Mountain Parkway corridor for the extension from Salyersville to Prestonsburg was announced today. As I predicted, they opted for a new-terrain alignment to the north of existing KY 114.
There's no money behind this and no timetable for design or construction to begin. Necessary surveying and environmental/archaeological work will begin shortly.
Apparently, most local lobbying from residents and elected officials was in favor of the new alignment. Not only were housing issues a primary consideration, but traffic control was also a key factor. As it is now, traffic control will only have to be done on either end of the route, where it ties into US 460 in Salyersville and existing four-lane KY 114 west of Prestonsburg. Utility relocations will be minimal along the chosen route.
The road will be built as a limited access freeway with a speed limit of 70 mph.