Regional Boards > Southeast

Future Interstate 587 (Zebulon-Greenville)

<< < (110/112) > >>

The Ghostbuster:
Is the US 264/NC 11 Bypass segment no longer planned to become part of Interstate 587? I believe that at one point, the segment from Exit 73 to Exit 80 was going to be included as part of 587.

LM117:

--- Quote from: The Ghostbuster on August 19, 2022, 02:12:31 PM ---Is the US 264/NC 11 Bypass segment no longer planned to become part of Interstate 587? I believe that at one point, the segment from Exit 73 to Exit 80 was going to be included as part of 587.

--- End quote ---

No, it was never planned to become part of I-587.

However, it was part of a proposed new interstate between Kinston and Bethel, which was included in the Eastern NC Gateway Act that was introduced in Congress shortly before the 2016 elections. It obviously didn't get anywhere, and there's been no further talk of it since.

bob7374:
I've posted screen grabs from the updated (July and August) Google Maps Street View coverage of I-587, which includes this End I-587 sign (again using a US route white banner) just beyond the first Greenville Bypass exit:


The rest can be found at: https://malmeroads.net/ncfutints/fut587.html#photos

The Ghostbuster:
Will the exit numbers on Interstate 587 be renumbered anytime soon? Or will the US 264 numbers remain until the 587 designation reaches US 64 (and future Interstate 87)?

LM117:

--- Quote from: The Ghostbuster on September 06, 2022, 04:37:13 PM ---Will the exit numbers on Interstate 587 be renumbered anytime soon? Or will the US 264 numbers remain until the 587 designation reaches US 64 (and future Interstate 87)?

--- End quote ---

https://www.aaroads.com/forum/index.php?topic=19189.msg2757943#msg2757943

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version