Time to put together an update for TravelMapping.
11:New western alignment, new Exit 1, new terminus at NB15. Piece of cake.
15:How is the new left exit for NB11 signed?
Is the existing
cloverleaf at NB132 / Old NB15 still 31A/B?
132:Is the north end still at the NB15
cloverleaf?
OSM & Google show it continuing north to the roundabout.
133:I assume it still takes the 90° turn at Main & Hanington. Correct?
Is the new roadway west of the
corner that connects to the roundabout in fact an extension of Main St, as Google claims?
(If unknown, not a deal-breaker; I can name the waypoint after Cornwall Rd instead.)Edit: Or does it get straightened out, to travel west to the new Exit 1?
While I suppose it's possible that:
• NB133 could have its 90° bend straightened out and be extended W to the new Exit 1, and
• NB132 could be extended N thru the roundabout, along the new extension of Main St, and N along that N/S leg of existing NB133...
That's probably just the Fictional-loving roadgeek in me talking.
Multiplexes are rare in NB, so 132/133 may not happen. The way I've seen recent freeway upgrades shake out, existing designations are likely to stay put, with some unnumbered roads along the former alignments.
Looking through a couple
skyscraperpage threads for relevant info; any knowledge is appreciated.
Edit: One possibility I considered was NB133 getting straightened out (
which may actually be happening), with NB132 just staying put...
Or, OSM could be right about 132... Eh!
