« Reply #2196 on: September 01, 2019, 05:27:41 PM »
Some minor updates done on the PATP website. There are 2 accelerated bridge construction closures coming up in the next month or so. One is next weekend on the NE extension near MM59. No idea if this will involve a 6-lane bridge deck or not.
The other will be on the mainline, over 2 weekends later this month and early next. It's the bridge at apx MM238 in Cumberland County that crosses over a railroad track. According to the site, they're doing eastbound one weekend, and westbound the next. I saw one of the nearly finished structures on the south side of the highway, and it appears that it will accommodate 3 lanes plus full inner and outer shoulders. I imagine that there is an identical structure for the westbound lanes, but I didn't see it personally as my return trip was by another route.
Logged
Clinched:
I: 83, 97, 176, 180 (PA), 270 (MD), 283, 395 (MD), 470 (OH-WV), 471, 795 (MD)
Traveled:
I: 70, 71, 75, 76 (E), 78, 79, 80, 81, 86 (E), 95, 99, 270 (OH), 275 (KY-IN-OH), 376, 495 (MD-VA), 579, 595 (MD), 695 (MD)
US: 1, 9, 11, 13, 15, 22, 25, 30, 40, 42, 50, 113, 119, 127, 209, 220, 222, 301