The AARoads Wiki is live! Come check it out!
DelDOT has a new arcgis page set up for archived projects here:https://deldot.maps.arcgis.com/apps/webappviewer/index.html?id=2fb554d1888a4f9c8c4a3085852a9f55Notable things I've found include a set of plans for the "Bay Bridge Connector Highway", or what would have been US 301, between US 40 and I-95. There's also some linework for the unbuilt SR 72 connector between the north end of Paper Mill Road and Stoney Batter Road that I've never been able to find any history on.
Quote from: Alex4897 on October 10, 2022, 12:25:37 PMDelDOT has a new arcgis page set up for archived projects here:https://deldot.maps.arcgis.com/apps/webappviewer/index.html?id=2fb554d1888a4f9c8c4a3085852a9f55Notable things I've found include a set of plans for the "Bay Bridge Connector Highway", or what would have been US 301, between US 40 and I-95. There's also some linework for the unbuilt SR 72 connector between the north end of Paper Mill Road and Stoney Batter Road that I've never been able to find any history on.I clicked the link. It brought up a blank map devoid of symbols and blurb.
Quote from: jemacedo9 on April 25, 2022, 08:30:06 AMQuote from: 74/171FAN on February 22, 2022, 11:24:16 AMAs of Saturday, DE 30 signage has not been removed (at least along the DE 24 concurrency, seeing it there made it clear to me not to bother on the rest that is planned to be removed).As of this past Sat 4/23, DE 30 signage still exists west of US 113.Still present as of Sun 7/3, both west of US 113 AND US 13. Was on North 13 and saw a “West 30” sign for a left turn. Later I took DE 24 from Seaford over to pickup DE 26 to Dagsboro. On Sat 7/1 I took DE 26 down to MD. Can confirm still signed as 24/30.
Quote from: 74/171FAN on February 22, 2022, 11:24:16 AMAs of Saturday, DE 30 signage has not been removed (at least along the DE 24 concurrency, seeing it there made it clear to me not to bother on the rest that is planned to be removed).As of this past Sat 4/23, DE 30 signage still exists west of US 113.
As of Saturday, DE 30 signage has not been removed (at least along the DE 24 concurrency, seeing it there made it clear to me not to bother on the rest that is planned to be removed).
Quote from: sbeaver44 on July 04, 2022, 10:42:42 PMQuote from: jemacedo9 on April 25, 2022, 08:30:06 AMQuote from: 74/171FAN on February 22, 2022, 11:24:16 AMAs of Saturday, DE 30 signage has not been removed (at least along the DE 24 concurrency, seeing it there made it clear to me not to bother on the rest that is planned to be removed).As of this past Sat 4/23, DE 30 signage still exists west of US 113.Still present as of Sun 7/3, both west of US 113 AND US 13. Was on North 13 and saw a “West 30” sign for a left turn. Later I took DE 24 from Seaford over to pickup DE 26 to Dagsboro. On Sat 7/1 I took DE 26 down to MD. Can confirm still signed as 24/30.The DE 30 truncation page on DelDOT's website shows sign removal as beginning in Summer 2022....
Quote from: ixnay on October 11, 2022, 07:30:05 AMQuote from: Alex4897 on October 10, 2022, 12:25:37 PMDelDOT has a new arcgis page set up for archived projects here:https://deldot.maps.arcgis.com/apps/webappviewer/index.html?id=2fb554d1888a4f9c8c4a3085852a9f55Notable things I've found include a set of plans for the "Bay Bridge Connector Highway", or what would have been US 301, between US 40 and I-95. There's also some linework for the unbuilt SR 72 connector between the north end of Paper Mill Road and Stoney Batter Road that I've never been able to find any history on.I clicked the link. It brought up a blank map devoid of symbols and blurb.Need to zoom in at least 4 levels. Project show up zoomed in.
(For DE 72, I-95, and sort of for DE 896) TRAFFIC ALERT - New Castle County - Utility Relocation on Rt 72 Under I-95 (update)
(For DE 15) McKee/Saulsbury Road Public Workshop (I really wish there was more notice on this one.)
Quote from: 74/171FAN on October 12, 2022, 02:10:07 PM(For DE 15) McKee/Saulsbury Road Public Workshop (I really wish there was more notice on this one.)Apparently so did DelDOT, the announcement got taken down. I don't even see a project on their Projects Portal for this yet.
Quote from: Alex4897 on October 13, 2022, 10:32:44 AMQuote from: 74/171FAN on October 12, 2022, 02:10:07 PM(For DE 15) McKee/Saulsbury Road Public Workshop (I really wish there was more notice on this one.)Apparently so did DelDOT, the announcement got taken down. I don't even see a project on their Projects Portal for this yet.That is weird. I did attend this last night so it did happen.
Quote from: 74/171FAN on October 13, 2022, 10:37:01 AMQuote from: Alex4897 on October 13, 2022, 10:32:44 AMQuote from: 74/171FAN on October 12, 2022, 02:10:07 PM(For DE 15) McKee/Saulsbury Road Public Workshop (I really wish there was more notice on this one.)Apparently so did DelDOT, the announcement got taken down. I don't even see a project on their Projects Portal for this yet.That is weird. I did attend this last night so it did happen.Oh wow that WAS short notice. Was this for the whole of the corridor up to Scarborough Road? The only project in the area I see is slated for the intersection at SR 8, and that's so close to construction I'd think it'd be beyond the point of holding another workshop.
Specifically, what is proposed to be done with the 8 & 15 intersection? A mega enlargment?
(For DE 279) TRAFFIC ALERT - New Castle County - New Traffic Pattern on Elkton Road
^This link works fine: https://deldot.gov/projects/index.shtml?dc=details&projectNumber=T201912701