1043 Route 116 CLINTON County. Resurface from just east of the City of Plattsburg to just west of Route 33 and Route A in the City of Lathrop, the total length of improvement being 6.11 miles.
Job J1P3144 Route 6 GRUNDY County. Resurface and ADA improvements from 4th street to Muddy Creek, the total length of improvement being 1.728 miles.
Job J1P3165 Route 36 CALDWELL County. Coldmill and resurface from the intersection of Route 13 and Route 36 at Hamilton to Livingston Co. line, the total length of improvement being 13.128 miles.
Job J1S3172 Route 46 NODAWAY, WORTH County. Resurface and shoulder improvements from Route 136 near Ravenwood to Route 169 in Grant City, the total length of improvement being 24.112 miles.
Job J1S3227 Route 129 PUTNAM County. Resurface from the Iowa state line to Route 136 near Unionville, the total length of improvement being 11.048 miles.
Job J2S3178 Route 94 MONTGOMERY, WARREN County. Resurface from Route 19 to Route 47 north junction in Warren County near Marthasville, the total length of improvement being 26 miles.
Job J3S3160 Route W JOHNSON County. Resurface from Route 50 to Route 58, the total length of improvement being 8.828 miles.
Job J4S3210 Route 7 JACKSON County. Coldmill, resurface, ADA improvements and signal improvements from Victor Drive to Wyatt Road in Blue Springs, the total length of improvement being 2.689 miles.
Job J5M0290 Route Various BOONE, CALLAWAY County. Resurface segments of I-70 Outer Roads from 2 miles West of Route 740 in Boone County to Route 54 in Callaway County; Route FF in Callaway County; and Route N in Callaway County from Route B to the Audrain County Line, the total length of improvement being 29.45 miles.
Job J5P3181 Route 54 MILLER County. Grading, pavement and 2 bridges at the Route 54, BR 54, and Osage Hills Road intersection near Lake Ozark, the total length of improvement being 0.805 miles.
Job J5P3241 Route 49 CRAWFORD County. Bridge replacement west of Cherryville over Dry Fork Creek, the total length of improvement being 0.207 miles.
Job J5S3234 Route D CALLAWAY County. Bridge replacement 0.12 Miles South of Outer Road 40 and over I-70 in Williamsburg, Callaway County, the total length of improvement being 0.226 miles.
Job J5S3288 Route CC MONITEAU County. Bridge replacement and Bridge Deck Replacement 0.3 miles and 3.0 miles north of Route C, the total length of improvement being 0.196 miles.
Job J5S3245 Route BB CALLAWAY County. Resurface from Route 54 south to Route AA, the total length of improvement being 12.537 miles.
Job J6I3257 Route I-70 ST LOUIS CITY County. Resurface from Kingshighway Blvd to Branch Street, the total length of improvement being 3.626 miles.
Job J6Q3172E Route Various VARIOUS County. ITS improvement throughout the St. Louis District, the total length of improvement being 0 miles.
Job J6S1908 Route 30 JEFFERSON County. Bridge removals and box culvert replacement on Route 30 over Saline Creek, under Gravois Road and at Valley Deli Road, the total length of improvement being 0.476 miles.
Job J6S3229 Route 180 ST LOUIS CITY County. Coldmill and resurface on Dr. Martin Luther King Drive from St. Louis City limits to Route D, the total length of improvement being 3.951 miles.
Job J6S3396 Route I-70 SOR ST CHARLES County. Resurface from Route T to Wentzville Parkway, the total length of improvement being 4.585 miles.
Job J7S3369 Route Various BENTON County. Bridge rehabilitations at various locations in Benton county, the total length of improvement being 0.218 miles.
Job J9P3585 Route 51 PERRY County. Bridge rehabilitation over Mississippi River on Chester Bridge, the total length of improvement being 0.299 miles.
Job J9S3384 Route 38 WRIGHT County. Bridge replacement over Evening Shade Creek., the total length of improvement being 0.077 miles.

The following seven sets of projects were let as one project (for each set):
(1): Job J2P3202 Route 15 AUDRAIN, MONROE County. Seal coat from Route D to 1.1 Miles North of Route 22 near Mexico in Audrain County, the total length of improvement being 18.325 miles.
(2): Job J2P3345 Route 15 MONROE County. Resurface from Route 154 North Junction to Route D near Paris, the total length of improvement being 6.011 miles.
(3): Job J2S3289 Route KK AUDRAIN County. Seal coat from Route B to Route 54 near Laddonia, the total length of improvement being 4.07 miles.
(4): Job J2S3297 Route 151 AUDRAIN, BOONE, MONROE, SHELBY County. Seal coat from 0.3 Mile North of Rout3 36 to Route 22 near Centralia, the total length of improvement being 44.938 miles.

(1): Job J5S3278 Route 19 CRAWFORD, DENT County. Seal coat from Route 68 to Route 49, the total length of improvement being 23.506 miles.
(2): Job J5S3383 Route Various DENT, PHELPS County. Seal coat at various routes in Phelps and Dent counties, the total length of improvement being 79.491 miles.

(1): Job J5S3279 Route T MARIES, OSAGE County. Resurface and ADA improvements from Route 63 to Route 42, the total length of improvement being 17.38 miles.
(2): Job J5S3392 Route P OSAGE County. Resurface from Route 133 to Route 63, the total length of improvement being 13.94 miles.

(1): Job J7P3422 Route Various VARIOUS County. Sign improvements at various interchange locations in the rural Southwest District, the total length of improvement being 15.215 miles.
(2): Job J8O2373C Route Various STONE, TANEY County. Sign improvements on Routes 76, 376, 465, and 65 near Branson, the total length of improvement being 36.855 miles.
(3): Job J8P3069B Route 65, 360, & 60 CHRISTIAN, GREENE County. Sign improvements at various ramp locations from 0.8 mile north of I-44 to Rte. F, on Rte. 60 from Rte. 125 to W County Line Road, and on Rte. 360 from west of Rte. MM to east of Rte. 413, the total length of improvement being 6.475 miles.

(1): Job J7S3230 Route BB BENTON County. Resurface from Route 65 to end of state maintenance, the total length of improvement being 8.768 miles.
(2): Job J7S3232 Route M BENTON County. Resurface from beginning of state maintenance to Route 7, the total length of improvement being 10.215 miles.
(3): Job J7S3408 Route B BENTON County. Resurface from Route 52 in Cole Camp to end of state maintenance, the total length of improvement being 15.886 miles.

(1): Job J9S3397 Route Z STE GENEVIEVE County. Resurface and Bridge Rehabilitation from Route N to Route 61, the total length of improvement being 4.144 miles.
(2): Job J9S3400 Route A CAPE GIRARDEAU County. Resurface from Route U to Route 25 near Dutchtown, the total length of improvement being 10.688 miles.

(1): Job J9S3518 Route H ST FRANCOIS County. Add shoulders and rumble stripes from Old Fredericktown Road to Route AA, the total length of improvement being 3.927 miles.
(2): Job J9S3519 Route B PERRY County. Add shoulders and rumble stripes from 0.25 miles south of National Guard Drive to I-55, the total length of improvement being 6.386 miles.
(3): Job J9S3527 Route K ST FRANCOIS County. Add shoulders and rumble stripes from Point View Drive to Route D, the total length of improvement being 6.76 miles.
(4): Job J9S3554 Route NN ST FRANCOIS County. Add shoulders and rumble stripes from Route N to MO 221, the total length of improvement being 4.319 miles.
(5): Job J9S3555 Route AA ST FRANCOIS County. Add shoulders and rumble stripes from Route H to Pendelton Road, the total length of improvement being 5.195 miles.
(6): Job J9S3594 Route B PERRY County. Add shoulders and rumble stripes From I-55 to the Perry County Line, the total length of improvement being 2.746 miles.

EDIT: Additional Lettings added.
(1): Job J1P3239 Route 6 SULLIVAN County. Pavement, drainage and ADA improvements within the city limits of Green Castle, the total length of improvement being 0.551 miles.
(2): Job J1S3243 Route D, FF SULLIVAN County. Pavement, drainage and ADA Improvements within the city limits of Green Castle, the total length of improvement being 0.687 miles.

(1): Job J7I3201 Route I-44 GREENE County. Coldmill and resurface just east of Route 360 interchange, the total length of improvement being 17.656 miles.
(2): Job J8I3120 Route I-44 GREENE County. Resurface just east of Route 360 interchange to west of Route 266 interchange, the total length of improvement being 5.393 miles.

(1): Job J7I3083 Route I-49 BARTON, JASPER County. Coldmill and resurface from s/o Route 160 to I-44, the total length of improvement being 29.305 miles. 
« Last Edit: November 06, 2019, 10:57:16 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #85 on: September 13, 2019, 11:13:14 AM »

When Missouri received INFRA grant for the I-70 Rocheport bridge, it triggered a 301 million dollar grant to fix bridges around the state.

https://www.modot.org/focus-bridges
Quote

Missouri has 10,384 bridges — the sixth most in the nation. More than 900 of those bridges are in poor condition and 1,131 are weight restricted. Four hundred and thirteen bridges fall into both categories.

Gov. Mike Parson recognized the need for additional funding for infrastructure projects in our state and in January 2019 put forth a proposal to repair or replace hundreds of the state’s worst bridges.

As passed by the 2019 General Assembly and signed by the Governor, $50 million was appropriated from State General Revenue to replace or repair 45 bridges in Fiscal Year 2020. In July, MoDOT received an $81.2 million INFRA Grant from the U.S. Department of Transportation that will facilitate the construction of a new I-70 Missouri River Bridge at Rocheport and I-70 climbing lanes at Mineola Hill in Montgomery County - two significant improvements to the I-70 freight corridor. The grant will also trigger a $301 million bonding program, authorized by the legislature in the 2019 session and to be repaid over seven years from State General Revenue, that will repair or replace an additional 215 bridges across the state - freeing up $301 million from the current Statewide Transportation Improvement Program for new transportation improvement projects

Not only will this program enable us to fix hundreds of poor bridges throughout the state, it will also enable us to deliver additional high-priority transportation projects statewide using the funding already dedicated to these bridges in our current construction program and for which our nationally recognized local planning process will be used.

Going forward, I will try to highlight the bridge projects that are a part of the Focus on Bridges program. I will go back to some of the previous listings this year and highlight those projects as well. The list of bridges being replaced are located at: https://www.modot.org/sites/default/files/documents/STIP%20Bridges%202020-2023%20trimmed%20down_update_1.pdf
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #86 on: October 10, 2019, 03:55:37 PM »

November 15, 2019 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J1I0914 Route I-35 DAVIESS, HARRISON County. Resurface from Route 136 to Route C, the total length of improvement being 13.727 miles.
Job J1I3018 Route I-35 CLINTON County. Coldmill and resurface from north of Route 116 to Clay County line near Holt, the total length of improvement being 8.765 miles.
Job J1I3016 Route I-35 CLINTON County. Coldmill and resurface from DeKalb County line to Shoal Creek near Cameron, the total length of improvement being 4.952 miles.

(1): Job J1I3109 Route I-29 ANDREW County. Bridge replacement over Hopkins Creek, 0.2 mile south of Rte. T near Amazonia, the total length of improvement being 1.101 miles.
(2): Job J1I3241 Route I-29 ANDREW County. Bridge rehabilitation on bridge over Route T, near Amazonia, the total length of improvement being 1.101 miles.


Job J1I3183 Route I-29 BUCHANAN County. Resurface 1.5 miles south of Rte. O (just south of pigeon creek) to platte county line, the total length of improvement being 8.535 miles.
Job J1P3072 Route 6 BUCHANAN, DEKALB County. Resurface and shoulder repairs 0.13 Miles East of route AC to the intersection of Route 6 & Route 31, the total length of improvement being 10.596 miles.

(1): Job J2P3246 Route 6 ADAIR, KNOX County. Resurface from 0.2 mile east of Route 63 to Route 15 south junction in Knox County near Edina, the total length of improvement being 19.99 miles.
(2): Job J2P3292 Route 6 ADAIR County. Seal coat from east of Route 149 at the Chariton River to Bus. 63 in Kirksville, the total length of improvement being 5.889 miles.
(3): Job J2S3288 Route 3 ADAIR, MACON County. Seal coat from east Route 11 in Adair County to Route 156 in Macon County near Cardy, the total length of improvement being 8.809 miles.
(4): Job J2S3298 Route H ADAIR County. Seal coat from La Harpe Street to Route 11 in Kirksville, the total length of improvement being 2.305 miles.
(5): Job J2S3299 Route 11 ADAIR, KNOX, LINN, SULLIVAN County. Seal coat from Rte. 15 near Baring to Rte. 129 in Linn County (two disconnected sections), the total length of improvement being 41.136 miles.
(6): Job J2S3343 Route P ADAIR County. Seal coat from Bus. 63 to Route 63 in Kirksville, the total length of improvement being 0.96 miles.

(1): Job J2S3188 Route 16 LEWIS County. Seal coat from Route 6 to Route B in Canton, the total length of improvement being 15.417 miles.
(2): Job J2S3290 Route K LEWIS County. Seal coat from Route E to Route 6 in LaBelle, the total length of improvement being 8.131 miles.
(3): Job J2S3291 Route C LEWIS County. Seal coat from Route 6 in Ewing to Route B in LaGrange, the total length of improvement being 14.281 miles.

(1): Job J3P3085C Route 210 RAY County. Intersection improvements at Route O and Route Z, the total length of improvement being 0.371 miles.
(2): Job J3P3085D Route 10, 210 RAY County. Intersection improvements at Route 10 and Route 210, the total length of improvement being 0.282 miles.
(3): Job J3P3143 Route 210 RAY County. Intersection improvements at Henkel Dr. east of Route T, the total length of improvement being 0.271 miles.

(1): Job J4I3125 Route I-70 JACKSON County. Coldmill, resurface, and ADA improvements from the Kansas State line to Manchester Trafficway, the total length of improvement being 5.615 miles.
(2): Job J4I3127 Route I-29 JACKSON County. Coldmill and resurface from South of Guinotte Avenue to the Downtown Loop, the total length of improvement being 0.672 miles.

Job J4I3217 Route 140th JACKSON County. Bridge replacement over I-49, the total length of improvement being 0.051 miles.

(1): Job J4P3355 Route K PLATTE County. Resurface from Route 152 to Route 45, the total length of improvement being 1.942 miles.
(2): Job J4S3354 Route U PLATTE County. Resurface from Route 371 to I-29, the total length of improvement being 0.849 miles.
(3): Job J4S3358 Route JJ PLATTE County. Resurface from e/o Cherry to Route 45, the total length of improvement being 2.003 miles.
(4): Job J4S3363 Route Y PLATTE County. Resurface from Buchanan County line to Route Z, the total length of improvement being 0.797 miles.
(5): Job J4S3368 Route H PLATTE County. Resurface from Route 371 to Route 45, the total length of improvement being 10.364 miles.
(6): Job J4S3370 Route H PLATTE County. Resurface from Route 371 North to I-29, the total length of improvement being 0.687 miles.
(7): Job J4S3371 Route P PLATTE County. Resurface from Route H to Route 45, the total length of improvement being 7.25 miles.

(1): Job J5P3237 Route 135 COOPER, PETTIS County. Resurface from I-70 to Highway 50, the total length of improvement being 26.138 miles.
(2): Job J5S3389 Route 98 COOPER County. Resurface from Route 87 to State Maint. Ends, the total length of improvement being 8.376 miles.

(1): Job J5P3121 Route 54 COLE County. Coldmill and resurface from Route E near Brazito to near Stadium Blvd. in Jefferson City, the total length of improvement being 11.076 miles.
(2): Job J5P3128 Route 54 COLE County. Coldmill and resurface from Miller County to Route E near Brazito, the total length of improvement being 14.127 miles.
(3): Job J5P3371 Route 54 COLE, MILLER County. Guard cable installation from route aa in miller county to near stadium boulevard in jefferson city, the total length of improvement being 18.708 miles.

Job J5P3291 Route various DALLAS, LACLEDE County. Seal coat and box culvert replacement west of Lebanon, the total length of improvement being 25.089 miles.
Job J5S3230 Route E, M COLE County. Resurface, add shoulder and ADA improvements from Route 54 to Route B and Route M from Route W to Route 50, the total length of improvement being 13.641 miles.
Job J5S3232 Route M, B, 124 BOONE County. Resurface and ADA improvements just west of Route 63 to Route DD and includes Route B and Route 124 in Hallsville, the total length of improvement being 2.284 miles.

(1): Job J5S3266 Route W MORGAN County. Resurface and add shoulders from Versailles city limit to Route Y, the total length of improvement being 13.057 miles.
(2): Job J5S3327 Route J MORGAN County. Resurface from Route 5 to SME, the total length of improvement being 7.965 miles.

Job J5M0289 Route Y HOWARD County. Resurface from Route 124 to State Maint. Ends, the total length of improvement being 7.501 miles.

Job J5L20BEN Route Various DALLAS, LACLEDE County. Seal coat in Bennett Spring State Park west of Lebanon, the total length of improvement being 7.584 miles.
Job J6I3295 Route I-44, BL44 FRANKLIN County. Microsurface from the St. Louis County line to Route 30 and on Loop 44 from Neosho Street to Route 100, the total length of improvement being 23.791 miles.
Job J6S3306 Route P ST CHARLES County. Resurface and guardrail improvements from Rte 61 in Flint Hill to Rte M in O'Fallon, the total length of improvement being 9.911 miles.
Job J6S3431 Route Various ST CHARLES County. Bridge rehabilitation on Route 94 at Sehrt Creek, Route at Little Dardenne Creek, Route K at Schote Creek, Route K at Dardenne Creek and Route 370 at Cole Creek, the total length of improvement being 0.332 miles.
Job J7P3211 Route 65 BENTON County. Coldmill and resurface from south of Route 52 to the Osage River in Warsaw, the total length of improvement being 31.749 miles.

(1): Job J7S3220 Route 123 POLK County. Resurface from Route 32 to Route 215 south intersection, the total length of improvement being 12.158 miles.
(2): Job J7S3222 Route H DADE County. Resurface from Route Y to Route 160, the total length of improvement being 9.175 miles.
(3): Job J7S3267 Route 215 DADE County. Resurface from Rte. Y in Dade County to Rte. 123 in Polk County, the total length of improvement being 9.682 miles.

(1): Job J7S3227 Route B HENRY, JOHNSON County. Resurface from Route 2 to Route 7, the total length of improvement being 11.42 miles.
(2): Job J7S3228 Route K HENRY County. Resurface from Route 7 in Urich to Route 52 in Montrose, the total length of improvement being 17.036 miles.
(3): Job J7S3229 Route AA HENRY County. Resurface from Route 7 to end of state maintenance, the total length of improvement being 1.991 miles.
(4): Job J7S3409 Route H BATES, HENRY County. Resurface from Loop 49 intersection in Butler to Route K intersection near Montrose, the total length of improvement being 18.089 miles.

Job J7S3404 Route Various VARIOUS County. Seal coat in the west portion of the Southwest District, the total length of improvement being 64.183 miles.
Job J8P3067C Route Various GREENE County. Bridge rehabilitation on and over James River Freeway, the total length of improvement being 0.541 miles.

(1): Job J9S3226 Route D NEW MADRID County. Bridge replacement over drainage ditches 40 and 3, the total length of improvement being 0.074 miles.
(2): Job J9S3330 Route D NEW MADRID County. Bridge replacement over drainage ditches 43 and 2, the total length of improvement being 0.129 miles.

(1): Job J9S3327 Route 61 NEW MADRID County. Bridge replacement between Conran and Portageville, the total length of improvement being 0.07 miles.
(2): Job J9S3328 Route ZZ NEW MADRID County. Bridge replacement 5 miles west of Conran, the total length of improvement being 0.013 miles.


(1): Job J9S3346 Route F STODDARD County. Resurface from Route J to Route 60, the total length of improvement being 6.641 miles.
(2): Job J9S3360 Route CC BUTLER County. Resurface from Route 51 to Route 53, the total length of improvement being 10.664 miles.
(3): Job J9S3362 Route JJ BUTLER County. Resurface from end of maintenance to Route 67, the total length of improvement being 3.162 miles.
(4): Job J9S3398 Route WW STODDARD County. Resurface from Route J to Route 60, the total length of improvement being 8.625 miles.
(5): Job J9S3420 Route A RIPLEY County. Resurface from Route 21 to Arkansas State line, the total length of improvement being 7.893 miles.
(6): Job J9S3421 Route E RIPLEY County. Resurface from Route 142 to end of state maintenance, the total length of improvement being 6.639 miles.
(7): Job J9S3437 Route H DUNKLIN, STODDARD County. Resurface from Route 25 to Route J, the total length of improvement being 17.697 miles.
« Last Edit: December 04, 2019, 06:34:41 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #87 on: November 06, 2019, 12:47:04 PM »

https://ksisradio.com/modot-to-receive-over-20m-grant-to-replace-bridges/

Quote
MoDOT is set to receive over $20-million in federal grant money to assist in replacing 40 bridges in rural northern Missouri.

Governor Mike Parson's office says MoDOT will be able to replace 40 bridges in the northern part of the state as a result of an announcement by Congressman Sam Graves, in which Missouri has received a $20.7 million federal grant through the U.S. Department of Transportation’s Competitive Highway Bridge Program.

Parson's office says the bridges, all located north of I-70, are in poor condition, weight-restricted, supported by timber pile, and one-lane wide but carry two-way traffic. In addition to removing current detours and preventing future ones, the grant will help increase safety on the state’s rural roads and reduce costs associated with maintaining the bridges.

"Missouri's infrastructure, specifically bridge infrastructure, has been a key focus for our administration since day one. This grant continues the momentum we’ve gained in recent months to invest in infrastructure improvements," Governor Parson said. "Missouri’s farm-to-market roads are critical connections to Missouri’s highways, railways, and waterways, allowing our farmers to compete in the global marketplace. The bridges that will be replaced as a result of this grant would have posed obstacles to that connectivity had they been further weight restricted or closed."

“When this project is complete, there will be no bridges remaining in northern Missouri that meet those criteria,”  State Bridge Engineer Dennis Heckman said. He said the bridges, on average, are 77 years old and deteriorating rapidly.

Only 25 states were eligible to apply for the $225 million in the Competitive Highway Bridge Program — those with a population density of 100 or less per square mile, according to a press release from Parson's office. The grant also required that bridges be bundled in a single contract.

MoDOT intends to pursue a design-build contract to deliver this project.

The Competitive Highway Bridge Program grant comes on the heels of an $81.2 million Infrastructure for Rebuilding America (INFRA) grant from the U.S. Department of Transportation to build a new I-70 Missouri River Bridge at Rocheport.

Receipt of the INFRA grant will also trigger $301 million in state bonding, authorized by the Missouri General Assembly during the 2019 legislative session, that will repair or replace another 215 bridges across the state.

“We are poised to deliver these bridge improvement projects as quickly, efficiently, and innovatively as possible,”  MoDOT Director Patrick McKenna said. “We are grateful to Congressman Graves, Governor Parson, and Missouri legislators for their support of additional investment in transportation in Missouri.”


I found the grant application for these bridges. The bridges that will be replaced are listed on page 6 of the pdf.
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #88 on: November 07, 2019, 12:46:27 PM »

https://www.bizjournals.com/stlouis/news/2019/11/06/modot-to-revamp-i-270-in-north-county-with-278m.html

Quote
The Missouri Department of Transportation has announced a $278 million project to revamp Interstate 270 in north St. Louis County.

The project will improve safety and reliability along I-270 from Interstate 70 on the west to the western part of Riverview Drive, according to a release. The Missouri Highways and Transportation Commission on Wednesday selected Millstone Weber as the design-build contractor for the project, which is expected to begin in spring 2020 and be completed by December 1, 2023.

MoDOT and Millstone Weber will collaborate over the next few months to plan their approach. Expected improvements include: 

    Reconstruct interchanges at U.S. Route 67 (Lindbergh), Hanley/Graham roads, New Florissant Road, Washington Street/Elizabeth Avenue, West Florissant Avenue, New Halls Ferry Road, Old Halls Ferry Road and Route 367
    Additional lane of pavement on I-270 in both directions from U.S. Route 67 (Lindbergh) to Route 367
    Improve accessibility for bicycles and pedestrians with shared use paths from Lindbergh to Breezy Point Lane along Dunn Road, and from Hanley/Graham roads to Old Halls Ferry Road along Pershall Road
    Improve safety with an updated outer road system that includes outer road conversions and removal of crossover slip ramps

“Seeing this project come to fruition is great progress for the community, the region and the entire state of Missouri,”  said MoDOT Director Patrick McKenna. “The I-270 North Project is MoDOT’s largest single project in the last decade. It will replace aging infrastructure, enhance safety and resiliency of the system and improve mobility for freight and passengers, all while creating an economic boost for nearby communities. MoDOT’s design-build model to scale the scope of work to match existing resources has worked well for us, and I believe it will with this project, too."

The project is in response to safety concerns along the interstate. MoDOT said both directions of I-270 have higher than average rates of severe crashes in addition to higher-than-average crash rates, with eastbound I-270 showing an average crash rate 30% higher than the statewide average for interstates.

Also, the interstate is heavily used and is one of the heaviest traveled interstates in Missouri. About 140,000 vehicles, of which 18% are heavy trucks, travel it daily, MoDOT said.

The Millstone Weber team includes Parsons Transportation Group, Horner and Shifrin, CBB, Terracon, Pace Construction and Excel Business Concepts.
« Last Edit: November 07, 2019, 12:48:54 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

Revive 755

  • *
  • Offline Offline

  • Posts: 4789
  • Last Login: March 13, 2024, 10:56:10 PM
Re: MODOT Contract Lettings
« Reply #89 on: November 07, 2019, 11:00:54 PM »

^ MoDOT's website has one image for the proposed redesign of the US 67 interchange, and one for the MO 367 interchange.

The best way I can think of at the moment to describe the US 67 interchange is a volleyball without one of the free-flow levels.  Looks like the eastbound to northbound will feature a triple left.

I am not sure whether it's not in the picture or if the rebuild of the MO 367 interchange gets rid of the SB to EB movement entirely.
Logged

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #91 on: November 08, 2019, 11:53:27 AM »

December 13, 2019 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

(1): Job J1S0447 Route 46 NODAWAY County. Bridge replacement over Florida Creek, 0.7 mile west of Rte. AB near Maryville, the total length of improvement being 0.076 miles.
(2): Job J1S0616 Route 46 NODAWAY County. Bridge replacement over White Cloud Creek, 2.3 miles east of Rte. AB near Maryville, the total length of improvement being 0.123 miles.
(3): Job J1S3138 Route 46 NODAWAY County. Bridge replacement over Stream, 0.8 mile west of Rte. AB near Maryville, the total length of improvement being 0.088 miles.
(4): Job J1S3139 Route 46 NODAWAY County. Bridge replacement over Big Slough Creek, 3.2 miles east of Rte. AB near Maryville, the total length of improvement being 0.135 miles.


(1): Job J1S3171 Route DD ANDREW County. Resurface from Route T in Savannah to Route 59 in Country Club Village, the total length of improvement being 7.605 miles.
(2): Job J1S3196 Route E BUCHANAN County. Resurface Route 169 to Route 116 near Gower, the total length of improvement being 8.561 miles.
(3): Job J1S3197 Route H BUCHANAN County. Resurface from Route 371 near Faucett to Route 169 in Gower, the total length of improvement being 13.789 miles.

(1): Job J1S3249 Route BUS 169 BUCHANAN County. Resurface from I29 to Mitchell Avenue in Saint Joseph and includes Rte. 6 from the Belt Highway to I29, the total length of improvement being 4.956 miles.
(2): Job J1S3257 Route BUS 169 BUCHANAN County. Resurface from Mitchell Avenue to Rte. FF in St. Joseph, the total length of improvement being 3.146 miles.

Job J1S3350 Route N SULLIVAN County. Culvert replacement 0.02 mile west of Route B, near Green City, the total length of improvement being 0.019 miles.

(1): Job J2P3130 Route 61 MARION County. Resurface from 0.6 Miles South of Route F to 0.4 Miles North of Route 168 near Hannibal, the total length of improvement being 11.451 miles.
(2): Job J2P3168 Route 24 MARION County. Resurface from Route 61 to 0.5 Mile North of Route 36 near Hannibal, the total length of improvement being 4.419 miles.
(3): Job J2P3173 Route 24, 61 MARION County. Intersection improvements at Route 61, 24, and F intersection near Palmyra, the total length of improvement being 0.405 miles.

Job J2P3153 Route 19 AUDRAIN County. Resurface from 0.2 mile north of Route J to 0.1 mile south of Route BB near Laddonia, the total length of improvement being 8.099 miles.

(1): Job J2P3175 Route 36 SHELBY County. Resurface on eastbound lanes from 1.7 miles west of Route 151 to 2.2 miles east of Route PP near Lakenan, the total length of improvement being 19.741 miles.
(2): Job J2P3176 Route 36 MACON, SHELBY County. Resurface on westbound lanes from 1.7 miles west of Route Z to North Fork Salt River near Hunnewell and from 2.2 miles west of Route 151 to 0.8 mile east of Route 63 near Macon, the total length of improvement being 8.47 miles.
(3): Job J2S3155 Route O MACON County. Coldmill and resurface from 0.3 mile north of Route 36 interchange to south ramps at interchange at Bevier, the total length of improvement being 0.329 miles.

(1): Job J2P3203 Route 136 PUTNAM, SCHUYLER County. Seal Coat from Rte. 63 to Rte. N near Livonia, the total length of improvement being 7.848 miles.
(2): Job J2P3213 Route 136 CLARK, SCOTLAND County. Seal Coat from Schuyler County to near Medill, the total length of improvement being 30.896 miles.
(3): Job J2P3214 Route 15 SCOTLAND County. Resurface, shoulders, and ADA improvements from the Iowa State line to the Rte. 136 east junction in Memphis, the total length of improvement being 10.771 miles.

Job J2P3280 Route 36 MACON County. Diamond grinding from the Linn County line to 0.5 mile west of Route C near Bevier, the total length of improvement being 28.753 miles.

(1): Job J2S3184 Route 154 MONROE County. Resurface from Route 24 at Paris to 0.4 miles west of Route 107, the total length of improvement being 12.803 miles.
(2): Job J2S3210 Route 154 MONROE, RALLS County. Resurface from 0.4 mile West of Route 107 to Route 19 near Perry, the total length of improvement being 8.911 miles.

(1): Job J2S3293 Route O MARION, RALLS County. Resurface from the beginning of state maintenance in Hannibal to Route 61 near New London, the total length of improvement being 6.627 miles.
(2): Job J2S3294 Route 168 MARION County. Resurface from 0.2 mile east of Route JJ to Route 61 at Hannibal, the total length of improvement being 6.631 miles.

Job J3I3046 Route I-70 SALINE County. Resurface from Route Y to the Blackwater River Bridge, the total length of improvement being 14.241 miles.

(1): Job J3P3092 Route 41 SALINE County. Bridge replacement at Muddy Creek, 0.3 miles south of 330th Road, the total length of improvement being 0.095 miles.
(2): Job J3S3091 Route 122 SALINE County. Bridge replacement at Muddy Creek, 0.5 miles east of 305th Road, the total length of improvement being 0.161 miles.


Job J3P3111 Route 50 JOHNSON County. Resurface from Jackson County line to CR 1501, the total length of improvement being 5.311 miles.
Job J3S3136 Route C RAY County. Resurface from Route U to Route 10, the total length of improvement being 5.1 miles.
Job J4P3215 Route 169 CLAY County. Resurface from Commercial Ave. to Barry Road, the total length of improvement being 8.081 miles.
Job J4P3276 Route 92 PLATTE County. Coldmill and resurface from MO River to Route 273, the total length of improvement being 7.709 miles.
Job J4S3202 Route 9 PLATTE County. Intersection improvements at Mattox Road, the total length of improvement being 0.351 miles.
Job J4S3223 Route 9 PLATTE County. Resurface from south of NW Lakeview Drive to Route FF, the total length of improvement being 0.86 miles.

(1): Job J4S3254 Route 9 PLATTE County. Resurface from Barry Road to Route 45, the total length of improvement being 3.06 miles.
(2): Job J4S3336 Route Prairie View PLATTE County. Resurface from Route 9 to 56th Street, the total length of improvement being 2.567 miles.

Job J5I3211 Route I-44 LACLEDE County. Resurface from Webster County Line to Pulaski County Line, the total length of improvement being 52.237 miles.
Job J5M0287 Route H PULASKI County. Bridge rehabilitation over I-44 in Waynesville, the total length of improvement being 0.02 miles.
Job J5P3293 Route 19 GASCONADE County. Seal coat from 0.12 miles south of Route H to Drake, the total length of improvement being 17.86 miles.
Job J5S3261 Route Various CALLAWAY, COLE County. Bridge rehabilitation over Route 54 includes Route 94 over Little Tavern Creek in Callaway County and West Main Street over Route 54/Route 63 in Cole County, the total length of improvement being 0.161 miles.
Job J5S3280 Route U, T MILLER, PULASKI County. Resurface and add shoulders from Route 42 to Crocker, the total length of improvement being 25.546 miles.
Job J6I3034 Route I-44 ST LOUIS CITY County. Bridge replacement and coldmill from west of Kingshighway Boulevard to I-55, the total length of improvement being 2.932 miles.
Job J6I3225 Route I-70 ST CHARLES, ST LOUIS County. Bridge rehabilitation over Missouri River, the total length of improvement being 1.242 miles.
Job J6I3263 Route I-270 ST LOUIS County. Resurface from I-70 to Page Avenue, the total length of improvement being 3.306 miles.
Job J6S2211 Route AB ST LOUIS County. Bridge replacement at Hibler Creek, the total length of improvement being 0.066 miles.
Job J6S3089 Route V JEFFERSON County. Slide repair at Hardin Road, the total length of improvement being 0.427 miles.
Job J6S3328 Route 94 ST CHARLES County. Resurface and add shoulders from Route 370 to Burlington Northern Santa Fe Railroad Crossing in Orchard Farm., the total length of improvement being 5.59 miles.

(1): Job J7P3265 Route 60 WEBSTER County. Resurface from 0.6 miles west of Rt A to west of Rt O in Wright County, the total length of improvement being 24.908 miles.
(2): Job J7P3272 Route 60 WEBSTER County. Resurface from Rte. VV in Rogersville to 0.6 miles west of Rte. A, the total length of improvement being 22.374 miles.

Job J7P3423 Route 59 MCDONALD County. Guardrail and signal improvements various locations from 1.7 miles south of Route 76 in Anderson to 2.1 miles south of Route 90 in Noel, the total length of improvement being 3.585 miles.

(1): Job J9I3125 Route I-55 CAPE GIRARDEAU County. Bridge replacements over Route 61, the total length of improvement being 0.808 miles.
(2): Job J9P3460 Route 61 CAPE GIRARDEAU County. Interchange improvements from Old Orchard Road to 0.2 miles south of Veterans Memorial Drive, the total length of improvement being 1.53 miles.

Job J9I3310 Route I-55 STE GENEVIEVE County. Resurface from Jefferson County Line to 0.4 miles south of Rte M overpass in Ozora, the total length of improvement being 44.66 miles.
Job J9I3658B Route 67 MADISON, WAYNE County. Pavement improvements from Co. Rd. 211 intersection to .75 miles north of Route JJ, the total length of improvement being 0.092 miles.

(1): Job J9S3224 Route Z STODDARD County. 4 Bridge replacement from 4.4 miles west of Route 153 intersection to 3.0 miles east of Route 153 intersections, the total length of improvement being 0.4 miles.
(2): Job J9S3224B Route Z STODDARD County. 2 Bridge replacement from 2 miles west of Route 153 intersection to 1 miles west of Route 153 intersection, the total length of improvement being 0.177 miles.

EDIT: Additional projects added to the letting
(1): Job J1P1043B Route 116 CLINTON County. Scrub seal from 169 to Horse Fork Creek, in Plattsburg, and from 0.8 miles east of Route 33, near Lathrop, to I-35, the total length of improvement being 0 miles.
(2): Job J1P3193 Route 136 ATCHISON County. Scrub seal from I-29 in Rockport to Route O, near Tarkio, the total length of improvement being 22.89 miles.
(3): Job J1P3274 Route 136 ATCHISON, NODAWAY County. Scrub seal from Little Tarkio Crk, east of Tarkio, to Rte 71, the total length of improvement being 11.901 miles.
(4): Job J1S3195B Route 169 BUCHANAN County. Scrub seal from Rte FF to Clay County, the total length of improvement being 48.51 miles.
(5): Job J1S3195C Route 116 CALDWELL County. Scrub seal from Rte. D to Rte. A in Braymer, except within the city limits of Polo, the total length of improvement being 36.82 miles.
(6): Job J1S3248 Route T ANDREW County. Scrub seal from Savanah to end of route, the total length of improvement being 20.18 miles.
(7): Job J1S3285 Route Various BUCHANAN, CLINTON, DAVIESS, DEKALB County. Scrub seal in multiple counties in the Northwest District, the total length of improvement being 158.83 miles.
(8): Job J1S3300 Route Various CHARITON, DAVIESS, GRUNDY, HARRISON, LINN, LIVINGSTON County. Scrub seal in the Northwest District, the total length of improvement being 284.75 miles.

(1): Job J1L19CRO Route 128 GRUNDY County. Scrub seal located within Crowder State Park 2.3 miles west of Trenton and 1.3 miles east of Edinburg, the total length of improvement being 4.132 miles.
« Last Edit: January 09, 2020, 08:52:36 AM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

kphoger

  • *
  • Offline Offline

  • Posts: 29128
  • My 2 Achilles' heels: sarcasm & snark

  • Location: Wichita, KS
  • Last Login: March 18, 2024, 09:31:10 PM
Re: MODOT Contract Lettings
« Reply #92 on: November 08, 2019, 02:12:39 PM »

Article regarding the future of I-229: https://www.newspressnow.com/news/local_news/modot-eyes-final-two-alternatives-for-i--bridge/article_8669f8be-0166-11ea-9366-cf6187c928e9.html

MODOT Site: https://www.stjoe229.com/

I just drove that for the first time a couple of weeks ago.  I'm glad I got the chance, although I wish it had been southbound instead of northbound.
Logged
Keep right except to pass.  Yes.  You.
Visit scenic Orleans County, NY!
Male pronouns, please.

Quote from: Philip K. Dick
If you can control the meaning of words, you can control the people who must use them.

Revive 755

  • *
  • Offline Offline

  • Posts: 4789
  • Last Login: March 13, 2024, 10:56:10 PM
Re: MODOT Contract Lettings
« Reply #93 on: November 09, 2019, 11:55:53 AM »

(1): Job J2P3130 Route 61 MARION County. Resurface from 0.6 Miles South of Route F to 0.4 Miles North of Route 168 near Hannibal, the total length of improvement being 11.451 miles.
(2): Job J2P3168 Route 24 MARION County. Resurface from Route 61 to 0.5 Mile North of Route 36 near Hannibal, the total length of improvement being 4.419 miles.
(3): Job J2P3173 Route 24, 61 MARION County. Intersection improvements at Route 61, 24, and F intersection near Palmyra, the total length of improvement being 0.405 miles.

Interesting how the control cities for southbound US 61/westbound US 24 will be changing from Hannibal and Monroe City to St. Louis and Kansas City (easternmost mention of Kansas City on US 24?).
Logged

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #94 on: November 09, 2019, 02:35:17 PM »

(1): Job J2P3130 Route 61 MARION County. Resurface from 0.6 Miles South of Route F to 0.4 Miles North of Route 168 near Hannibal, the total length of improvement being 11.451 miles.
(2): Job J2P3168 Route 24 MARION County. Resurface from Route 61 to 0.5 Mile North of Route 36 near Hannibal, the total length of improvement being 4.419 miles.
(3): Job J2P3173 Route 24, 61 MARION County. Intersection improvements at Route 61, 24, and F intersection near Palmyra, the total length of improvement being 0.405 miles.

Interesting how the control cities for southbound US 61/westbound US 24 will be changing from Hannibal and Monroe City to St. Louis and Kansas City (easternmost mention of Kansas City on US 24?).

Speaking of US 24 and Kansas City, the project for resigning the US 24 for the route changes is listed on the Tentative Lettings for June 2020 (Project 4I3233).
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #95 on: December 06, 2019, 09:08:45 AM »

January 17, 2020 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J1S3140 Route PP SULLIVAN County. Bridge replacement 0.2 miles east outer Route 139 near Osgood over east Medicine Creek Drainage Ditch, the total length of improvement being 0.257 miles.

(1): Job J2S3046 Route H RALLS County. Bridge rehabilitation over Salt River 1.2 miles north of Route A near Center, the total length of improvement being 0.141 miles.
(2): Job J2S3047 Route A RALLS County. Bridge rehabilitation over Salt River 1.9 miles west of Route H near Center., the total length of improvement being 0.184 miles.

Job J3S3090 Route O PETTIS County. Bridge replacement 2.7 miles north of Lee Road over Muddy Creek, the total length of improvement being 0.13 miles.
Job J3S3184 Route 127 SALINE County. Resurface from Route 20 to I-70, the total length of improvement being 8.753 miles.
Job J4P3214C Route Various JACKSON County. Signal improvements in various intersection on US24, US40 and MO78, the total length of improvement being 31.956 miles.

(1): Job J4P3249 Route 291 CLAY County. Coldmill and resurface from Leonard St to Route 78, the total length of improvement being 10.055 miles.
(2): Job J4P3260 Route 291 CLAY County. Coldmill and resurface from I-435 to north of Kansas Street, the total length of improvement being 5.724 miles.

(1): Job J4S3257 Route 9 PLATTE County. Coldmill and resurface from I-635 to Briarcliff Pkwy, the total length of improvement being 1.02 miles.
(2): Job J4S3259 Route 9 CLAY County. Coldmill and resurface from I-635 to Briarcliff Pkwy, the total length of improvement being 1.59 miles.

Job J4S3359 Route W CLAY County. Resurface from Route 169 to Route C, the total length of improvement being 7.298 miles.

(1): Job J5S3242 Route A GASCONADE County. Bridge replacement over Third Creek, 4.2 miles south of Mount Sterling, the total length of improvement being 0.113 miles.
(2): Job J5S3250 Route D OSAGE County. Bridge replacement over Mistaken Creek, 0.2 miles west of Cooper Hill, the total length of improvement being 0.055 miles.


Job J5S3240 Route AA WASHINGTON County. Bridge replacement over FOURCHE-A-RENAULT Creek, the total length of improvement being 0.0752 miles.

(1): Job J6I3257 Route I-70 ST LOUIS CITY County. Coldmill and resurface from Kingshighway Blvd to Branch Street, the total length of improvement being 3.626 miles.
(2): Job J6I3338 Route I-70 ST LOUIS, ST LOUIS CITY County. 14 Bridge rehabilitation from Cypress in St. Louis County to Branch in St. Louis City, the total length of improvement being 12.9 miles.
(3): Job J6I3499 Route I-70 ST LOUIS County. Pavement improvements along I-70 from east of Springdale to Bermuda, the total length of improvement being 1.317 miles.

Job J6I3423 Route I-64 ST CHARLES County. Pavement repairs from I-70 to Lake Saint Louis Blvd., the total length of improvement being 2.2 miles.
Job J6S3168 Route AD FRANKLIN County. Bridge replacement over Happy Sac Creek, the total length of improvement being 0.322 miles.
Job J6S3232 Route V JEFFERSON County. Culvert replacement at Joachim Creek, the total length of improvement being 0.08 miles.
Job J6S3319 Route A ST CHARLES County. Resurface and bridge rehabilitation from Route 61 to I-70, the total length of improvement being 3.125 miles.
Job J6S3401 Route Various JEFFERSON County. Pavement improvement, signal installation and ADA improvements on Route 109 to Routes FF and W, near Eureka, the total length of improvement being 0.581 miles.
Job J6M0278 Route Various FRANKLIN County. Resurface on various routes in Franklin County, the total length of improvement being 17.669 miles.

(1): Job J7I3050 Route I-49 BATES County. Bridge deck replacement over the Bates County Drainage Ditch, the total length of improvement being 1.957 miles.
(2): Job J7I3366 Route I-49 BATES County. 3 Bridge rehabilitations over the Marais Des Cygnes River and the Bates County Drainage Ditch, the total length of improvement being 0.716 miles.

(1): Job J7I3405 Route Various VARIOUS County. Job Order Contract for bridge repair in the southern counties of the Southwest District, the total length of improvement being 0 miles.
(2): Job J8I3178 Route Various VARIOUS County. Job Order Contract for bridge repair inside the Ozarks Transportation Organization Boundary are of the Southwest District, the total length of improvement being 0 miles.

Job J7I3406 Route Various VARIOUS County. Job Order Contract for bridge repair in the northern counties of the Southwest District, the total length of improvement being 0 miles.
Job J7I3411 Route I49 VERNON County. Bridge rehabilitation over Marmaton River north of Nevada, the total length of improvement being 0.322 miles.

(1): Job J7S3202 Route C ST CLAIR County. Bridge rehabilitation over Truman Lake, east of Lowry City, 5.5 miles east of Route 13, the total length of improvement being 0.568 miles.
(2): Job J7S3203 Route ZZ ST CLAIR County. Bridge rehabilitation over Truman Lake, the total length of improvement being 0.478 miles.


(1): Job J7S3402 Route Various VARIOUS County. Seal coat in the east portion of the southwest district, the total length of improvement being 97.585 miles.
(2): Job J8S3176 Route Various VARIOUS County. Seal coat in the OTO area of the southwest district, the total length of improvement being 23.4 miles.

Job J8S3161 Route 125 / OO GREENE County. Drainage improvements from e/o Rte. OO to e/o Old Orchard Dr. in Strafford, the total length of improvement being 0.341 miles.

(1): Job J9P3370 Route 63 TEXAS County. Resurface from Cleveland Road to Route U, the total length of improvement being 12.6 miles.
(2): Job J9P3426 Route 60 CARTER, SHANNON County. Resurface from east of Rte. J to County Road 455, the total length of improvement being 8.955 miles.
(3): Job J9S3415 Route F TEXAS County. Pavement Improvements from Route 63 to the end of state maintenance, the total length of improvement being 0.3 miles.
(4): Job J9S3440 Route BUS 63 HOWELL County. Resurface from 0.6 mile south of Rte. 63 to 0.8 mile north of Rte. 60 in Willow Springs, the total length of improvement being 3.04 miles.
(5): Job J9S3445 Route BUS 60 TEXAS County. Resurface from Rte. 63 to Rte. 60, the total length of improvement being 2.986 miles.
(6): Job J9S3531 Route BUS 60 HOWELL County. Resurface from Bus. 63 to Rte. 60 in Willow Springs, the total length of improvement being 1.535 miles.

Job J9P3576 Route 60 VARIOUS County. Slope repair in various locations, the total length of improvement being 177.21 miles.

Job J9P3627 Route Various VARIOUS County. Job Order Contract for erosion control repairs in various locations in the Southeast District, the total length of improvement being 0 miles.

(1): Job J9S3220 Route CC PEMISCOT County. Bridge Replacement 1.3 miles north of Route A, the total length of improvement being 0.111 miles.
(2): Job J9S3222 Route A PEMISCOT County. Bridge replacement 1.5 miles north of Bragg City, the total length of improvement being 0.119 miles.
(3): Job J9S3227 Route T PEMISCOT County. Bridge replacement 4 miles southeast of Hayward, the total length of improvement being 0.111 miles.
(4): Job J9S3331 Route A PEMISCOT County. Bridge replacement 0.5 miles north of Route K intersection, the total length of improvement being 0.057 miles.
(5): Job J9S3332 Route 153 PEMISCOT County. Bridge replacement 0.25 east of Route EE intersection, the total length of improvement being 0.149 miles.

(6): Job J9S3333 Route C PEMISCOT County. Bridge replacement 5 miles west of Steele, the total length of improvement being 0.036 miles.

(1): Job J9S3263 Route 91 STODDARD County. Bridge replacement 0.48 miles east of Rte 91/P intersection, the total length of improvement being 0.03 miles.
(2): Job J9S3264 Route 91 STODDARD County. Bridge replacement 3 Miles East of Bell City, MO, the total length of improvement being 0.05 miles.
(3): Job J9S3278 Route 91 SCOTT County. Bridge replacement from 0.04 miles west of Rte CC/91 intersection, the total length of improvement being 0.069 miles.
(4): Job J9S3279 Route 91 SCOTT County. Bridge replacement fom 1.8 miles west of Rte CC/91 intersection, the total length of improvement being 0.033 miles.

(1): Job J9I3553 Route 60 NEW MADRID, SCOTT, STODDARD County. Resurface from I-57 to Spring Creek, the total length of improvement being 28.962 miles.
(2): Job J9S3571 Route 60 MISSISSIPPI County. Resurface from I-57 to Bridge K0950, the total length of improvement being 10.825 miles.

Job J9M0276 Route 60, 67 BUTLER County. Conduit installation from Route W on BU 67 to 2nd St. on BU 60, the total length of improvement being 3.442 miles.

EDIT: Additional projects added to the letting
Job J4S3218 Route Blue Ridge Boulevard JACKSON County. Bridge replacement over Route 78, the total length of improvement being 0.175 miles.
« Last Edit: February 05, 2020, 05:34:53 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #96 on: January 24, 2020, 11:04:23 AM »

February 21, 2020 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

(1): Job J1S0588 Route D DEKALB County. Bridge replacement over Ervins Branch, 0.4 mile north of Rte. W near Maysville, the total length of improvement being 0.15 miles.
(2): Job J1S3133 Route 48 ANDREW County. Bridge replacement over Agee Creek 2 miles east of Route D near Whitesville, the total length of improvement being 0.076 miles.


(1): Job J1P3144 Route 6 GRUNDY County. Resurface and ADA improvements from 4th Street to Muddy Creek bridge in Trenton, the total length of improvement being 1.728 miles.
(2): Job J1P3199 Route 69, 6 DAVIESS, GRUNDY County. Resurface and shoulder repairs from I-35 to 4th Street in Trenton; from I-35 to west end Bridge A6784, the total length of improvement being 34.768 miles.

Job J1P3250 Route 6 DAVIESS, GRUNDY County. Scrub seal from the East end of Bridge A6784 to 4th Street in Trenton, the total length of improvement being 17.386 miles.

(1): Job J1P3239 Route 6 SULLIVAN County. Resurface, drainage and ADA improvements within the city limits of Green Castle, the total length of improvement being 0.551 miles.
(2): Job J1S3243 Route D, FF SULLIVAN County. Resurface, drainage and ADA Improvements within the city limits of Green Castle, the total length of improvement being 0.466 miles.

Job J1S3359 Route 13 CALDWELL County. Bridge rehabilitation over Route 36 in Hamilton, the total length of improvement being 0.021 miles.

(1): Job J2S3120 Route U PIKE County. Bridge replacement 1 mile west of Route 61 near Bowling Green, the total length of improvement being 0.065 miles.
(2): Job J2S3177 Route U PIKE County. Bridge replacement 0.2 mile west of Route 61 near Bowling Green, the total length of improvement being 0.092 miles.
(3): Job J3S2219 Route C PIKE County. Bridge replacement over Crooked Branch 2.4 miles west of Rte. E near Frankford, the total length of improvement being 0.087 miles.


(1): Job J2S3232 Route DD MACON County. Bridge painting over Middle Fork Salt River 3.3 miles east of Route 63 near Kellogg., the total length of improvement being 0.024 miles.
(2): Job J2S3233 Route 151 SHELBY County. Bridge painting over Salt River 0.4 mile west of Route K near Hagers Grove, the total length of improvement being 0.034 miles.
(3): Job J2S3234 Route M MACON County. Bridge painting over Middle Fork Salt River 1.8 miles east of Route 63 near Atlanta., the total length of improvement being 0.027 miles.
(4): Job J2S3235 Route J MACON County. Bridge painting over Middle Fork Salt River 0.6 mile west of Route O near Plainview, the total length of improvement being 0.016 miles.

(1): Job J3P3125 Route 41 SALINE County. Bridge replacement over Flat Creek one mile west of Route D, the total length of improvement being 0.303 miles.
(2): Job J3P3126 Route 41 SALINE County. Bridge replacement over Camp Creek 1.5 miles east of Rte E, the total length of improvement being 0.12 miles.


(1): Job J3S3115 Route D PETTIS County. Bridge replacement 0.9 miles west of McCubbin Road and 0.8 miles east of McAninch Road over Heaths Creek, the total length of improvement being 0.19 miles.
(2): Job J3S3116 Route D PETTIS County. Bridge replacement South Fork of the Blackwater River, 0.7 miles east of MO 127 and 2.4 miles west of Gibson Road, the total length of improvement being 0.241 miles.


Job J4P3212D Route 2 CASS County. Intersection improvements at Blinker Light Road near Harrisonville, the total length of improvement being 0.1985 miles.
Job J4S3356 Route RA JACKSON County. Resurface from S Outer Road to State Maintenance Ends, the total length of improvement being 1.321 miles.

(1): Job J4S3362 Route Z CASS County. Resurface from MO 2 to MO 7 in Garden City, the total length of improvement being 4.085 miles.
(2): Job J4S3364 Route P CASS County. Resurface from MO 7 to Staley Mound Road, the total length of improvement being 4.381 miles.

Job J5I3302 Route I-44 VARIOUS County. Safety improvements at various ramp locations, the total length of improvement being 0 miles.

(1): Job J5S3251 Route K COOPER County. Bridge deck replacement over Black water River north of Black water, the total length of improvement being 0.161 miles.
(2): Job J5S3260 Route DD COOPER County. Bridge deck replacement 0.7 mile west of Route K, near Blackwater, the total length of improvement being 0.15 miles.

Job J6I3341 Route I-55 JEFFERSON, ST LOUIS County. Crack sealing and guardrail from Route 61/67 to Route 141, the total length of improvement being 5.497 miles.
Job J6I3506 Route I-44 FRANKLIN County. Slide repair west of Route OO, the total length of improvement being 0.14 miles.
Job J6M0279 Route 141 ST LOUIS County. Sound wall repair on Route 141 at Helfrich and Ladue Farms, the total length of improvement being 0.008 miles.

(1): Job J6P3422 Route 364 ST LOUIS County. Coldmill and microsurface from Bennington Place to Schuetz Rd, the total length of improvement being 1.712 miles.
(2): Job J6S3267 Route 180 ST LOUIS County. Microsurface and signal improvements from Pennridge/Boenker to I-270, the total length of improvement being 0.14 miles.
(3): Job J6S3406 Route D ST LOUIS County. Coldmill and microsurface from Schuetz Rd to Lindbergh, the total length of improvement being 1.517 miles.

(1): Job J6Q3467 Route Various ST LOUIS CITY County. ITS improvements at various routes across the St. Louis District, the total length of improvement being 0 miles.
(2): Job J6Q3472 Route Various ST LOUIS County. ITS improvments at various locations across the St. Louis District, the total length of improvement being 0 miles.

Job J6S3387 Route TT FRANKLIN County. Resurface and add shoulders from Commercial Ave. to Mill Hill Road, the total length of improvement being 4.78 miles.
Job J0I3006N Route I-44 VARIOUS County. Job Order Contracting for asphalt pavement repair from the Oklahoma State line to Rte. 360 in Greene County, the total length of improvement being 0 miles.
Job J0I3006O Route I-44 GREENE County. Job Order Contracting for asphalt pavement repair in the Ozarks Transportation Organization area, the total length of improvement being 0 miles.
Job J0I3006P Route I-44 WEBSTER County. Job Order Contracting for asphalt pavement repair in Webster County, the total length of improvement being 0 miles.
Job J0I3006W Route I-49 VARIOUS County. Job Order Contracting for asphalt pavement repair from the Cass County line to Rte. 54 in Vernon County, the total length of improvement being 0 miles.
Job J0I3006X Route I-49 VARIOUS County. Job Order Contracting for asphalt pavement repair from Route 54 in Vernon County to I-44 in Jasper County, the total length of improvement being 0 miles.
Job J0I3006Y Route I-49 MCDONALD County. Job Order Contracting for asphalt pavement repair from Rte. 59 to 0.7 mile south of Rte. H, the total length of improvement being 0 miles.
Job J7P3190B Route CC NEWTON County. Culvert replacement approximately 0.5 miles south of Racine, the total length of improvement being 0.09 miles.
Job J8M0261 Route 65 GREENE County. DMS board upgrade on northbound US 65 0.48 miles north of Battlefield Road, the total length of improvement being 0.074 miles.

(1): Job J9L20BAT Route Pilot Knob IRON County. Seal coat in Battle of Pilot Knob State Park, the total length of improvement being 0 miles.
(2): Job J9L20ELE Route Elephant Rocks IRON County. Seal coat in Elephant Rocks State Park, the total length of improvement being 0 miles.
(3): Job J9L20JOH Route Johnson's Shut-Ins IRON County. Seal coat in Johnson's Shut-Ins State Park, the total length of improvement being 0 miles.
(4): Job J9L20LAK Route Lake Wappapello WAYNE County. Seal coat at Lake Wappapello, the total length of improvement being 0 miles.
(5): Job J9L20SAM Route Sam A Baker WAYNE County. Seal coat in Sam A. Baker State Park, the total length of improvement being 0 miles.

(1): Job J9P3427 Route 160 OREGON County. Resurface from Route 99 east to Route FF, the total length of improvement being 19.726 miles.
(2): Job J9S3377 Route 76 DOUGLAS, HOWELL County. Resurface from Route 137 east to Route 181, the total length of improvement being 10.606 miles.
(3): Job J9S3412 Route 142 HOWELL County. Resurface from Route 101 east to Route E, the total length of improvement being 9.721 miles.
(4): Job J9S3416 Route MM TEXAS County. Resurface from Route 38 to south end of Bridge No. A2967, the total length of improvement being 12.372 miles.
(5): Job J9S3417 Route AM WRIGHT County. Resurface from Route 95 to end of state maintenance, the total length of improvement being 4.032 miles.
(6): Job J9S3419 Route Z HOWELL County. Resurface from Route 76 to Route P, the total length of improvement being 8.102 miles.
(7): Job J9S3422 Route M OREGON County. Resurface from Route 63 to Route 160, the total length of improvement being 9.632 miles.
(8): Job J9S3423 Route J OZARK County. Resurface from Route 160 to Arkansas state line, the total length of improvement being 6.705 miles.
(9): Job J9S3424 Route JJ DOUGLAS County. Resurface from Route 5 to Route 95, the total length of improvement being 11.889 miles.

Job J9S3209 Route 142 RIPLEY County. Bridge replacement over Little Black River, north of Naylor, the total length of improvement being 0.134 miles.

(1): Job J9S3257 Route 153 VARIOUS County. Resurface from Route 60 in Stoddard county south to Route 25 in Dunklin county, the total length of improvement being 46.804 miles.
(2): Job J9S3291 Route E DUNKLIN County. Resurface and add shoulders from Route 84 to Route 25, the total length of improvement being 2.697 miles.
(3): Job J9S3402 Route C MISSISSIPPI County. Resurface from Route B to Route 105, the total length of improvement being 5.471 miles.

Job J9S3385 Route J OZARK County. Bridge replacement over Lick Creek, the total length of improvement being 0.18 miles.

(1): Job J9S3393 Route AA CAPE GIRARDEAU County. Bridge replacement over Caney Fork Creek, 0.31 miles west of CRD 475, the total length of improvement being 0.073 miles.
(2): Job J9S3395 Route ZZ SCOTT County. Bridge replacement 0.2 miles east of Route BB intersection near Sikeston, the total length of improvement being 0.111 miles.
(3): Job J9S3439 Route P BOLLINGER County. Bridge replacement 2.2 miles west of Route 51 near Arab, the total length of improvement being 0.236 miles.


EDIT: Additional lettings added
(1): Job J1P3382 Route 24 CARROLL County. Flood repair from south end of bridge over Moss Creek to the Missouri River Bridge near Waverly, the total length of improvement being 4.15 miles.
(2): Job J2P2211 Route 24 CARROLL, CHARITON County. Resurface and shoulder improvements 1.9 miles east of Rte. 41, near Dewitt, to Rte 5 in Keytesville, the total length of improvement being 16.016 miles.


(1): Job J7P3299 Route 7 BENTON, CEDAR, DADE, HENRY, ST CLAIR County. Bridge rehabilitation at various locations in various counties in the Southwest District, the total length of improvement being 0 miles.
(2): Job J7P3360 Route 7 BENTON County. Bridge rehabilitation over Truman Lake, the total length of improvement being 0.4 miles.
(3): Job J7S3359 Route 64 HICKORY County. Bridge rehabilitation over Lake Pomme de Terre, the total length of improvement being 0.327 miles.
« Last Edit: March 06, 2020, 08:59:42 AM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #97 on: February 10, 2020, 10:20:45 PM »

They have opened (a few days early :)) the letting for the MO portion of the Bella Vista Bypass on their lettings page. I will update this post later in the week once the remaining March 20 projects are added to that page.

March 20, 2020 Letting: Bid Results. Bid Award Winners

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J7P0601 Route I-49 MCDONALD County. Construct new interstate from Pineville to the Arkansas state line, the total length of improvement being 5.006 miles.

EDIT: Adding remaining lettings
Job J1S3347 Route T HOLT County. Grading, drainage and paving from 0.6 miles to 0.63 miles south of Rte. 111 near Forest City, the total length of improvement being 0.2 miles.
Job J2P2211 Route 24 CARROLL, CHARITON County. Resurface and shoulder improvements 1.9 miles east of Rte. 41, near Dewitt, to Rte 5 in Keytesville, the total length of improvement being 16.016 miles.

(1): Job J2P3171 Route 61 RALLS County. Intersection improvements at Rte. A and 5th St. intersections in New London, the total length of improvement being 1.435 miles.
(2): Job J2S3295 Route 61 RALLS County. Resurface and ADA improvements from Rte. 61 to 0.2 mile north of Rte. 19 at New London, the total length of improvement being 1.586 miles.

Job J3S0623 Route 161 MONTGOMERY County. Bridge replacement over Smith Branch 3.4 miles south of Rte. 19 near Danville, the total length of improvement being 0.135 miles.

(1): Job J3S3106 Route 765 PETTIS County. ADA improvements from Morgan Street to Pacific Street, the total length of improvement being 0.256 miles.
(2): Job J7S3403 Route B BENTON County. ADA improvements from Jefferson Street to 0.03 miles north of Valley Street in Cole Camp, the total length of improvement being 0.043 miles.

Job J4I3197 Route 273 PLATTE County. Bridge replacement over I-29, the total length of improvement being 0.298 miles.
Job J4I3325 Route I-29 VARIOUS County. Sign installation at various ramps along I-29, the total length of improvement being 33.661 miles.
Job J5S3429 Route H PULASKI County. Bridge rehabilitation over I-44 in Waynesville, the total length of improvement being 0.02 miles.
Job J5P3425 Route 8 WASHINGTON County. Fiber interconnect, signal improvements and add turn lanes from Route 8 to Route O/U east of Potosi, the total length of improvement being 3.18 miles.
Job J5S3243 Route 100 OSAGE County. Bridge replacement 1.1 miles northwest of Morrison, the total length of improvement being 0.184 miles.
Job J5S3430 Route OO DALLAS, LACLEDE County. Resurface from Route 64A to Route 32 near Bennett Spring State Park, the total length of improvement being 8.925 miles.
Job J5S3432 Route Y HOWARD County. Resurface from Route 124 to State Maintenance Ends, the total length of improvement being 7.501 miles.
Job J0I3006M Route Various VARIOUS County. Job Order Contract for pavement repair in various locations in the St. Louis District, the total length of improvement being 0 miles.

(1): Job J6I3243 Route I-44 FRANKLIN County. 7 Bridge rehabilitations east of MO 100 to Highway OO in Pacific, the total length of improvement being 0.474 miles.
(2): Job J6I3252 Route I-44 ST LOUIS County. 6 Bridge rehabilitations from US Route 66 to BNSF R.R. on I-44 in Eureka, the total length of improvement being 0.917 miles.

Job J6I3405 Route I-44 VARIOUS County. Wrong way signing installation from Route WW/D in Sullivan to 7th Street in St. Louis City, the total length of improvement being 66.669 miles.
Job J6I3426 Route I-64 ST LOUIS CITY County. Add debris netting between 14th Street to 8th Street, the total length of improvement being 0.453 miles.

(1): Job J6M0276 Route Y FRANKLIN County. Resurface from Route YY to Route E, the total length of improvement being 5.255 miles.
(2): Job J6S3420 Route ZZ, Y FRANKLIN County. Resurface from Route C to Route Y on Route ZZ and from Route YY to Route 50 on Route Y, the total length of improvement being 13.409 miles.

Job J6P3333 Route Various VARIOUS County. Job Order Contract for pavement repair in various locations in the St. Louis District, the total length of improvement being 0 miles.

(1): Job J6S3240 Route I-55 JEFFERSON County. Coldmill, resurface, & drainage from Route M to Route Z, the total length of improvement being 4.327 miles.
(2): Job J6S3421 Route I-55 JEFFERSON County. Resurface and ADA improvements from Vogel Road to end of maintenance and Imperial Main Street from OR 55 to Old State Road, the total length of improvement being 4.232 miles.

Job J6S3287 Route Various JEFFERSON County. 6 Bridge rehabilitations on Routes 30, B, NN and MM, the total length of improvement being 1.132 miles.
Job J6S3390 Route 30 JEFFERSON County. Grading and pavement from Rivermont Trail to 0.5 miles west and then from Local Hillsboro Road to 500 feet east, the total length of improvement being 0.57 miles.

(1): Job J7I3412 Route I-44 WEBSTER County. Pavement repair various locations in Webster County, the total length of improvement being 41.218 miles.
(2): Job J8P3182 Route Various CHRISTIAN, GREENE County. Pavement repair various locations around Springfield, the total length of improvement being 142.2 miles.

(1): Job J7P3105B Route 376 TANEY County. Bridge rehabilitation 0.5 miles east of Rte 265 in Branson, the total length of improvement being 0.23 miles.
(2): Job J8P3068B Route 60, 65 GREENE County. Bridge rehabilitation at the US 60 & US 65 interchange in Greene County, the total length of improvement being 0.759 miles.
(3): Job J8P3068C Route 65 GREENE County. Bridge rehabilitation at the US160 and I-44 and the US 65 and Route D interchanges, the total length of improvement being 0.08 miles.

(1): Job J7P3244 Route 37 BARTON County. ADA Improvements from Jefferson Street to Gallagher Road in Golden City, the total length of improvement being 0.324 miles.
(2): Job J7S3247 Route H JASPER County. ADA improvements from Park St. to 4th St. in Jasper, the total length of improvement being 0.38 miles.
(3): Job J7S3253 Route MM JASPER County. ADA improvements at Ruby Jack Trail crossing and from 3rd Street to Grant Street in Oronogo, the total length of improvement being 0.414 miles.

(1): Job J7P3246 Route 82 CEDAR County. ADA improvements from McCrary street to Route 54 in El Dorado Springs, the total length of improvement being 1.165 miles.
(2): Job J7S3182 Route WW ST CLAIR County. ADA improvements various locations on Rt WW in Osceola, the total length of improvement being 0.958 miles.

Job J7S3251 Route K HENRY County. ADA improvements on various locations on Route K in Urich, on Route K in Germantown, from California Ave. to Missouri Ave. in Montrose and from High St. to Mechanic St, the total length of improvement being 1.148 miles.
Job J8P3067B Route 13 GREENE County. Bridge rehabilitation from 1.75 miles South of Route O to 2.5 North of I-44 North of Springfield, the total length of improvement being 0.239 miles.
Job J8P3087B Route 160 CHRISTIAN County. Intersection improvements on US 160 and South Street in Nixa., the total length of improvement being 0.33 miles.
Job J8Q3180 Route 160 CHRISTIAN, GREENE County. ITS improvements from South Street to Farm Road 192, the total length of improvement being 4.2 miles.

(1): Job J9I3110 Route I-55 CAPE GIRARDEAU, PERRY County. Resurface 0.7 miles South of Route KK to Route T, the total length of improvement being 13.876 miles.
(2): Job J9I3309 Route I-55 VARIOUS County. Resurface in southbound lane from Route 51 to Route 61 and from Route 74 to Route 77 and in northbound lane from Route 77 to Route M, the total length of improvement being 45.213 miles.

Job J9P3091 Route 84 DUNKLIN County. Bridge painting and rehabilitation over St. Francis River, the total length of improvement being 0.361 miles.
Job J9P3512 Route 62 NEW MADRID County. Coldmill and resurface from Route 25 to Route 61, the total length of improvement being 18.828 miles.
Job J9P3520 Route 412 DUNKLIN County. Resurface from end of divided highway to Route VV, the total length of improvement being 21.14 miles.
Job J9P3631 Route Various VARIOUS County. Job Order Contract for asphalt repair on all major highways except interstates in the Southeast District, the total length of improvement being 0 miles.
Job J9S3634 Route Various VARIOUS County. Job Order Contract for concrete pavement repair on all major highway except interstates in the Southeast district, the total length of improvement being 0 miles.
Job J9S3219 Route BUS 63 OREGON County. Bridge replacement over Burlington Northern Santa Fe Railroad and Two Mile Creek, the total length of improvement being 0.112 miles.

EDIT: More projects added to letting
Job J1S3377 Route B ATCHISON County. Pavement repair and resurface from I-29 to US 59 near Rock Port, the total length of improvement being 15.641 miles.

(1): Job J1S3209 Route C CARROLL County. Culvert replacement over Branch of Turkey Creek 1.9 miles west of Route F, the total length of improvement being 0.12 miles.
(2): Job J1S3209B Route C CARROLL County. Culvert replacement over Turkey Creek 1.9 miles west of Route F, the total length of improvement being 0.1373 miles.


(1): Job J2S2168 Route D MACON County. Bridge replacement Over Burlington Northern Santa Fe Railroad in La Plata, the total length of improvement being 0.122 miles.
(2): Job J2S3198 Route DD MACON County. Bridge replacement over Billy's Branch 0.8 mile west of Route K near Ten Mile, the total length of improvement being 0.08 miles.


Job J3P3185 Route 65 PETTIS County. Bridge rehabilitations 1.6 miles south of Route B, over Flat Creek, the total length of improvement being 0.449 miles.
Job J6I3383 Route I-44 ST LOUIS County. Sign improvements from Crawford County line to I-70 in St. Louis City, the total length of improvement being 68.8 miles.

(1): Job J8P0588I Route 14 CHRISTIAN County. Grading and pavement from 32nd Street to 22nd Street in Ozark, the total length of improvement being 0.752 miles.
(2): Job J8P3015 Route 14 CHRISTIAN County. Grading and pavement on Jackson Street at Route NN in Ozark, the total length of improvement being 0.458 miles.
(3): Job J8P3096 Route 14 CHRISTIAN County. Grading and pavement on Jackson Street to 0.1 miles west of Route NN in Ozark, the total length of improvement being 0.62 miles.
(4): Job J8P3115 Route 14 CHRISTIAN County. Coldmill and resurface through the City of Ozark, from 3rd Street to 6th Street, the total length of improvement being 2.756 miles.
« Last Edit: September 27, 2020, 01:05:37 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

skluth

  • *
  • Offline Offline

  • Posts: 3250
  • Age: 67
  • Location: Palm Springs, CA
  • Last Login: February 20, 2024, 03:35:22 PM
Re: MODOT Contract Lettings
« Reply #98 on: February 11, 2020, 12:09:42 AM »

(1): Job J2P3130 Route 61 MARION County. Resurface from 0.6 Miles South of Route F to 0.4 Miles North of Route 168 near Hannibal, the total length of improvement being 11.451 miles.
(2): Job J2P3168 Route 24 MARION County. Resurface from Route 61 to 0.5 Mile North of Route 36 near Hannibal, the total length of improvement being 4.419 miles.
(3): Job J2P3173 Route 24, 61 MARION County. Intersection improvements at Route 61, 24, and F intersection near Palmyra, the total length of improvement being 0.405 miles.

Interesting how the control cities for southbound US 61/westbound US 24 will be changing from Hannibal and Monroe City to St. Louis and Kansas City (easternmost mention of Kansas City on US 24?).
That's actually a good idea. The locals already know which roads to take locally. But any long distance drivers aren't likely to know whether they're going towards STL or KC from the older control cities, even if they'll more likely take US 36 and I-35 to KC instead of US 24.
Logged

mvak36

  • *
  • Offline Offline

  • Posts: 1383
  • Last Login: March 18, 2024, 05:22:01 PM
Re: MODOT Contract Lettings
« Reply #99 on: April 02, 2020, 04:38:47 PM »

April 17, 2020 Letting: Bid Results. Bid Award Winners

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J0I3006B Route I-29, I-229 VARIOUS County. Job Order Contract for asphalt pavement repair from the Iowa State line to the Platte County Line, the total length of improvement being 0 miles.
Job J0I3006D Route I-35 VARIOUS County. Job Order Contract for asphalt pavement repair from the Iowa State line to the Clay County line, the total length of improvement being 0 miles.
Job J1P3298 Route 36 VARIOUS County. Job Order Contract for asphalt pavement repair from the Kansas State line to the Macon County line, the total length of improvement being 0 miles.

(1): Job J2P3222 Route 136 SCHUYLER County. ADA improvements from Fifth Street to Perry Street in Lancaster, the total length of improvement being 0.156 miles.
(2): Job J2P3224 Route 136 SCHUYLER County. ADA improvements from Cemetery Street to Angus Drive and on Route A from Route 136 to Bondurant Street in Downing, the total length of improvement being 0.874 miles.
(3): Job J2S3221 Route M MACON County. ADA improvements from Aaron Street to Orchard Street in Atlanta, the total length of improvement being 0.184 miles.

Job J3S3083 Route 131 JOHNSON, LAFAYETTE County. Resurface and add shoulders from Odessa south city limits to Highway 50, the total length of improvement being 10.458 miles.
Job J3S3137 Route Y PETTIS County. Resurface and ADA improvements from Quisenberry Road to Route 65, the total length of improvement being 3.169 miles.
Job J4P3266 Route Various VARIOUS County. Bridge rehabilitations at various locations throughout the urban Kansas City district, the total length of improvement being 0.714 miles.
Job J4Q3397 Route Various VARIOUS County. ITS improvements in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4S3294 Route Various VARIOUS County. Signal improvements in various locations in the Kansas City District, the total length of improvement being 0 miles.
Job J5P3427 Route Various BOONE County. Fiber Interconnect in Columbia, the total length of improvement being 9.467 miles.
Job J5S3248 Route EE HOWARD County. Bridge deck replacement Route EE approximately 2 miles west of route J, the total length of improvement being 0.076 miles.
Job J6I3389 Route I-55 JEFFERSON County. Grading and pavement Route I-55 near St. louis county, the total length of improvement being 0.785 miles.
Job J6I3506 Route I-44 FRANKLIN County. Rock removal west of Route OO, the total length of improvement being 0.14 miles.

(1): Job J7I3343 Route I-44 VARIOUS County. Sign installation at various interchanges, the total length of improvement being 90.199 miles.
(2): Job J8I3146 Route I-44 GREENE County. Sign installation at various interchanges, the total length of improvement being 21.521 miles.

(1): Job J7P3187I Route 571 JASPER County. Intersection improvements intersection of Elk St. and Fairlawn Ave, the total length of improvement being 0.102 miles.
(2): Job J7S3269 Route 571 JASPER County. Coldmill and resurface from south of Route E to I-49 in Carthage, the total length of improvement being 1.509 miles.
(3): Job J7S3284 Route 571 JASPER County. ADA improvements from Rte E to South of Fir Rd in Carthage, the total length of improvement being 1.236 miles.

Job J0I3006T Route Various VARIOUS County. Job Order Contract for asphalt pavement repairs from the Jefferson County Line to the Arkansas State Line on I-55 and all of I-57 and I-155, the total length of improvement being 0 miles.
Job J0I3006U Route Various VARIOUS County. Job Order Contract for concrete pavement repairs from the Jefferson County Line on I-55 to the Arkansas State line and all of I-57 and I-155, the total length of improvement being 0 miles.

(1): Job J9I3559 Route I-55, I-57 MISSISSIPPI, SCOTT County. Light installation in various locations in the Southeast District, the total length of improvement being 2.455 miles.
(2): Job J9I3572 Route I-155 PEMISCOT County. Light installation on Route U exit 4 and Route 84 exit 6, the total length of improvement being 1.308 miles.

Job J9P3578 Route Various VARIOUS County. Job Order Contract for guard cable and guardrail repairs in various locations in the Southeast District, the total length of improvement being 0 miles.
Job J9P3578B Route Various VARIOUS County. Job Order Contract for guardrail and guard cable repairs in various locations in the Southeast District, the total length of improvement being 0 miles.
« Last Edit: May 06, 2020, 06:40:40 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.