March and April lettings updated with approved bids announced on May 2.
Peace to you, and... don't drive like my brother.

R.P.K.


Sani

Has there been any word about when Phase 3 of the JoCo Gateway and/or the K-10 widening project from 435 to K-7 might get underway? I know Rep. Davids was trying to get federal funding last year, and Gov. Kelly said the K-10 widening would be added to IKE, but I haven't heard anything about them recently.

route56

#302
Approved Bids Announced 7/6/22
Approved Bids Announce 8/4/22

June 2022

There are 21 projects up for letting on June 15.

Federal-Aid

23 TE 0497-01: Construction of a sidewalk along 10th Street from Church Street to Peach Street in Eudora Kansas Heavy Construction LLC, Shawnee, Kansas, $1,794,662.38.

92-44 KA 5413-01: Reconstruction of Union Street from Lake Street to Meridith Lane in McLouth.

24-75 KA 6202-01: 1.5-inch milling, 1.5-inch HMA overlay, and shoulder widening on US 24 from the Riley/Pottawatomie County Line to Shannon Road. Shilling Construction Co. Inc., Manhattan, $2,609,280.74.

70-81 KA 6403-01/70-99 KA 6405-01: Pavement patching from the Geary/Riley County Line to the K-30 interchange in Riley and Wabaunsee Counties. Emery Sapp & Sons Inc. And Subsidiaries, Columbia, Missouri, $2,470,618.00.

32-105 KA 3079-01: Replace the Turner Diagonal bridges over Kaw Drive, including new signage at the Turner Diagonal/Kaw Drive interchange. Unlike other junctions on the Turner Diagonal, the configuration of the junction will not be changed.
32-105 KA 6533-01: Concrete pavement patching and rehabilitation on the Turner Diagonal from Kaw Drive to 55th Street.
Miles Excavating, Inc., Basehor, $23,662,876.65.

73-105 KA 5241-01: Reconstruction of the US 73/K-7 intersection with Parallel Parkway. US 73 will have normal left turns onto Parallel, Parallel will have a "Michigan Left", where all traffic must turn right and make a U-turn to turn left onto US 73 or continue on Parallel. Miles Excavating, $11,091,658.38.

27 C 5059-01: Major collector signage upgrade in Ellsworth County. Signs Up LTD DBA Haren's Trees and Critters, Webster City, Iowa, $168,053.48.

156-27 KA 5415-01: Addition of turn lanes on K-156 at the K-140 junction. (re-let from November 2021) APAC-Kansas Inc. Shears Division, Hutchinson, $774,320.20.

383-69 KA 2371-02: Reconstruction of K-383 between the east junction with US 36 and Almena. Detour via US 36 and US 183. Venture Corporation, Great Bend, Kansas, $15,238,784.53.

42-48 KA 3879-01: Replacement of Bridge #044 on K-42 west of Spivey.

106 KA 6094-01: Signage upgrade on the non-interstate state routes in Harvey County. Martin Outdoor Enterprises Inc., Pittsburg, Kansas, $772,476.50

Federal-Aid, Local Projects:

23 C 5065-01: High friction surface treatment on Douglas County Route 442 near the Shawnee/Douglas County Line and on two curves on Douglas County Route 1055 between Vinland and Baldwin. The Truesdell Corporation, Tempe, Arizona, $525,525.00.

44 C 5057-01: Reconstruction of the intersection of Ferguson Road and Slough Creek Road. Bettis Asphalt & Construction Inc., Topeka, $522,922.90

89 TE 0503-01: Construction of the Deer Creek Trail between SE 25th Street and SE 29th Street in Topeka. Kings Construction Co. Inc., Oskaloosa, Kansas, $625,320.25.

92 C 5072-01: Replace the bridge on 220 Road over Cedar Creek in Smith County. L & M Contractors Inc., Great Bend, Kansas, $529,128.00.

Non-FA:

106 KA 6495-01: ADA Sidewalk ramp upgrades in Gridley and Madison.Burlington Construction, Inc., Burlington, Kansas, $93,616.00.

106 KA 6496-01: ADA Sidewalk ramp upgrades in Oswego, Chetopa, and Baxter Springs. Heck & Wicker Inc., Parsons, $137,303.00.

4 KA 6548-01: Mudjacking the bridge approaches on US 160 over Bear Creek and Bitter Creek, and on K-2 over the Medicine Lodge River.
87 KA 6546-01: Mudjacking at various bridge approaches in and around Wichita.
Raising Solutions LLC, Owensville, Missouri, $322,225.00.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#303
Approved Bids Announced 8/4/22
Approved Bids Announced 8/26/22

At my workplace, a paving crew was resurfacing the service road that leads to the lot where I park. Kansas Highways also need that treatment, as evidenced by the projects in the July lettings.

July 2022

Federal-Aid:

75-43 KA 6566-01/75-7 KA 6567-01: 2-inch milling and 2-inch HMA overlay from Holton to K-9 in Jackson County. 2.5-inch milling and 2-inch HMA overlay from K-9 in Jackson County to 1 mile south of Fairview in Brown County. Bettis Asphalt & Construction Inc., Topeka, $9,171,433.10

20-7 KA 6571-01: 1-inch milling and 1.5-inch HMA overlay from US 75 to Horton. Bettis, $9,171,433.10

16-43 KA 6570-01: 1-inch milling and 1-inch HMA overlay from the Pottawatomie/Jackson County Line to Holton
79-43 KA 6569-01: 1.5-inch milling and 1.5-inch HMA overlay the entire length of K-79 (Non-FA)
16-75 KA 6568-01: 1-inch milling and 1.5-inch HMA overlay from the South junction with K-63 to the Pottawatomie/Jackson County Line (Non-FA)
Bettis, $3,531,016.36.

46 N 0697-01: "Complete Street" configuration of 47th Street between Mission Road and Rainbow Boulevard. Reconfigure 47th from 4 lanes to 3 lanes with a center turn lane and bike lanes. Miles Excavating, Inc., Basehor, $2,437,162.40.

106 KA-6258-01: Signage update on US 59 and K-68 in Franklin County, along with the entire length of K-33 (Interestingly, this project is listed with KDOT District 1, though all but 2 miles of this project is in District 4) CC & I Engineering INC/DBA Compass Consultants, Perham, Minnesota, $1,017,050.72.

36-45 KA 6572-01: 2.5-inch milling and 2-inch HMA overlay from the Smith/Jewell County line to the west junction with K-128.
112-45 KA 6573-01: 1.5-inch HMA overlay along the entire length of K-112 (Non-FA)
APAC-Kansas Inc. Shears Division, Hutchinson, $3,876,645.37.

56-59 KA 6574-01: 3/4-inch milling and 2-inch HMA overlay from the Rice/McPherson County Line to K-153. Pearson Construction LLC, Wichita, $4,783,226.63.

81-72 KA 6575-01: 3/4-inch milling and 2-inch HMA overlay from K-106 to the Ottawa/Cloud County Line. APAC-Kansas, $5,294,791.04.

183Y-26 KA 6576-01: 1.5-inch milling and 1.5-inch HMA overlay on the US 183 Bypass in Hays
183-26 KA 6577-01: 2-inch mainline and 1.5-inch Shoulder HMA Overlay from the Rush/Ellis County line to Hays and 2-inch milling and 2-inch HMA overlay at the junction with the US 183 Bypass in Hays
247-26 KA 6578-01: 2-inch milling and 2-inch HMA overlay on the entire length of K-247 (listed here as .290 Miles in length) (Non-FA)
Venture Corporation, Great Bend, $7,301,921.45.

70-55 KA 6521-01/70-32 KA 6522-01: 2.5-inch milling, 2-inch inlay, and 1.5-inch HMA overlay on I-70 from the Thomas/Logan County line to K-23 in Logan and Gove Counties. Venture Corporation, $22,813,889.40.

63 TE 0491-01: Extension of the Coffeyville Rail Trail and Safe Routes to School sidewalk construction in Coffeyville. Heck & Wicker Inc., Parsons, $1,231,929.26.

61-76 KA 6581-01/61-78 KA 6582-01: 3/4-inch milling and 2-inch HMA overlay from US 54 to Arlington in Pratt and Reno Counties. APAC-Kansas, $10,379,622.70.

50-78 KA 6580-01: 2-inch milling and 2-inch HMA overlay from the west junction with K-61 to the west junction with K-14/K-96. Pearson Construction LLC, Wichita, $4,619,139.70.

80 C 5063-01: Major collector signage update in Rice County. Signs Up LTD DBA Haren's Trees and Critters, Webster City, Iowa, $174,375.51.

94 C 5068-01: Major collector signage update in Stanton County. Signs Up, $142,604.82.

Federal-Aid, Local Projects:

3 C 5110-01: Replace the Meade Road bridge over Stranger Creek near Cummings. B & B Bridge Company LLC, St. Paul, Kansas, $734,878.04.

19 C-5067-01: Add a "Safety wedge" to 260th Street from K-126 to US 160 east of Pittsburg and Frontenac. B & B Bridge Company, $219,941.82.

63 C 5060-01: Reconstruct a short section of Peter Pan Road just outside of Independence. Mission Construction Co. Inc., St. Paul, Kansas, $844,243.70.

Non-FA:

16-44 KA 6643-01: Surface Recycle And Chip Seal from the Jackson/Jefferson County Line to the north junction with US 59, excluding the concurrency with K-4 near Valley Falls. Dustrol Inc., Towanda, $2,382,660.01.

130-56 KA 6649-01: Microsufacing the entire length of K-130. Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $595,765.52.

70 KA 6646-01: Combined project to chip seal K-68 from US 75 to K-268 (68-70 KA 6647-01) and the entire length of K-368 (368-70 KA 6648-01) Vance Brothers, $564,155.43.

16-75 KA 6641-01: Chip Seal from the north junction with K-99 to the north junction with K-63. Dustrol, $2,685,375.77.

63-75 KA 6642-01: Microsufacing from the South junction with K-16 to the Pottawatomie/Nemaha County Line. Vance Brothers, $1,026,838.33.

141-27 KA 6657-01: Chip Seal along the entire length of K-141. Circle C Paving and Construction LLC, Goddard, Kansas, $547,024.40.

106 KA 6650-01: 1.5-inch milling and 1.5-inch HMA overlay on K-189 (189-15 KA 6652-01) and K-209 (209-21 KA 6654-01/209-64 KA 6655-01) and a 5/8-inch milling and 1.5-inch HMA overlay on K-244 Spur (244Y-31 KA 6653-01) Shilling Construction Co. Inc., Manhattan, Kansas, $885,434.00.

232-84 KA 6667-01: Chip Seal from the Lincoln/Russell County line to K-18. Heft and Sons LLC, Greensburg, $462,255.80.

98 KA 6661-01: 2-inch milling and 2-inch HMA overlay on the entire length of US 40B in WaKeeney (40B-98 KA 6662-01/283-98 KA 6663-01) and a 1600-foot stretch of K-147 at P Road (147-98 KA 6665-01); 1-inch milling and 2-inch overlay on the entire length of K-198 (198-98 KA 6664-01) APAC-Kansas, $5,294,791.04.

147-98 KA 6666-01: Chip Seal on K-147 in Trego County, excluding the 1600-foot segment at P Road (which is part of the overlay project KA 6661-01) Heft and Sons, $1,816,203.22.

54-8 KA 6523-01: Repair a damaged beam on the Haverhill Road bridge over US 54-77-400. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $34,842.60.

160-39 KA 6547-01: Crack Sealing on US 160 from K-2 to the Harper/Sumner County Line. Pavement Pro's LLC, McPherson, $96,150.68.

4-83 KA 6552-01: Crack Sealing on K-4 from the Ness/Rush County line to La Crosse. Scodeller Construction Inc., Wixom, Michigan, $244,807.18.

15-106 KA 6554-01: Crack Sealing on K-15 from Udall to Mulvane in Cowley and Sumner Counties. Pavement Pro's, $83,759.86.

183-106 KA 6597-01: Crack Sealing on US 183 from Coldwater to Greensburg in Commanche and Kiowa Counties. Scodeller, $286,024.56.

400-29 KA 6674-01: Chip seal on US 400 from Ford to the Ford/Kiowa County Line. Heft and Sons, $495,064.30.

160-106 KA 6670-01: Chip Seal on US 160 from the North Junction with K-27 to Ulysses in Stanton and Grant Counties. Vance Brothers, $2,512,682.19.

25-47 KA 6673-01: Surface recycle and chip seal on K-25 from US 50 to the Kearny/Wichita County Line.  Dustrol, $2,548,919.08.

23-60 KA 6675-01: Chip Seal on K-23 from the Oklahoma State Line to Meade. Heft and Sons, $1,064,335.60.
Peace to you, and... don't drive like my brother.

R.P.K.

kphoger

This is the first time I've heard of Microsurfacing.  A Google search reveals that it's similar to slurry sealing, which is a term I hadn't heard of before this year either.

Keep learning!
Keep right except to pass.  Yes.  You.
Visit scenic Orleans County, NY!
Male pronouns, please.

Quote from: Philip K. DickIf you can control the meaning of words, you can control the people who must use them.

route56

May and June lettings updated with awarded bids announced on July 6.
Peace to you, and... don't drive like my brother.

R.P.K.

Ned Weasel

Quote from: route56 on June 22, 2022, 11:17:55 PM
46 N 0697-01: "Complete Street" configuration of 47th Street between Mission Road and Rainbow Boulevard. Reconfigure 47th from 4 lanes to 3 lanes with a center turn lane and bike lanes.

While they're at it, I really wish Johnson and Wyandotte Counties could agree on a name that doesn't end in "Street," since numbered "streets" are north-south in Wyandotte County and east-west in Johnson County.  They really should just agree to call it 47th Avenue or County Line Road.  I don't care which as long as they're consistent about it.
"I was raised by a cup of coffee." - Strong Bad imitating Homsar

Disclaimer: Views I express are my own and don't reflect any employer or associated entity.

Scott5114

It's simple–the north half of the street is County Line Road and the southern half of the street is 47th Street.

I tend to just call it County Line Road because Johnson County can suck an egg.
uncontrollable freak sardine salad chef

route56

#308
Approved Bids Announced 8/26/22
Approved Bids Announced 10/6/22


August 2022

Up for letting on August 17 are 38 projects, including a second batch of asphalt milling and overlay.

Federal-Aid (unless noted):

36-22 KA 6588-01: 1.5-inch milling and 1.5-inch HMA overlay on Asphalt sections and 1-inch RCI and 3-inch HMA overlay on concrete sections of the four-lane segment of US 36 between Wathena and the Missouri River Bridge. Herzog Contracting Corp., Saint Joseph, Missouri, $7,549,734.30.

50-56 KA 5412-01: Partial reconstruction of 6th and Prairie Streets in Emporia, including new FYA signals. Killough Construction, Inc., Ottawa, $774,411.25.

31-70 KA 6585-01: 1.5-inch milling and 1.5-inch HMA overlay from the Wabaunsee/Osage County line to Burlingame. Killough, $1,463,468.20.

4-89 KA 5483-02: Guardrail replacement on the Oakland Expressway in Topeka from I-70 to the Shunganunga Creek bridge. Bettis Asphalt & Construction Inc., Topeka, $315,837.75.

4-99 KA 6586-01: 1-inch milling and 1.5-inch HMA overlay from the Geary/Wabaunsee County Line to Eskridge. Shilling Construction Co. Inc., Manhattan, $3,777,814.10.

36-45 KA 6587-01: 3/4-inch milling and 1.5-inch HMA overlay from Mankato east ~ 8 miles
199-79 KA 6590-01: 1/2-inch milling and 1.5-inch HMA overlay on the entire length of the K-199 spur in Republic County (Non-FA)
Hall Brothers Inc., Marysville, Kansas, $3,204,536.55.

77-57 KA 6593-01: 2-inch milling and 1.5-inch HMA overlay from the Butler/Marion County line to Florence. Bettis, $2,920,987.87.

56-64 KA 6592-01: 1/2-inch milling and 1.5-inch HMA overlay from the Dickinson/Morris County Line to Council Grove.
56-21 KA 6591-01: 1.5-inch milling and 1.5-inch HMA overlay from the north junction with US 77 to the Dickinson/Morris County Line (Non-FA)
Shilling, $4,310,741.02.

24-97 KA 6542-01: Lighting upgrade at the US 24/US 83 junction. Phillips Southern Electric Company Inc., Wichita, $47,627.00.

166B-10 KA 6596-01: 1.5-inch milling and 1.5-inch HMA overlay on the rural segments of US 166B
99-10 KA 6600-01: 1.5-inch milling and 1.5-inch HMA overlay from the Oklahoma State Line to US 166
Bettis, $2,241,808.94.

19 KA 5985-01: Storm Sewer improvements and reconstruction of West Street (US 69B) in Arma. Heck & Wicker, Inc., Parsons, $1,127,130.00.

281-5 KA 6605-01: 3/4-inch milling and 2-inch HMA overlay from the west junction with K-4 to the Barton/Russell County Line. Venture Corporation, Great Bend, Kansas, $2,067,678.25.

56-24 KA 6604-01/56-73 KA 6602-01: 3/4-inch milling and 2-inch HMA overlay from Kinsley to the Pawnee/Barton County Line (Pawnee County segment is non-FA) Venture, $8,719,695.80.

106 KA 6267-01: Signage upgrade in Pawnee County. Apparently, there are a few rogue W11-3 Deer Crossing signs that KDOT has marked as to be removed with the note "There are NO approved Deer Warning sign installations within the project area." CC & I Engineering Inc./ OBA Compass Consultants, Perham, Minnesota, $444,006.24.

42 C 5121-01: Signage and pavement marking upgrade on three short segments of road in Hodgeman County. Roadsafe Traffic Systems Inc., El Dorado, $37,113.45.

96-51 KA 6607-01/96-86 KA 6606-01: 1/2-inch milling and 1.5-inch HMA overlay from Scott City to Dighton. Venture, $9,412,347.45.

4-51 KA 6612-01/4-86 KA 6611-01: 1/2-inch milling and 1.5-inch HMA overlay from US 83 to the east junction with K-23. Venture, $6,140,531.20.

283-68 KA 6608-01: 1.5-inch HMA overlay on US 283 from Ness City to the Ness/Trego County Line
96-68 KA 6609-01: 1/2-inch milling and 1.5-inch HMA overlay on K-96 from Ness City to the Ness/Rush County Line
4-68 KA 6610-01: 1/2-inch milling and 1.5-inch HMA overlay on K-4 from US 283 to the Ness/Rush County Line (excluding Brownell)
Venture, $15,259,552.45.

Federal-Aid, local projects:

72 C 5064-01: Realignment of a Limestone Road east of Minneapolis. Bruce Davis Construction LLC, Emporia, $754,514.49.

74 C 5113-01: Bridge replacement on Yankee Road southwest of Logan. Klaver Construction Company Inc., Wichita, $526,653.31.

35 C 5062-01: Re-grade the side slopes on 11 Road and 13 Road near Ingalls. MJE LLC, Montezuma, $1,718,669.00.

Non-FA:

81 KA 6677-01: 1.5-inch milling and 1.5-inch HMA overlay on US 24 from the Clay/Riley County Line to Leonardville and US 77 from the Geary/Riley County Line to Leonardville. Shilling, $5,265,605.00.

106 KA 5777-01: ITS upgrade at various sites throughout the state. Phillips Southern, $4,150,073.50.

9-106 KA 6680-01: 1-inch Surface recycle and chip seal on K-9 from K-63 to US 75. Dustrol Inc., Towanda, $2,289,515.57.

5-106 KA 6683-01: 1.5-inch milling and 1.5-inch HMA overlay on K-5 from the North junction with I-435 in KCK to US 73/K-7 in Leavenworth. Superior Bowen Asphalt Company LLC, Kansas City, Missouri, $2,718,802.63.

99 KA 6687-01: 3/4-inch milling and 1.5-inch HMA overlay on K-185 and K-138, along with an I-70 frontage road. Shilling, $625,935.22.

36-77 KA 6691-01: 2-inch surface recycle and chip seal from the Cheyenne/Rawlins County Line to 11 Road. Dustrol, $1,683,903.34.

27-91 KA 6686-01: 2-inch milling and 2-inch HMA overlay on a 1-mile segment of K-27 about 5 miles north of the Wallace/Sherman County Line. McCormick Excavation & Paving LLC, Stratton, Colorado, $308,693.54.

254-87 KA 6601-01: 1.5-inch milling and 2-inch HMA overlay from Hydraulic to 159th Street. Cornejo & Sons LLC, Wichita, Kansas, $6,026,867.33.

400-29 KA 6534-01: Repair the Marshall Road bridge over the US 400 bypass on the west side of Dodge City. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $44,815.44.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

Finally got around to updating the June and July posts with the bids awarded on August 4.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#310
Awarded Bids Announced 10/6/22
Awarded Bids Announced 11/9/22

September 2022

There are 43 projects up for letting in September.

Federal-Aid:

106 KA 6255-01: Signage replacement on the highways maintained by KDOT District 1 in Osage County. [I-35, along with the segment of K-31 south of the east I-35/K-31 junction, is maintained by KDOT District 4] CC & I Engineering Inc. /DBA Compass Consultants, Perham, Minnesota, $1,231,018.37.

14-45 KA 6614-01/14-62 KA 6613-01: 1/2-inch milling and 1.5-inch HMA overlay from the Lincoln/Mitchell County line to the South City Limits of Beloit, and from the North City Limits of Beloit to US 36 in Mitchell and Jewell Counties.
APAC-Kansas Inc. Shears Division, Hutchinson, $8,835,887.35.

26 C 5125-01: Signage and pavement marking updates at Old US 40 and Cathedrial Avenue/Pfeifer Road in Victoria and Old US 40 and Walker Avenue in eastern Ellis County. Roadsafe Traffic Systems Inc., El Dorado, $74,650.29.

25-55 KA 6618-01: 1-inch milling and 2-inch HMA overlay from MP 145.88 to Russell Springs, and 1.5-inch overlay from Russell Springs to US 40. APAC-Kansas, $4,992,508.57.

36-69 KA 6615-01: 1-inch milling and 2-inch HMA overlay from the Decatur/Norton County line to the west junction with K-383.
36-69 KA-6616-01: 1.5-inch milling and 1.5-inch HMA overlay from the west junction with K-383 to West Street in Norton
261-69 KA 6617-01: 2-inch milling and 2-inch HMA overlay on the entire length of K-261 (Non-FA)
APAC-Kansas, $5,996,178.23.

98 C 5066-01: Signage upgrades on all collector roads in Trego County. CC & I Engineering, $346,041.00.

54-37 KA 6595-01: 1.5-inch HMA overlay from the Butler/Greenwood County line to K-99, excluding through Eureka. APAC-Kansas, $3,508,489.53.

59-50 KA 6625-01: 1-inch milling and 2-inch HMA overlay on the US 59/US 160 concurrency. Bettis Asphalt & Construction Inc., Topeka, $2,762,793.53.

69-54 KA 6543-01: Lighting upgrades at the US 69/K-152 junction. Phillips Southern Electric Company Inc., Wichita, $255,983.00.

39-67 KA 6621-01: 1.5-inch milling and 2-inch HMA overlay from Irving Road to US 59.
59-67 KA 6622-01: 1.5-inch milling and 2-inch HMA overlay fromn the US 59/K-39 junction to the Neosho/Allen County Line.
Bettis, $4,606,859.21.

106 KA 6266-01: Signage updates on portions of US 75, K-58, K-31, and K-131 in Coffey County. Signs Up LTD DBA Haren's Trees and Critters, Webster City, Iowa, $178,555.50.

177-8 KA 6628-01: 1/2-inch milling and 1.5-inch HMA overlay and new gravel on shoulders of K-177 from US 54 to the Butler/Chase County Line. APAC-Kansas, $3,331,367.87.

54-48 KA 6626-01/54-48 KA 6845-01: Pavement patching and pavment marking replacment on the US 54-400 bypass of Cummingham. Iowa Civil Contracting Inc., Victor, Iowa, $1,720,773.84.

80 TE 0504-01: New pedestrian and bicycle path along Cleveland Avenue from Broadway to 1st Street in Sterling. Multicon Inc., Wichita, $316,569.30.

281-93 KA 6627-01: 1.5-inch surface recycle and chip seal from US 50 to K-19. Dustrol Inc., Towanda, $2,097,974.64.

50-28 KA 5432-01: Partial reconstruction to imporve Drainage on Fulton Street (US 50B) between Washington and Center Streets in Garden City. Smoky Hill LLC, Salina, $2,206,032.65

56-29 KA 5423-01: Reconstruction of the US 56-283/Trail Street (US 400) intersection to include a double-left turn lane from Westbound US 56/Southbound US 283 to Eastbound Trail Street.

160-34 KA 5986-01: Reconstruction of Oklahoma Street from Comanche Street to Cheyenne Street in Ulysses

56-41 KA 5997-01: Reconstruction of a 1-block segment of La Lande Avenue in Sublette.

54-60 KA 6629-01: 1/2-inch milling and 2-inch HMA mainline overlay and 2-inch shoulder overlay from 1.8 miles east of the Seward/Meade County Line to the West City Limits of Meade. APAC-Kansas, $6,776,705.10.

96-102 KA 3274-01: Reconstruction of Broadway Avenue and associated water line installation in Leoti.
Koss Construction Co., Topeka, $8,177,969.90


Federal-Aid, local projects:

25 C 5080-01: Replace This Bridge over the Elk River northwest of Howard.

8 C 4935-01: Reconstruct Butler Road from K-254 west of Benton north ~ 2 miles. Alan's Exavating, Inc., Augusta, $2,289,973.85

87 C 5077-01: Replace the Culvert on 21st Street over Rock Creek just downstream of Cheney Reservoir.

Non-FA:

59-23 KA 6692-01: 1-inch milling and 1.5-inch HMA overlay from N 1100 Road to K-10 and 2-inch milling and 2-inch overlay on Pleasant Grove hill.
Bettis, $1,567,755.18.

106 KA 6700-01: 3/4-inch milling and 1.5-inch HMA overlay on the entire length of K-13 in Riley and Pottawatomie Counties. Shilling Construction Co. Inc., Manhattan, $3,844,683.48.

36-79 KA 6743-01: Crack Sealing from the Jewell/Republic County Line to 2 miles west of Belleville
36-101 KA 6742-01: Crack sealing from the Republic/Washington County Line to K-22.
Pavement Pro's LLC, McPherson, $150,490.50.

232-106 KA 6658-01: Chip sealing from Old US 40 to the Lincoln/Russell County Line in Ellsworth and Lincoln Counties.

106 KA 6703-01: 3/4-inch milling and 1.5-inch HMA overlay on K-14 from I-70 to the Lincoln/Mitchell County line and on the entire length of K-284. APAC-Kansas, $6,634,720.19.

383-69 KA 6717-01: Bridge repair on Bridge #022, 3.87 miles northeast of the Decatur/Norton County Line. PCI Roads, LLC, Saint Michael, Minnesota, $399,195.00.

31-2 KA 6785-01/31-16 KA 6786-01: Chip Sealing from near Old US 50 north of Waverly to Garnett in Coffey and Anderson Counties. Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $1,565,371.62.

7-19 KA 6490-01: Full-depth reconstruction of a one-block segment of Summit Street in Girard. Official detour via K-47 and US 69. Mission Construction Co. Inc., St. Paul, Kansas, $388,686.00.

59-50 KA 6709-01: 2-inch milling and 2-inch HMA overlay from US 160 to Parsons. Bettis, $2,302,998.66.

400-103 KA 6784-01: Crack Sealing on US 400 from Fredonia to Neodesha. PCI Roads, LLC, Saint Michael, Minnesota, $343,618.28.

96-86 KA 3258-01: Reconstruction of 5th Street from Ora to Church Street and from College Street to Jefferson Street in Scott City. Vogts-Parga Construction, LLC, Newton, $8,103,591.41
Peace to you, and... don't drive like my brother.

R.P.K.

route56

July and August lettings are updated with awarded bids announce on August 26.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#312
Awarded bids announced 11/9/22
Awarded bids announced 11/30/22
Awarded bid announced 1/9/23

October 2022

There are 26 projects up for bids on October 19.

Federal-Aid (Unless noted):

23 TE 0472-02: Maple Leaf Trail Phase 1: Pedestrian path along the east side of the Midland Railway storage track from High Street to Elm Street in Baldwin City. Bettis Asphalt & Construction Inc., Topeka, $699,036.25.

46 N 0703-01: Pedestrian and bicycle paths on Center Street bridge over BNSF and on the west side of Center Street from Shawnee Street to McKinley Street in Gardner. (no plans)

70 TE 0481-01: Construction of the Flint Hills Nature Trail in Osage City. Because the former Missouri Pacific right of way used by the trail crosses the BNSF Topeka Sub away from roads, the path of the trail will follow 5th Street south to Holliday Street, then east along Holliday to 8th, North on 8th to Lakin, East on Lakin to 9th, then North on 9th back to the MoPac ROW. (no plans) Bettis, $1,847,358.60

106 N 0716-01: MARC - operation green light ITS upgrades along 135th Street. Although the county code would indicate a multi-county project, this project is entirely in Johnson County. Custom Lighting Services LLC DBA Black and McDonald, Kansas City, Missouri, $764,026.00

9 U 2403-01: Safe routes to school sidewalk improvements in Strong City. Prado Construction LLC, Valley Center, $790,626.08.

59-2 KA 5422-01: Curb replacement and resurfacing on Maple Street from 4th Street to Redbud Ave in Garnett. Bettis, $1,554,874.55.

35-16 KA 6125-01: Repair the I-35 bridges over the BNSF Emporia Sub northeast of Lebo. PCI Roads, LLC, Saint Michael, Minnesota, $1,847,358.60

106 KA 6259-01: Signage replacement on the state highways in Wilson County. There are a total 2,037 signs in this project. Martin Outdoor Enterprises Inc., Pittsburg, $722,813.30

54-8 KA 6640-01: Ultrathin bonded asphalt surfacing on US 54-400 in Andover. Pearson Construction LLC, Wichita, $3,355,053.70

8 N 0692-01: reconstruction of 159th Street from Kellogg to Central Avenue. Pearson, $5,511,222.11.

15-87 KA 6710-01: Pavement Patching on K-15 from the Kansas Turnpike bridges in Wichita to the Derby City Limits (non-FA)
15-87 KA 6846-01: Pavement marking on K-15 from Clifton Avenue to the Derby City Limits. The plans specify that this is to be done after the associated pavement patching project above is completed.
Prado, $2,993,440.20

23-35 KA 6634-01/23-28 KA 6635-01: 1/2-inch milling and 1.5-inch HMA overlay from Cimarron to the K-156 in Gray and Finney Counties (Finney County segment is non-FA.) Venture Corporation, Great Bend, $3,442,046.60.

65 C 5124-01: Installation of Stop Ahead and Stop signs with solar-powered flashing LEDs and rumble strip grinding on D Road at 16th and 24th Road in Morton County. Cooper Construction LLC, Emporia, $61,154.00.

83-88 KA 3253-01: Grading, bridge and surfacing on US-83 from 0.256 MI south of RS 933 north to US-160 in Seward County (no plans) J & R Sand Company, Inc., Liberal, $18,979,543.32

Federal-Aid: Local Projects:

99 C 5112-01: Replace This bridge over Mill Creek east of Maple Hill. A M Cohron & Son Inc., Atlantic, Iowa, $1,807,094.15.

57 C 5069-01: Regrade, re-surface, and install rumble strips on Nighthawk Road at the intersection with K-256. Bruce Davis Construction LLC, Emporia, $333,977.10.

1 C 5001-01: Grading and culvert on 2000 Road near South Dakota Road northeast of Iola. J & J Contractors Inc., Iola, $235,798.30.

63 C 5082-01: Replace this bridge on 3000 Road over Illinois Creek in Montgomery County. B & B Bridge Company LLC, St. Paul, $988,276.50.

78 C 5116-01: Replace the 56th Avenue Bridge over Cow Creek. King Construction Company Inc. & Subsidiaries, Hesston, Kansas, $970,188.30.

Non-FA:

70-106 KA 6806-01: Concrete Pavement Patching on various bridges on I-70 in Ellsworth, Lincoln, and Saline Counties.

70-91 KA 6539-01: Lighting replacement at the K-267 interchange and the westbound rest area west of Ruleton. Phillips Southern Electric Company Inc., Wichita, $219,711.00

169-2 KA 6668-01: Microsurfacing on US 169 between Garnett and the Anderson/Franklin County Line. Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $2,225,604.34

99-37 KA 6669-01: Chip seal on K-99 between US 400 and US 54. Circle C Paving and Construction LLC, Goddard, $679,802.82.

49-96 KA 6711-01: 2-inch milling and 1.5-inch HMA overlay from US 81 to US 160. Pearson, $2,537,466.00
Peace to you, and... don't drive like my brother.

R.P.K.

route56

August and September lettings posts updated with awarded bids announced on October 6
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#314
Awarded bids announced 11/30/22

There are only 16 projects up for letting on November 17, but one of them is a big-ticket item: the next phase of improvements to the I-135/I-235/K-254/K-96 junction on the north side of Wichita.

Federal-Aid:

24-44 KA 5105-01: Resurfacing of US 24 from K-237 to Perry and the replacement of the US 24 bridge over the Delaware River on the west side of Perry. Bettis Asphalt & Construction Inc., Topeka, $12,613,929.42.

39-6 KA 3908-01: Replace the K-39 bridge over Owl Creek near the K-3 junction. Bridge to be built one half of a time with traffic alternating across the zone controlled by signals. Bridges Inc., Newton, $1,992,442.43.

3-6 KA 3909-01: Replace the K-3 bridge over Paint Creek, just south of the K-39 junction. Detour via K-47, K-7, and K-39. Bridges Inc., $1,824,955.40.

47-19 KA 6624-01/47-67 KA 6623-01: 2-inch milling and 1-inch HMA overlay from St. Paul to Girard in Neosho and Crawford Counties. Bettis, $5,285,482.51.

59-30 KA 6579-01: 1-inch RCI and 3-inch HMA overlay on the US 59 freeway from I-35 to the Franklin/Douglas County Line. Bettis, $15,177,572.95.

400-37 KA 6594-01: 3-inch HMA overlay from the east junction with K-99 to the Greenwood/Wilson County line (a Reflective Crack interlayer is not specified, though I believe this section of US 400 has a concrete base) APAC-Kansas Inc. Shears Division, Hutchinson, $12,927,592.19.

40 C 5136-01: Installation of new Stop, Yield, Stop Ahead, and Yield Ahead signs at 28 intersections in Harvey County. Cooper Construction LLC, Emporia, Kansas, $29,144.20.

50-40 KA 1827-05: Extend the existing passing lane on US 50 near Halstead for 0.8 mile. Pearson Construction LLC, Wichita, $1,954,995.79.

235-87 KA 3232-02 I-135/I-235 north junction Gold Project Phase 2B. Bergkamp King, A Joint Venture, LLC, Wichita, $140,775,519.17.

Federal-Aid, Local Projects:

22 C 4999-01: Replace the 195th Road/Old US 36 bridge over Peters Creek east of Troy.

39 C 5005-01: Replace the 30th Road bridge over Rush Creek northwest of Anthony. L & M Contractors Inc., Great Bend, $929,127.75.

Non-FA:

24-52 KA 6564-01: Sidewalk ramp improvements at the intersection of US 24-40 and 4th Street and at US 24-40 and Star Drive in Tonganoxie. Gunter Construction Company, Kansas City, Kansas, $215,155.00.

69-11 KA 6708-01: 1.5-inch milling and 2-inch HMA overlay on US 69 from the Oklahoma State Line to Columbus. Emery Sapp & Sons Inc. And Subsidiaries, Columbia, Missouri, $3,282,750.10.

47-67 KA 6707-01: Two 1-inch HMA overlays on K-47 from US 169 to US 59. Bettis, $2,863,827.07.

50-78 KA 6719-01: Repairs on the US 50 bridge over the BNSF La Junta Sub/UP Pratt Sub/K-61 at the west junction with K-61. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $123,305.40.
Peace to you, and... don't drive like my brother.

R.P.K.

kphoger

Quote from: route56 on October 20, 2022, 11:03:19 PM
the next phase of improvements to the I-135/I-235/K-254/K-96 junction on the north side of Wichita

It can't come soon enough!  This interchange is part of my daily commute–although, fortunately, my commute is opposite rush-hour traffic, so I'm rarely caught up in the traffic jams.
Keep right except to pass.  Yes.  You.
Visit scenic Orleans County, NY!
Male pronouns, please.

Quote from: Philip K. DickIf you can control the meaning of words, you can control the people who must use them.

route56

 September and October lettings posts updated with awarded bids reported on KDOT's Bid Tabs page as of November 1.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#317
December 2022

Awarded bids announced 1/9/23

There are 29 projects up for bids on December 14, including three bridge replacements, the removal of an unused bridge, and a new roundabout near Dodge City.

Federal-Aid (unless otherwise noted):

92-44 KA 5413-01: Full-depth patching and mill/overlay on Union St from Lake St to Meredith Ln in McLouth. Sands Construction LLC, Leavenworth, $648,218.40.

75-70 KA 3899-01: Remove the old US 75 bridge over Dragoon Creek and add a Cul-de-Sac turnaround on the former south approach.
75-70 KA 3900-01: Remove a culvert on the old US 75 alignment north of the Dragoon Creek bridge and construct a new section of 209th Street to connect US 75 to Old 75.
Killough Construction Inc., Ottawa, $992,479.76.

70-105 KA 6800-01: Asphalt and PCCP patching and 2 1.5-inch overlays on I-70 from the east approach to Quarry Road (west of I-635) to .64 mile east of Kaw Drive in Kansas City.
69-105 KA 6676-01: Asphalt and PCCP patching, bridge deck patching, barrier wall repair, 2-inch mainline HMA Overlay, and 2.5-inch shoulder HMA overlay on the 18th Street Expressway in Wyandotte County.
Superior Bowen Asphalt Company LLC, Kansas City, Missouri, $15,602,388.80.

35-105 KA 6801-01: PCCP Patching and 4-inch overlay on Northbound I-35 from Lamar to Southwest Boulevard and Southbound I-35 from Cambridge Circle to Southwest Boulevard, 2-inch milling and 2-inch overlay on Southbound I-35 from Southwest Boulevard to Lamar, and PCCP patching and joint sealing (no overlay) on Northbound I-35 from Southwest Boulevard to the Cambridge Circle. Superior Bowen, $10,832,352.05.

31 TE 0498-01: New pedestrian/bike path along the north side of K-18 from Karns Dr to Spring Valley Rd in Junction City. Ebert Construction Co. Inc. & Subsidiary, Wamego, $1,158,613.68.

81-72 KA 6057-01: 1.5-inch milling and 1.5-inch overlay on Northbound US 81 from MP 167.2 to MP 176.1 and Southbound US 81 from MP 169.6 to MP 167.2. APAC-Kansas Inc. Shears Division, Hutchinson, $8,922,876.73.

69-19 KA 3928-01: Replacement of the southbound US-69 Bridge over First Cow Creek Drainage located just north of the north junction of US-69 and US 160 near Frontenac. Traffic to move head-to-head on the northbound bridge. Mission Construction Co. Inc., St. Paul, Kansas, $1,666,387.63.

400-37 KA 5790-01: Add Passing lanes in both directions on US 400 from MP 334.2 to MP 336.1. Traffic is to be carried through the work zone. APAC-Kansas Inc, $9,347,358.53.

152-54 KA 6318-01: 1.5-inch milling and 1.5-inch HMA overlay along then entire length of K-152. Superior Bowen, $2,819,604.07.

169-67 KA 5788-01: Add passing lanes in both directions on US 169 from 0.7 miles north of K-47 north 1.8 miles. Traffic is to be carried through the work zone. Clarkson Construction Company, Kansas City, Missouri, $6,592,327.12.

169-67 KA 5789-01/169-67 KA 5789-02: Full-depth reconstruction of US 169 from the Labette/Neosho County Line to Thayer, with passing lanes from MP 30.6 to MP 32.4. Detour via US 400, US 59, and K-47. Clarkson, $15,073,904.28.

54-49 KA 6636-01 2-inch milling and 2-inch overlay from Greensburg to the Kiowa/Pratt County Line Venture Corporation, Great Bend, $3,272,568.60.

54-76 KA 6637-01: Ultrathin Bonded Asphalt Surface from the Kiowa/Pratt County Line to Pratt. Venture, $2,578,918.80.

106 KA 6263-01: Signage update on K-14 and K-96 South of Hutchinson in Reno County. Cooper Construction LLC, Emporia, $815,656.50.

56-35 KA 6631-01/56-29 KA 6633-01: 1.5-inch milling and 1.5-inch HMA overlay from Montezuma to the west junction with US 283 south of Dodge City. (Ford County segment is Non-FA)
400-29 KA 6630-01: 1.5-inch milling and 1.5-inch HMA overlay on the US 400 bypass on the west side of Dodge City.
Venture, $8,068,406.40.

Federal-Aid, Local Projects:

24 C 5076-01: Replace the W Road bridge over Rattlesnake Creek. Reece Construction Company, Inc., Salina, $476,265.93.

40 C 5075-01: Replace the SE 60th Street bridge over Gypsum creek just northwest of Whitewater. Dondlinger & Sons Construction Co. Inc., Wichita, $661,672.41.

Non-FA:

106 KA 6695-01: 1-inch milling and 1.5-inch HMA overlay on the entire length of K-187, 2.5-inch milling and 2-inch HMA overlay on the entire length of K-110, 1.5-inch milling and 1.5-inch HMA overlay on the entire length of K-178, 3/4-inch milling and 1.5-inch HMA overlay on the entire length of K-236. Hall Brothers Inc., Marysville, $3,183,730.76.

70-27 KA 6538-01: Replace 6 light towers on I-70 at K-232 and Ellsworth rest areas in Ellsworth County. Cooper Construction LLC, Emporia, $284,611.50.

232-106 KA 6658-01: Chip Seal on K-232 from Old US 40 in Wilson to the Lincoln/Russell County Line in Ellsworth and Lincoln Counties. Heft and Sons LLC, Greensburg, $396,991.00.

70-106 KA 6806-01: Concrete Pavement (bridge deck resurfacing?) on 12 bridges in Ellsworth, Lincoln, and Saline Counties. Bettis Asphalt & Construction Inc., Topeka, $5,619,722.50.

24-33 KA 6720-01: Repair the bridge over Sand Creek west of Hill City. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $717,220.80.

56-29 KA 6526-01: Reconstruct Outlaw Road and 112 Road south of Dodge City so with an east-to-north curve between Outlaw Road and 112 Road.
56-29 KA 6526-02: Construct a Roundabout at the US 56/US 283 junction south of Dodge City.
Koss Construction Co., Topeka, $18,170,952.67.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#318
October and November lettings updated with awarded bids announced on November 30.

The big Wichita project was awarded for a cool $140.8 million. I am presuming that the partners in the "Bergkamp King" joint venture are Bob Bergkamp Construction of Wichita and King Construction Company of Hesston.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#319
January 2023

Awarded bids annouced 1/26/23

There are 23 projects up for bids on January 18

Federal-Aid:

73-3 KA 3889-01: Replacement of Bridge #014 over Walnut Creek Drainage on US 73/K-7 in southern Atchison County. One lane of traffic to be carried through the work zone, controlled by signals.

435-46 KA 5500-02: Guardrail upgrades on I-435 from K-10 to Midland Drive. Bettis Asphalt & Construction Inc., Topeka, $256,299.00

635-46 KA 5501-02: Guardrail upgrades on I-635 in Johnson County. Bettis, $199,011.50.

106 KA 6254-01: Signage Upgrade on US 24 from US 75 to Perry, K-4 from US 40 to K-92, and US 40 from K-4 to the Shawnee/Douglas County Line. Cooper Construction LLC, Emporia, $1,180,668.83.

635-105 KA 5502-02: Guardrail upgrades on I-635 from the Wyandotte/Johnson County Line north to the south approach of the BNSF Railroad Bridges and from 750 feet north of 43rd Street north to the I-635/K-5 junction. Bettis, $85,084.00.

40-55 KA 6638-01: 2-inch milling and 2-inch HMA overlay from 500ft east of the east junction with K-25 to the beginning of PCCP at the west US 83/US 40 junction. McCormick Excavation & Paving LLC, Stratton, Colorado, $2,093,578.68.

281-84 KA 6639-01: Ultrathin bonded asphalt surfacing on US 281 from the Barton/Russell County Line to Russell. Venture Corporation, Great Bend, $2,539,583.60.

281-92 KA 3937-01: replacement of the US 281/K-9 over Lindley Creek, located 0.13 miles West of the Osborne County Line near Portis. Detour via US 281, US 36, K-181, and US 24. L & M Contractors Inc., Great Bend, $1,876,892.18.

106 KA 6265-01: Singage upgrades on K-23, K-23A, the K-23 spur, K-211, and K-216, primarally in Gove County. Martin Outdoor Enterprises Inc., Pittsburg, $193,223.50.

69B-19 KA 5985-01: Storm Sewer improvements and reconstruction of West Street (US 69B) in Arma. I show this project as previously having been awarded in August.

166-18 KA 6774-01: Repair the Walnut River bridge east of Arkansas City. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $789,867.29.

235-87 KA 6844-01: Concrete patching on I-235 except for the segment between the north junction with Broadway and the North junction with I-135. Emery Sapp & Sons Inc. and Subsidiaries, Columbia, Missouri, $5,073,250.50.

23-28 KA 6880-01: 2.5-inch milling and 2.5-inch plus 1.5-inch overlay on K-23 from K-156 to the Finney/Lane County Line. Venture, $2,539,583.60.

13 TE 0488-01: Sidewalk reconstruction on Main Street and 8th Avenue in Ashland.

160-34 KA 5986-01: Reconstruction of Oklahoma Street from Comanche Street to Cheyenne Street in Ulysses

Non-FA:

21 KA 6872-01: Crack Sealing on K-15 from the Marion/Dickinson County Line to K-18 (excluding within the city limits of Abilene) and on K-18 from K-15 to the Dickinson/Geary County Line. Pavement Pro's LLC, McPherson, $251,118.05.

57-31 KA 6873-01: Crack Sealing on K-57 from Junction City to the US 77/K-244 junction. Pavement Pro's, $56,891.68.

18-31 KA 6874-01: 1.5-inch milling and 1.5-inch HMA overlay near the junction with Spring Valley Road west of Junction City. Shilling Construction Co. Inc., Manhattan, $192,730.00.

106 KA 6869-01: Crack sealing on K-15 from Clay Center to US 36, including the K-9/K-15 concurrancy, as well as K-80 and K-115. Pavement Pro's, $261,242.35.

101 KA 6868-01: Crack Sealing on US 36 from K-22 to the Little Blue River bridge, excluding the city of Washington; the entire length of K-22, and K-148 from K-9 to US 36. Pavement Pro's, $271,759.88.

83-90 KA 6715-01/83-20 KA 6716-01: 2.5-inch milling and 2-inch overlay on US 83 from K-383 north ~ 9.6 miles in Sheridan and Decatur counties. McCormick, $2,961,856.60.

70-32 KA 6798-01: Lighting upgrades at the I-70 rest area east of Grainfield. Phillips Southern Electric Company Inc., Wichita, $141,036.00.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

All of the projects from the December letting and one last project from the October letting have been awarded.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

There are only 11 projects up for bids on February 15.

Federal-Aid:

9-66 KA 3885-01: Replace Bridge #016 over Spring Creek Drainage west of Wetmore. Detour via K-62, K-16, and US 75

77-81 KA 3922-01: Replace bridge #039 over Mill Creek 1.57 miles north of the North Junction with US 24 (no plans posted)

156-27 KA 3939-01: Replacement of the K-156 Bridge #026 over Oak Creek located 1.13 miles northeast of K-140. Detour via K-140 and K-111.

11 U 2401-01: Sidewalk upgrade on Country Road from High School Avenue to Kansas Avenue and Maple Street from Tennessee Avenue to East Avenue in Columbus

50-24 KA 5779-01: Rehabilitation of a passing lane area on US 50-56 between Kinsley and Offerle<br>50-29 KA 3234-02: Rehabilitation of a passing lane area on US 50-56 near 119th Road in Ford County.<br>50-29 KA 5780-01: Rehabilitation of a passing lane area on US 50-56 east of Spearville

Federal-Aid, Local Projects:

22 C 4999-01: Replace the 195th Road/Old US 36 bridge over Peters Creek east of Troy. <em>Re-let from <a href="https://www.route56.com/kdot-lettings-november-2022/" data-type="post" data-id="5170">November 2022</a></em>

56 C 5145-01: Replace the J Road bridge over Troublesome Creek north of Emporia.

Non-FA:

54-104 KA 6458-01: Widen a Culvert just west of Yates Center.

56-73 KA 6454-01: Guardrail upgrades northeast of Garfield.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

Lettings from January have been updated with the awarded bids announced today (January 29)
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#323
Approved Bids announced 4/4/23
Approved Bids announced 5/5/23

There are 17 projects up for bidding on March 22

Federal Aid (Unless noted):

10-46 KA 6651-02: Repair and overlay on the eastbound K-10 bridge over Kill Creek in Desoto. A new sign is part of the project - which maintains an existing redundancy "Kill Creek Creek." Clarkson Construction Company, Kansas City, Missouri, $3,831,366.87.

16-52 KA-5520-01: Reconstruction of the intersection of K-16 and Parallel Road (former K-90). Detour via US 59 and US 24. Kings Construction Co. Inc., Oskaloosa, $1,256,088.41.

470-89 KA 6733-01: Repair the I-470 bridges over 29th, Fairlawn, Gage, 37th, and Shunganunga Creek
75-89 KA 6739-01 Repair of the bridge carrying the ramp from westbound I-470 to eastbound I-70 [which is considered part of the US 75 main line] over SW 10th Street (non-FA)
Bettis Asphalt & Construction Inc., Topeka, $1,854,692.14.

50-106 KA 5787-01: Refurbishment of a Passing lane area between Walton and Peabody in Harvey and Marion Counties. Bettis, $7,465,230.75.

9-69 KA 3935-01: Replacement of the K-9 bridge (#052) over Scull Creek 3.97 miles east of the K-173 junction.
9-74 KA 3934-01: Replacement of the K-9 bridge (#033) over Crooked Creek, located 3.63 miles east of the Norton County Line.
9-74 KA 3962-01: Replacement of the K-9 Bridge (#034) over Wolf Creek, located 7.58 miles east of the Norton County Line.
The three bridge projects are tied together. K-9 is to be closed at the Scull Creek and Crooked Creek projects, with traffic detoured using US 283, US 36, and US 183. Traffic on the Wolf Creek project is to be carried through on a shoo-fly detour.
Bridges, Inc., Newton, $5,271,429.38.

50-40 KA 5786-01: Construction of the westerly extension of the existing passing lane section of US-50 from 6.8 miles east of the I-135/US-50 junction east for 0.63 miles. Pearson Construction LLC, Wichita, $3,993,963.33.

56-41 KA 5997-01: Reconstruction of La Lande Avenue from Pike Street to Inman Street in Sublette

Federal-Aid, Local Projects:

52 C-5144-01: Replace the Fairmount Road bridge over Little Stranger Creek. Ebert Construction Co. Inc. & Subsidiary, Wamego, $1,523,562.89.

89 C 5147-01: Replace the NW 66th Street over Indian Creek in Northern Shawnee County. King Construction Company Inc. & Subsidiaries, Hesston, Kansas, $882,363.00.

37 C 5073-01: Replace the bridge on M Road over Tadpole Creek. Reece Construction Company Inc., Salina, $445,344.49.

Non-FA:

70-84 KA 6858-01: Lighting upgrade on the I-70 rest area east of Russell. Phillips Southern Electric Company Inc., Wichita, $235,117.00.

14-78 KA 1007-04/14-80 KA 1007-05: Milling, HMA Overlay, and bridge repair on the existing K-14/K-96 alignment between Hutchinson and Sterling in preparation for turnback when the new "Northwest Passage" alignment opens. APAC-Kansas Inc. Shears Division, Hutchinson, $10,079,402.73.

54-87 KA 6894-01: Repair of the 383rd Street bridge over US 54/400 in western Sedgwick County. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $171,637.96.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#324
Awarded Bids announced 5/5/23
Awarded Bids announced 6/7/23

There are 17 projects up for bidding on April 19.

73-3 KA 3889-01: Replace bridge #014 over the Walnut Creek Drainage 4.55 miles northwest of the Thomas Road (former K-74) intersection. One-lane traffic through the work zone controlled by a temporary traffic signal. A M Cohron & Son Inc., Atlantic, Iowa, $3,761,811.91.

77-58 KA 3923-01: Replace the bridge over Fawn creek on US 77/K-9 and reconstruct the east approach. One-lane traffic through the work zone controlled by a temporary traffic signal. Reece Construction Company Inc., Salina, $4,401,271.86.

27 TE 0492-01: Construct a new Pedestrian/Bike Path along the west side of Grand Avenue (K-14) between Grace Avenue and the Smoky Hill River bridge. Reece, $738,189.51.

36-77 KA 5987-01: Grading and surfacing on Grant Steet between 5th and 7th in Atwood. (no plans)

40-100 KA 3914-01: Replace the South Fork Smoky Hill River bridge between Sharon Springs and Wallace. Bridges Inc., Newton, $4,515,189.72.

40-100 KA 3916-01: Replace the bridge over the Union Pacific Limon Subdivision between Weskan and Sharon Springs. Detour via K-27, I-70, and US 385, though local traffic will be diverted onto old US 40 into Sharon Springs. Bridges Inc., $5,467,745.01.

40-100 KA 4067-01: Replace the bridge over the Union Pacific Sharon Springs Subdivision west of Wallace. Traffic to be carried on a shoe-fly detour. Bridges Inc., $17,989,103.95.

69-11 KA 6619-01/400-11 KA 6620-01: 1/2-inch milling and 1.5-inch Overlay on US 69A/US 400 from K-66 north to US 69-160 and continuing north on US 69-160-400 to K-171. (US 69A segment is non-FA) Emery Sapp & Sons Inc. and Subsidiaries, Columbia, Missouri, $5,778,250.61.

15-87 KA 5793-01: Upgrade of the traffic signals at Southeast Boulevard and 31st Street in Wichita. Phillips Southern Electric Company Inc., Wichita, Kansas, $198,495.00.

Federal-Aid, Local Projects:

16 C 5074-01: Replace a wood bridge on a driveway off of old US 50 about 1 1/2 mile east of Old Beto Junction. Reece, $586,530.69.

30 C 5114-01: Replace the Osborne Road bridge over Eight Mile Creek. Dondlinger & Sons Construction Co. Inc., Wichita, $1,192,988.60.

87 N 0738-01: Repair the Zoo Boulevard bridge over the Big Ditch in Wichita. Dondlinger, $2,706,804.50.

Non-FA:

106 KA 6913-01: Mudjacking work in KDOT District 1 Raising Solutions LLC, Jefferson City, Missouri, $601,540.00.

23-32 KA 6904-01: Patching on K-23 between MM 136-139 in Gove County McCormick Excavation & Paving LLC, Stratton, Colorado, $157,228.50.

70-98 KA 6859-01: Lighting upgrades at the I-70 Rest areas east of WaKenney. Cooper Construction LLC, Emporia, Kansas, $172,254.50.

15-87 KA 6903-01: HMA Patching and a 2-inch overlay on the east Frontage Road of Southeast Boulevard from 47th Street to Clifton Avenue in Wichita. APAC-Kansas Inc. Shears Division, Hutchinson, Kansas, $216,035.00.
Peace to you, and... don't drive like my brother.

R.P.K.



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.