News:

Needing some php assistance with the script on the main AARoads site. Please contact Alex if you would like to help or provide advice!

Main Menu

I-10 expansion between San Antonio and Houston

Started by longhorn, July 08, 2017, 03:19:02 PM

Previous topic - Next topic

Bobby5280

I don't mind the service plazas in the median all that much. But I would prefer the more elaborate design where the plaza is built over the highway and has exits and parking areas flanking the left and right of the main lanes of the Interstate. No left exits with that approach.

The I-44 service plaza near Vinita is fairly unique. At one time it had what was considered the world's largest McDonald's location. The recently re-built plaza has handful of restaurants in it along with a convenience store and tourist info stuff.


Rothman

I don't like plazas where you can't reverse direction.
Please note: All comments here represent my own personal opinion and do not reflect the official position(s) of NYSDOT.

MaxConcrete

Bids were opened today for the next section to be upgraded to a minimum of 3x3. This section is from east of the Colorado River, westward to SH 71, including a new interchange at SH 71. Pulice Construction won't sleep well tonight knowing they underbid the next bid lowest bid by $105 million.

This project includes a new 8-lane bridge over the Colorado River on a new alignment. About 1 mile of existing alignment immediately east of the Colorado River will be abandoned (although I don't know the eventual plan for it).

For many years - actually decades! - there has been a need to widen I-10 from Houston to the SH 71 split. With this project, it will finally get done.

County:   COLORADO   Let Date:   05/03/24
Type:   WIDEN ROAD - ADD LANES   Seq No:   3201
Time:   0 X   Project ID:   F 2B24(075)
Highway:   IH 10   Contract #:   05243201
Length:   1.727   CCSJ:   0271-01-083
Limits:   
From:   COLORADO RIVER BRIDGE   Check:   $100,000
To:   US 90 (ALLEYTON RD SOUTH)   Misc Cost:   
Estimate   $469,969,329.15   % Over/Under   Company
Bidder 1   $439,895,580.53   -6.40%   PULICE CONSTRUCTION, INC.
Bidder 2   $545,355,544.63   +16.04%   WEBBER, LLC
Bidder 3   $551,244,651.17   +17.29%   WILLIAMS BROTHERS CONSTRUCTION CO., INC.
www.DFWFreeways.com
www.HoustonFreeways.com

thisdj78

Quote from: MaxConcrete on May 03, 2024, 07:54:21 PMBids were opened today for the next section to be upgraded to a minimum of 3x3. This section is from east of the Colorado River, westward to SH 71, including a new interchange at SH 71. Pulice Construction won't sleep well tonight knowing they underbid the next bid lowest bid by $105 million.

This project includes a new 8-lane bridge over the Colorado River on a new alignment. About 1 mile of existing alignment immediately east of the Colorado River will be abandoned (although I don't know the eventual plan for it).

For many years - actually decades! - there has been a need to widen I-10 from Houston to the SH 71 split. With this project, it will finally get done.

County:   COLORADO   Let Date:   05/03/24
Type:   WIDEN ROAD - ADD LANES   Seq No:   3201
Time:   0 X   Project ID:   F 2B24(075)
Highway:   IH 10   Contract #:   05243201
Length:   1.727   CCSJ:   0271-01-083
Limits:   
From:   COLORADO RIVER BRIDGE   Check:   $100,000
To:   US 90 (ALLEYTON RD SOUTH)   Misc Cost:   
Estimate   $469,969,329.15   % Over/Under   Company
Bidder 1   $439,895,580.53   -6.40%   PULICE CONSTRUCTION, INC.
Bidder 2   $545,355,544.63   +16.04%   WEBBER, LLC
Bidder 3   $551,244,651.17   +17.29%   WILLIAMS BROTHERS CONSTRUCTION CO., INC.

Any indication of how different the intersection with SH71 will be?

Also, I wonder why the need for new alignment east of and over the Colorado River.

Anthony_JK




Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.