Regional Boards > Great Lakes and Ohio Valley

Illinois notes

<< < (444/480) > >>

hobsini2:

--- Quote from: kphoger on December 13, 2022, 02:00:25 PM ---
--- Quote from: Rothman on December 11, 2022, 09:35:58 AM ---

--- Quote from: Revive 755 on December 10, 2022, 10:10:05 PM ---Is Chicago is now putting speed cameras on ramps?  Note the photo enforced plaques for the ramp advisory speeds for a ramp off NB Mannheim near O'Hare.

--- End quote ---

Doesn't seem legal.

--- End quote ---

I agree.  As I figure it, the speed limit on that ramp is 50 mph.

--- End quote ---
Technically, that is still Airport property and under their jurisdiction. That sign has been up for about a year. I have never heard of anyone getting a ticket from there. But there are speed cameras throughout the city.

kphoger:
What I mean is that exceeding the number on a W13-3 (Advisory Ramp Speed) sign isn't illegal.  The last R2-1 (Speed Limit) regulatory sign before that point says 50.

JoePCool14:
After 9 years, several years late and over budget, the Circle interchange reconstruction will be coming to a close very soon.

https://wgntv.com/news/chicago-news/jane-byrne-interchange-project-finally-coming-to-an-end-over-budget-and-years-behind-schedule/

I just drove through it yesterday for work and I still feel like there's a handful of things left to do. It didn't feel "complete" to me. But maybe that's just simple punch list stuff.

Some of the BGS also leave a lot to be desired.

ilpt4u:
Are the Controls for the Freeways still Wisconsin, Indiana, and West Suburbs?

That is the IDOT way, of course

ET21:

--- Quote from: JoePCool14 on December 14, 2022, 09:58:01 AM ---After 9 years, several years late and over budget, the Circle interchange reconstruction will be coming to a close very soon.

https://wgntv.com/news/chicago-news/jane-byrne-interchange-project-finally-coming-to-an-end-over-budget-and-years-behind-schedule/

I just drove through it yesterday for work and I still feel like there's a handful of things left to do. It didn't feel "complete" to me. But maybe that's just simple punch list stuff.

Some of the BGS also leave a lot to be desired.

--- End quote ---

They still have work to do north of it along the Kennedy between 290/Congress and Lake St. Walking over it the last few months, the exit lanes are still being built and I think Adams St bridge was still closed as last check

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version