Quote from: route56 on October 31, 2018, 09:04:13 PM
Quote from: apeman33 on October 31, 2018, 02:33:40 PM
Strange. The traffic light there right now doesn't really cause any issues. U.S. 160 there really doesn't have the kind of traffic that creates any problems.

If there's a traffic light there, it's a temporary rig. The plans and GSV show that the intersection has stop signs on US 160, including in the medians (where one would normally see yield signs)

Never mind. I read "69" instead of "169."


route56

October lettings have been updated with the approved bids announced 11/5.

Does anyone know what "heater scarification (no overlay)" means?
Peace to you, and... don't drive like my brother.

R.P.K.

J N Winkler

Quote from: route56 on November 12, 2018, 01:32:43 PMDoes anyone know what "heater scarification (no overlay)" means?

It appears to be a form of hot in-place pavement recycling that is suitable for pavements that are not too seriously rutted.
"It is necessary to spend a hundred lire now to save a thousand lire later."--Piero Puricelli, explaining the need for a first-class road system to Benito Mussolini

route56

#153

Approved bids Announced 1/2/19
December, 2018


Federal-Aid:

7 TE 0455-01: Reconstruction of the 600 block of Utah Street in Hiawatha. Amino Brothers Company Inc., Kansas City, Ks., $799,614.92.

36-22 KA 4875-01: Bridge overlay on the US 36 bridges over Roseport Road in Elwood. PCI Roads, LLC, Saint Michael, Mn., $518,022.40

92-44 KA 5082-01: 1.5" Surface recycle and chip seal on K-92 from K-4 east to Liberty Street in Oskaloosa. Dustrol Inc., Towanda, $981,877.89.

10-46 KA 4877-01: Repair of the westbound K-10 bridge over Woodland Road. PCI Roads, $450,358.49.

10-46 KA 5000-01: Mill and HMA overlay on K-10 from the Douglas/Johnson County Line to just east of the K-7 interchange. Bettis Asphalt & Construction Inc., Topeka, $5,011,540.53.

69-46 KA 5001-01: Mill and HMA overlay on asphalt areas of US 69 from Blue Valley Parkway north to College Boulevard. Superior Bowen Asphalt Company LLC, Kansas City, Mo., $2,426,762.41.
69-46 KA 5002-01: Mill and HMA overlay on US 69 from 199th Street north to 151st Street (plus ramps from 199th Street to 135th Street). Superior Bowen, $889,693.03.

99-56 KA 5165-01: Surface recycle and chip seal on K-99 from US 56 north to the Lyon/Wabaunsee County line.  Bettis, $466,557.09.
99-99 KA 5103-01: Surface recycle and chip seal on K-99 from the Lyon/Wabaunsee County line north to the South City Limits of Eskridge. Bettis,  $633,236.36.


9-58 KA 2101-01: Replacement of the K-9 bridge over Coon Creek. Bridges Inc., Newton, $2,649,398.94.

135-59 KA 5127-01: Milling and HMA overlay on I-135 from south of McPherson north to the McPherson/Saline County line. APAC-Kansas Inc. Shears Division, Hutchinson, $5,756,222.32.

266-79 KA 4996-01: Milling and HMA overlay of the entire length of K-266. APAC-Kansas, $523,950.96.

81-79 KA 5108-01: Overlay on US 81 in Republic County APAC-Kansas, $6,674,250.71.

15-101 KA-3086-01: Replacement of the K-15 bridge over Mill Creek. Bridges Inc., $3,528,834.05.

70-26 KA 4955-01: Repair of the westbound I-70 bridge over US 183 in Hays. PCI Roads, $299,035.76.

70-26 KA 4956-01: Repair of the westbound I-70 bridge over K-247 in Ellis. PCI Roads, $271,337.42.

24-71 KA 4958-01: Repair of a bridge on US 24 ~ 3 miles east of Alton. L & M Contractors Inc., Great Bend, Ks., $239,426.20.

239-54 KA 4601-01: Surface Recycle and Chip seal of the entire length of K-239. Dustrol, $489,422.22.

69-54 KA 5102-01: HMA overlay on US 69 from  3.5 miles north of the south US 69/K-52 junction north to North Sugar Creek bridge. Bettis, $5,191,871.63.

135-40 KA 5125-01: PCCP pavement patching form just south of the South Junction with US 50 north to the Harvey/McPherson County Line. Pavers Inc., Salina, $993,782.96.

56-80 KA 3894-01: Replacement of a Drainage culvert on US 56 with a actual bridge. Reece Construction Company Inc., Salina, $1,243,567.67.

135-87 KA 5128-01: PCCP Pavement patching, grinding, and joint sealing on I-135 from the Turnpike north to Pawnee. R A Knapp Construction Inc., Lenexa, $1,790,210.86
135-87 KA 5130-01: PCCP Patching from the north end of the Canal Route north to 37th Street. R A Knapp, $499,500.98.

135-87 KA 5129-01: Milling and HMA Overlay on I-135 from Pawnee to the south end of the Canal Route. Cornejo & Sons LLC, Wichita, $2,640,923.77.

Non Federal-Aid

24-75 KA 5104-01: Mill and overlay on US 24 from the end of the 4-lane at Wamego east to the Pottawatomie/Shawnee County Line. Bettis, $2,549,784.91.

24-89 KA 5115-01: Mill and overlay on US 24 from Menoken Road to Topeka Boulevard. Bettis, $1,644,141.38.

32-105 KA 5114-01: Mill and overlay on K-32 from K-7 east to Turner Diagonal. Bettis, $3,118,463.17.

183A-26 M 0067-01: Asphalt Stockpile for the Hays sub-area site. APAC-Kansas, $51,991.65.

106 M 0068-01: Asphalt Stockpile for the Phillipsburg and Stockton sub-area sites and the Hicks Park mixing strip, District 3, Area 3. Venture Corporation, Great Bend, $112,500.00.

106 M 0069-01: Asphalt Stockpile for the Colby sub-area site and the Atwood and Oberlin mixing strips, District 3, Area 2. APAC-Kansas, $146,338.50.

106 M 0070-01: Asphalt Stockpile for the Hoxie sub-area site and the Grainfield, Oakley, and Sharon Springs mixing strips, District 3, Area 4. APAC-Kansas, $95,322.00.

75-63 KA 5107-01: Milling and HMA overlay on US 75 from Caney to Independence. APAC-Kansas, $3,299,440.90.
Peace to you, and... don't drive like my brother.

R.P.K.

mvak36

Saw this in the KC Star today (don't want to start a new thread for this) https://www.kansascity.com/news/politics-government/article221895455.html

QuoteOne of the worst traffic bottlenecks in Johnson County – and in the state of Kansas for that matter – will get some relief thanks to about $14.5 million in federal funds and $1.65 million in funds from Johnson County.

Interstate 35 under the 75th Street bridge in Johnson County will be widened by one lane in each direction, with construction starting in spring of 2020, Kansas Gov. Jeff Colyer announced Tuesday.
Counties: Counties visited
Travel Mapping: Summary

route56

November Bid list updated with the approved bids. Only one project from November did not have an approved bid announced, a brick street rehabilitation project in Manhattan. Presumably, the approved bid has to go to the Manhattan City Council for concurrence before the contract can actually be award.

For some reason, K-171 was noted on the release as K-171(02). This is the first time I've seen such a distinction. Ironically, it should no longer be necessary, as Rice County agreed to take back the 'other' K-171 in exchange for ARRA funds to repave the street in Bushton.
Peace to you, and... don't drive like my brother.

R.P.K.

mvak36

This was at the bottom of the article about the Buck O'Neil bridge grant.

QuoteOutgoing Congressman Kevin Yoder, R-Kan., also announced the Unified Government of Wyandotte County and Kansas City Kan. got a $13.8 million grant to replace the interchange at Interstate 70 and the Turner Diagonal.

Yoder said in a release the new interchange would open the door for more economic development.

"This is a massive win for KCK, and will continue to build on the already amazing economic development we have seen over the last decade,"  Yoder said.

Counties: Counties visited
Travel Mapping: Summary

route56

#157
Approved bids announced 1/29/19
Approved bids announded 3/8/19


January, 2019

Federal Aid:

3 TE 0452-01: Grading and Surfacing - Streetscape and sidewalk improvements along North 2nd Street between Commercial Street and Division Street in Atchison.  Julius Kaaz Construction Co Inc., Leavenworth, Ks., $874,791.03.

3 U 2329-01: Grading & surfacing - Safe Routes to School improvements along 5th Street from "U" Street to Park Street in Atchison.  Kaaz, $477,777.00.

35-46 KA 3083-01: Grading, bridge & surfacing - Reconstruction of the Sunflower Road interchange in Edgerton, including a new bridge on Sunflower Road over I-35. Pyramid Contractors Inc. and Pyramid Properties Inc., Olathe, $8,348,743.91.

69-46 KA 4876-01: Bridge repair - Southbound bridge over 151st Street.  Comanche Construction Inc., Shawnee Mission, $923,215.90.

25-55 KA 3927-01: Grading, bridge & surfacing: Replacement of the K-25 bridge over the Smoky Hill River just south of Russell Springs. Detour via K-96, US 83, and US 40.  L & M Contractors Inc., Great Bend, $1,593,017.87

39-67 KA-4988-01: Bridge #094 on K-39 located 1.8 miles east of the south U.S. 169/ K-39 junction, bridge, B & B Bridge Company LLC, St. Paul, $38,427.00.

56-73 KA 3265-01: Grading and surfacing - Reconstruction of US 56 through the town of Garfield. Venture Corporation, Great Bend, $3,778,069.51.

78 TE 0447-01:  Pedestrian & bicycle paths - New Multi-use path from 21st and Main to the Kansas State Fairgrounds. Vogts Parga Construction LLC, Newton, Ks., $411,973.25

235-87 KA 3110-01: Grading, bridge & surfacing: I-235 "Green" project Details in this thread started by JonathanBergkamp King, A Joint Venture, LLC, Wichita, $51,337,971.52.

Non-Federal Aid:

16-106 KA 5173-01: Chip seal - From US 59 South of Oskaloosa to US 24 in Tonganoxie Vance Brothers Inc. And Subsidiary, Kansas City, Mo., $435,908.45.

169-63 KA 5116-01: From the end of the 4-lane north of Coffeyville north to the Montgomery/Labette County line. Cornejo & Sons LLC, Wichita, $2,212,836.63.
Peace to you, and... don't drive like my brother.

R.P.K.

kphoger

Quote from: route56 on December 16, 2018, 02:25:58 PM
25-55 KA 3927-01: Grading, bridge & surfacing: Replacement of the K-25 bridge over the Smoky Hill River just south of Russell Springs. Detour via K-96, US 83, and US 40.

Or, for those in the know who don't mind a little gravel...  Just keep going north on 160 Road to US-40.  That's 25 miles shorter than the suggested detour.  I've known people who take that route instead of K-25 anyway, just because it shaves off a four-mile corner and avoids going through Russell Springs.
Keep right except to pass.  Yes.  You.
Visit scenic Orleans County, NY!
Male pronouns, please.

Quote from: Philip K. DickIf you can control the meaning of words, you can control the people who must use them.

route56

The bids for December (and one from November) have been awarded and the lettings posts updated.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#160

Approved Bids announced 3/8/18
February, 2019

Federal-Aid:

66 TE-0463-01: Brick street restoration of the 600 Block of Main Street in Seneca

75-89 KA-4879-01: Bridge repair on the bridges on US 75 over the Wakarusa River in southern Shawnee County. PCI Roads, LLC, Saint Michael, Mn., $691,018.36.

21 C-4889-01: Major Collector signage upgrade on 1400 Avenue between Eden Road and Union Road (excluding the section that is part of K-43) Signs are off-the-shelf, but the signage plan is in line with what KDOT usages.

209-21 KA-3955-01: Bridge replacement of K-209 over Lyon Creek. Detour via a shoo-fly detour. King Construction Company Inc. and Subsidiaries, Hesston, Ks., $1,105,915.04.

106-72 KA-4674-02: Guardrail replacement at three sites on K-106.  Collins & Hermann Inc., Saint Louis, Mo., $89,648.93

81-72 KA-4831-01: Rehabilitation of the bridges over the KYLE Railroad southeast of Minneapolis. One bridge to be rehabbed while traffic is carried head-to-head on the other bridge. A M Cohron & Son Inc., Atlantic, Ia., $4,156,887.34.

15-101 KA-3087-01: Replacement of the K-15 Bridge over Mill Creek north of Morrowville. Bridge to be replacement one half at a time with traffic controlled by temporary signals. King, $2,644,993.93.

126-19 KA-3902-01: Replacement of the bridge on K-126 just west of the junction with US 69.  B & B Bridge Company LLC, St. Paul, Ks., $2,823,444.40.

166-63 KA-3906-01: Replacement of the bridge over the SK&O railroad just west of the US 75 Junction. Official Detour via US 75, US 160, and K-99.  B & B, $3,453,650.98.

80 KA-4768-01: Rehabilitation of a two-block section of Broadway (K-14/K-96) in Sterling.

50-93 KA-4514-01: Roundabout at the US 50/US 281 junction south of St. John. Interestingly enough, at one time, a diamond interchange was once proposed for this junction.  Venture Corporation, Great Bend, Ks., $5,201,857.25

13 C-4893-01: Major Collector signage upgrade on two roads in eastern Clark County. Two Special signs: Warning "Open Range" and "NO THRU TRUCKS WITHOUT COUNTY ORIGIN OR DESTINATION RESOLUTION #2013-18"

50-28 KA-3251-01: Reconstruction of the of the Garden City Bypass (US 50/83/400) from the south junction with US 50/400 north to the two-lane/four-lane transition. There's two separate phases of construction, north and south of K-156, for which the bypass will be closed. Detour for phase 1 is via K-156 and US 50B/US 83B. Detour for phase 2 is via K-156, Campus Drive, and US 50B. Koss Construction Co., Topeka, Ks., $11,024,509.79.

400-29 KA-3860-01: Bridge repair on US 400 just north of Ford.  Bettis Asphalt & Construction Inc., Topeka, Ks., $995,946.00.

Non-Federal-Aid:

10-23 KA-5136-01: Light tower upgrade on the K-10/CR 442 interchange on the east side of Eudora. Fulsom Brothers Inc., Cedar Vale, Ks., $148,180.00.

70 KA-5207-01: Overlay and Chip Seal on US 75 from Jordan Road north to K-68 in Osage County, as well as K-276 and K-278.  APAC-Kansas Inc Shears Division, Hutchinson, Ks., $404,689.38.

400-29 KA-5045-01: Bridge repair of the Marshall Road Bridge over US 400 on the west bypass of Dodge City. Reece Construction Company Inc., Salina, Ks., $390,898.70.

EDIT! The Garden City Bypass is US 50, not US 54, as Scott pointed out below. Even the project number shows that it's US 50. What was I thinking?
Peace to you, and... don't drive like my brother.

R.P.K.

apeman33

Quote from: route56 on January 23, 2019, 12:50:01 PM
February, 2019

Federal-Aid:
50-28 KA-3251-01: Reconstruction of the of the Garden City Bypass (US 50/83/400) from the south junction with US 50/400 north to the two-lane/four-lane transition. There's two seperate phases of construction, north and south of K-156, for which the bypass will be closed. Detour for phase 1 is via K-156 and US 50B/US 83B. Detour for phase 2 is via K-156, Campus Drive, and US 50B.

FTFY

route56

Peace to you, and... don't drive like my brother.

R.P.K.

SD Mapman

How long does it usually take from the let date to the start of construction?
The traveler sees what he sees, the tourist sees what he has come to see. - G.K. Chesterton

J N Winkler

I'd budget at least two months--one for award and another for issuance of notice to proceed.
"It is necessary to spend a hundred lire now to save a thousand lire later."--Piero Puricelli, explaining the need for a first-class road system to Benito Mussolini

Rothman

Heh.  Kansas is quicker than NY.

NY state lets = 45 days to award, more or less.

Local lets are all over the map, with NYCDOT sometimes taking over a year to award.
Please note: All comments here represent my own personal opinion and do not reflect the official position(s) of NYSDOT.

route56

March, 2019


Federal-Aid (unless otherwise noted):


43 C 4897-01: Major collector signage upgrade in Jackson County

35-46 KA 5126-01: Milling and HMA overlay

92-52 KA 4947-01: Bridge repair on the Centennial Bridge over the Missouri River in Leavenworth

31-70 KA 4944-01: Bridge repair over Dragoon Creek west of Burlingame.

470-89 KA 4942-01: Bridge repair on the westbound I-470 ramp to westbound I-70 in northwest Topeka.

70-89 KA 5164-01: Bridge repair on Urish Road over I-70 in northwest Topeka.

89 U 2317-01: Rebuilding of the ramp from eastbound I-470 to 29th Street as well as the intersection of the I-470 ramp with 29th Street and McClure Road

70-99 KA 4945-01: Bridge repair of the Spring Creek Road bridge over I-70

69-105 KA 4939-01: Bridge repair of the 18th Street Expressway bridge over Merriam Lane and Turkey Creek

70-105 KA 5124-01: Milling and HMA overlay from the 18th Street Expressway to Mill Street

81-15 KA 5180-01: Milling and HMA overlay from Concordia south ~3 1/2 miles

177-31 KA 5183-01: Chip seal from the Morris/Geary County line north to I-70

59 U 2336-01: Safe routes to school sidewalk construction in McPherson

64 C 4900-01: Major collector signage upgrade in the western half of Morris County

81-85 KA 5179-01: Milling and HMA overlay from I-70/I-135 north to the Saline/Ottawa County Line

27-12 KA 5191-01: Milling and HMA overlay from the Sherman/Cheyenne County Line north to US 36

70-97 KA 5123-01: Milling and HMA overlay from the Sherman/Thomas County Line east to US 24
70-97 M 0065-01: Stockpile asphalt material for above project (Non-FA)

70-97 KA 5201-01: Milling and HMA overlay from MP 50 east to MP 51.1

70-98 KA 5122-01: Milling and HMA overlay from US 283 east to the Trego/Ellis County line
70-98 M 0064-01: Stockpile asphalt material for above project[/size] [/size][size=78%](Non-FA)[/size]

169-1 KA 3255-02: Bridge repair of the US 169 bridge over the Neosho River on the Neosho/Allen County Line

58-2 KA 5189-01: Milling and HMA overlay from the Coffey/Anderson County Line to US 169
58-16 KA 5190-01: Milling and HMA overlay from Leroy east to the Coffey/Anderson County Line.

75-104 KA 5187-01: Milling and HMA overlay from the Wilson/Woodson County Line north to Yates Center
75-16 KA 5188-01: Milling and HMA overlay from the north junction with K-58 north to Burlington

63 U 2331-01: Safe routes to school sidewalk construction in Coffeyville

76 C 4904-01: Major collector signage upgrade in southwestern Pratt County

156-42 KA 5182-01: Milling and HMA overlay from the Finney/Hodgeman County Line east to Jetmore.

25-47 KA 5181-01: Milling and HMA overlay from the Grant/Kearney County Line north to Lakin.

Non-Federal-Aid:
73-7 KA 5225-01: Chip seal from Horton to the State Line, excluding Hiawatha

81 KA 5199-01: Milling and HMA overlay on US 24/77 from Main Street in Riley east to the east US 24/77 junction and on K-82 from US 24 to US 77,

18-81 KA 5224-01: Chip seal from K-177 east to the Riley/Wabaunsee County Line
18-99 KA 5223-01: Chip seal from the Riley/Wabaunsee County Line east to K-99

177-64 KA 5230-01: Chip seal from L Avenue north to the Morris/Geary County Line, excluding the segment along the Morris/Wabaunsee County Line
177-99 KA 5231-01: Chip seal on K-177 along the Morris/Wabaunsee County Line

635-105 KA 5118-01: Sign structure modification on southbound I-635 at Leavenworth Road

18-106 KA 5186-01: Milling and HMA overlay from K-15 east to K-177 in Dickinson and Geary Counties

283-033 KA 5200-01: Milling and HMA overlay from .643 miles South of the South City Limits of Hill City north to Prout Street in Hill City

69 KA 5212-01: Chip seal on US 283 from K-9 north to US 36, and on US 36 from 2nd Avenue east to the West City Limits of Norton

181-71 KA 5195-01: Surface recycle and chip seal from the Mitchell/Osborne County Line north to Downs

24-106 KA 5194-01: Chip seal from K-18 east to Stockton in Graham and Rooks Counties

70-106 KA 5227-01: Rumble strip installation in various spots on I-70 in Sherman, Thomas, and Gove Counties

106 KA 5239-01: Rumble strip installation on US 69 in northern Linn County, US 166 from Baxter Springs to the Missouri State Line in Cherokee County, and US 400 in Greenwood County from the Butler County Line east to K-99.

160-4 KA 5213-01: Chip seal from the Commanche/Barber County Line east to US 281

106 KA 5229-01: Rumble strip installation on K-196 in Butler County and on two locations on I-235 in Wichita
Peace to you, and... don't drive like my brother.

R.P.K.

route56

January and February letting posts have been updated with approved lettings announced on March 8. Two major  collector signage projects from March have yet to be awarded, most likely because KDOT is waiting on the respective county commissions to concur with the approved bids.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#168
Approved Bids announced 5/1/19
Approved Bids Announced 6/6/19

April, 2019

Federal-Aid (unless noted)
35-46 KA 4782-01: Grading, bridge and surfacing: Extension of the I-35 bridge over the BNSF Fort Scott Subdivision in Olathe to accommodate the extension of Mahaffie Street. Pyramid Contractors Inc. and Pyramid Properties Inc., Olathe, Ks., $5,440,194.37.

69-46 KA 4844-01: Grading, bridge repair and surfacing: Rehabilitation of the southbound I-35 ramp to the Overland Parkway (US 69).  Clarkson Construction Company, Kansas City, Mo., $3,728,449.20.

89 U-2316-01: Southwest Gage Boulevard from south of Southwest Emland Drive to just south of the east bound I-70 exit ramp in Topeka, intersection improvement. Sunflower Paving Inc., Lawrence, Ks., $379,159.10.

470-89 KA 4697-02: Guardrail reconstruction along the non-Turnpike section of I-470.  Bettis Asphalt & Construction Inc., Topeka, Ks., $1,084,769.10.

40-89 KA 5047-01: Milling and HMA overlay from K-4 east to the Shawnee/Douglas County line. Hamm Inc., Perry, Ks., $894,801.87
40-23 KA 5046-01: Milling and HMA overlay from the Shawnee/Douglas County Line east to Big Springs (Non-FA) Hamm,  $110,679.39.

106 TE 0402-05: Pedestrian & bicycle paths: Flint Hills Nature Trail development Phase 5: from Allen to Osage City in Lyon and Osage Counties. Killough Construction Inc., Ottawa, Ks., $3,823,496.54.

70-26 KA-4698-02: Grading for new guardrail pads on I-70 from US 183 east to the Ellis/Russell County Line. APAC-Kansas Inc. Shears Division, Hutchinson, Ks., $386,465.65.

70-84 KA 4232-02: Bridge overlay on the I-70 bridge over the UP Sharon Springs Subdivision west of Dorrance. PCI Roads, LLC, Saint Michael, Mn., $433,900.66

66-11 KA-4987-01: Bridge repair on the eastbound K-66 bridge over the Spring River between Riverton and Galena.  Mission Construction Co. Inc., St. Paul, Ks., $1,058,337.00.

156-5 KA 5041-01: Bridge repair of the K-156 bridge over K-4 and the K&O Hoisington Subdivision east of Claflin. Reece Construction Company Inc., Salina, Ks., $275,633.50.

77-8 KA-5040-01:  Bridge repair of the US 77 bridge over the Walnut River south of Augusta. Repair will be one lane at a time, with one lane of traffic controlled by a temporary traffic signal.  Highway Heavy Repair LLC, Rogers, Mn., $142,064.65.

2-39 KA-5042-01: Bridge repair of the K-2 bridge over Bluff Creek west of Anthony. Traffic to be carried through on one lane controlled by a temporary traffic signal. PBX Corporation & Subsidiary, Sapulpa, Ok., $281,084.17

50-40 KA 4643-02: Guardrail reconstruction at a culvert on US 50 over Doyle Creek 3 miles west of the Harvey/Marion County Line.  J & J Contractors Inc., Iola, Ks., $170,891.30.
96-87 KA 4685-02: Guardrail reconstruction at the K-96/I-235/Meridian interchange in Wichita (Non-FA)  J & J, $495,433.00.

135-40 KA 5037-01: Bridge repair of the Southbound I-135 bridge over 12th Street in Newton.  Reece, $239,417.75.
135-40 KA 5038-01: Bridge repair on Northbound I-135 over Lincoln Boulevard in Hesston. Reece, $335,219.35.

50-78 KA 4687-02: Guardrail reconstruction at the bridge over K-61 southwest of Hutchinson RF Beachner Contractors LLC, Pittsburg, Ks., $80,374.20.
96-83 KA 4690-02: Guardrail reconstruction at two locations in Rush County.  RF Beachner, $296,543.00.
50-93 KA 4688-02: Guardrail reconstruction on three bridges in Stafford. RF Beachner,  $228,855.45

135-87 KA 4910-02: Bridge repair on the southbound Canal Route bridge in Wichita. PBX, $7,052,485.96.

23-35 KA 3995-01: Bridge repair on the K-23 bridge over the Arkansas River south of Cimmaron. PCI Roads, $1,658,990.74.

43 C 4914-01: Grading & bridge: over Sullivan Creek on D Road over Sullivan Creek northwest of Delia. Reece, $299,711.90.

69 C 4920-01: Grading & bridge: over the North Fork Solomon River west of New Almelo. Existing Bridge is a 1929 wood-decked stringer

Non-FA:
35-46 KA 5151-01: Sign Truss replacement near the Old 56 interchange in Olathe. Fulsom Brothers Inc., Cedar Vale, Ks., $45,154.00.

36-66 KA 5196-01: Milling and HMA overlay from Seneca east to the Nemaha/Brown County Line.  Hall Brothers Inc., Marysville, Ks., $2,115,074.32.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#169
Approved Bids Announced 6/6/19
Approved Bids Announded 7/2/19

May, 2019

Federal-Aid (unless otherwise noted):

435-46 KA 4696-02:  Guardrail reconstruction at the 95th Street interchange. Fulsom Brothers Inc., Cedar Vale, $12,695.23.
435-105 KA 4691-02: Guardrail reconstruction between Leavenworth Road and Donahoo Road. Fulsom Brothers, $77,963.75.

44 C 4895-01: Major collector signage upgrade for Fairview Road northeast of Oskaloosa, Hickory Point Road southwest of Winchester, and Westlake Road/74th Street/Clark Road/81st Street between the north end of K-237 and Meridan Signs Up LTD DBA Haren's Trees and Critters, Webster City, IA., $50,896.53.

31-70 KA 4760-01: Reconstruction of Market Street between Martin Street (K-170) and 4th Street in Osage City. Detour via Lakin Street. Smoky Hill LLC., Salina, $1,265,198.10.

75-89 KA 4943-01: Bridge repair of the Eastbound I-70 to northbound US 75 ramp over I-70. Detour by turning around using the Gage Blvd interchange. Access from I-70 to Gage will also be closed, detour via MacVicar and Fairlawn to 6th. PCI Roads, LLC, Saint Michael, Mn., $358,142.00.

89 U 2338-01: Sidewalk improvements in North Topeka

635-105 KA 4693-01: PCCP patching on I-635 between the north end of the bridge over Argentine Yard to 750 feet north of 43rd Street. R A Knapp Construction Inc., Lenexa,  $2,423,443.25.
70-105 KA 4695-01: PCCP patchingon I-70 from Quarry Road to 1/2 mile east of Park Drive.  R A Knapp, $1,838,734.65.
635-105 KA 4940-01:  Bridge repair on the ramps from I-635 to Kansas Avenue over 42nd Street (non-FA)   R A Knapp, $536,078.24.
635-105 KA 4941-01: Bridge repair on the I-635 bridges over Speaker Road (Non-FA) R A Knapp,  $1,163,697.00

31 TE 0458-01: Pedestrian & bicycle paths along 8th Street and Eisenhower Drive in Junction City Bryant & Bryant Construction Inc., Halstead, $582,593.25.

62 U 2330-01: Safe Routes to School project in Beloit.

36-74 KA 4761-01: Reconstruction of State Street from 7th Street to 10th Street in Phillipsburg. Smoky Hill LLC, $992,604.25.

281-4 KA 5242-01: Bridge repair on a bridge in northern Barber County.  PBX Corporation & Subsidiary, Sapulpa, Ok., $120,747.20.

5 C 4869-01: Major collector signage upgrade in eastern Barton County.  Martin Outdoor Enterprises Inc., Pittsburg, $104,700.00.

156-5 KA 5246-01: Bridge repair on the K-156 bridge over Cow Creek in eastern Barton County. Bridges Inc., Newton, $299,816.80.

54-8 KA 5039-01: Bridge repair on the bridge over the BNSF in Augusta  Wildcat Construction Co Inc & Subsidiaries, Wichita, $2,259,165.25.

77-8 KA 5079-01: Bridge repair in Northern Butler County. Traffic to be carried via shoo-fly detour.  B & B Bridge Company LLC, St Paul, Ks., $179,922.00.
54-8 KA 5244-01: Bridge repair over the Walnut River east of El Dorado.  B & B Bridge Company, $531,433.50.

54-8 KA 5243-01: Bridge repair over the Whitewater River west of Augusta.  Bridges Inc., $884,292.75.

77-18 KA 5245-01: Bridge repair over Rock Creek ~ 2.5 miles north of the north junction with K-15.  PBX Corporation, $245,109.07.

19S-73 KA 5249-01: Bridge repair on the K-19 Spur bridge over the Arkansas River south of Larned.  PCI Roads, $1,035,133.14.
56-73 KA 5251-01: Bridge repair on the US 56 bridge over the Pawnee River southwest of Larned.  PCI Roads, $261,999.25.

87 N 0654-01: Replacement of the 61st Street Bridge over Chisholm Creek in Park City. Bridge to be built one half at a time. As the original structure is 4 lanes, one lane in each direction will be carried through, and both directions will not need to share a lane. Dondlinger & Sons Construction Co. Inc., Wichita, $4,002,216.42

44-96 KA-5247-01: Bridge repair on the bridge over the Chikaskia River north of Caldwell. Wildcat, $478,206.20

42 C 4901-01: Major collector signage upgrade in western Hodgeman County. Signs Up,  $34,235.13.

60 C 4899-01: Major collector signage upgrade in Meade County.  Martin Outdoor Enterprises Inc., Pittsburg, Ks., $41,852.50.

65 C 4902-01: Major collector signage upgrade in Northern Morton County Signs Up,  $34,235.13.  $50,287.55.

86 C 4905-01: Major collector signage upgrade in northwestern Scott County Martin Outdoor,  $22,222.00.

71 C 4921-01: Replacement of this Truss Bridge L & M Contractors Inc., Great Bend, Ks., $364,755.75.

30 C 4913-01: Another Truss replacemnt on Pawnee Road northwest of Ottawa. Bryan-Ohlmeier Construction Co. Inc., Paola, $429,979.30

63 C 4918-01: Replacement of this bridge over Hafer Run Creek on 2100 Road between Caldwell and Tyro.  B & B Bridge Company, $381,674.50.

8 C 4909-01: Replacement of this bridge over Fourmile Creek east of Andover. B&B Bridge Company,  $826,376.50.

Non-Federal Aid:
20-7 KA 5260-01: Chip seal on K-20 from US 75 to Horton. Vance Brothers Inc. and Subsidiary, Kansas City, Mo., $297,915.58.

106 KA 5256-01: Storm Sewer pipe repair at various locations in Leavenworth and Wyandotte Counties Leavenworth Excavating & Equipment Company Inc. and Affiliate, Leavenworth, KS., $311,969.00.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

Approved bids for April have been updated. I have no idea what happened with Marc
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#171
Approved Bids Announced 7/2/19
Approved Bids Announced 8/6/19

June, 2019

Federal-Aid:
7-46 KA 5252-01: Bridge repair of the K-7 bridges over K-10 at the K-10 junction. Comanche Construction Inc., Shawnee Mission, $581,967.35.

99-56 KA 5078-01: Bridge repair of the bridge over One Hundred Fourty-Two Mile Creek just north of the US 56 junction near Admire. Bettis Asphalt & Construction
Inc., Topeka, $168,224.00.

70-89 KA 5077-01: Bridge repair of the I-70 bridges over West Union Road west of Topeka. Bettis,  $184,471.25.
70-99 KA 5076-01: Bridge repair of the I-70 bridges over Eskridge/Keene road south of Maple Hill. Bettis, $286,047.45.

77-58 KA 4759-01: Reconstruction of 10th Street (US 77) between Oak Street and Center Street (US 36) in Marysville. Bryant & Bryant Construction Inc., Halstead, $1,433,816.20.

89 TE 0465-01: Bike route improvements in Topeka.  Julius Kaaz Construction Co. Inc., Leavenworth, 1,885,720.00.

15 C 4888-01: Major collector signage upgrade in Cloud County Signs Up LTD DBA Haren's Trees and Critters, Webster City, Ia., $98,895.53.

77-31 KA 3953-01: Bridge repair over Rush Creek near Milford Lake. B & B Bridge Company LLC, St. Paul, Ks., $1,295,015.93

70-31 KA 4986-01: Culvert repair ~ 3 miles west of the US 77 interchange near Junction City. Reece Construction Company Inc., Salina, $376,186.50

70-31 KA 5075-01: Bridge repair at the East/Chestnut Street interchange in Junction City. Bettis, $416,242.00

14-53 KA 5073-01: Bridge repair over Rattlesnakle Creek west of Barnard PCI Roads, LLC, Saint Michael, Mn., $146,429.14.

61-59 KA 5074-01: Bridge repair northeast of Inman. PCI Roads, $313,809.82.

26 C 4894-01: Collector road signage upgrade in Ellis County, generally south of I-70 and west of US 183. Ponderosa I Inc., Wright, Ks., $53,913.00.

99-37 KA 5080-01: Bridge repair of bridge 99-37-32.05 north of Hamilton PCI Roads, $193,672.41.

18 C 4890-01: Collector road signage upgrade, generally in the middle third of Cowley County. Several custom-design signs. Signs Up LTD DBA Haren's Trees and Critters, Webster City, Ia., $146,082.77.

36 C 4892-01: Collector road signage upgrade in Greeley County. Custom design warning and guide signs. Ponderosa I, $53,157.84.

68 C 4903-01: Collector road signage upgrade in Ness County, generally sought of K-18 and west of US 283. Ponderosa I, $21,820.80.

Non Federal-Aid:

106 KA 5238-01: ADA Curb Ramps at the following locations: K-92 in Oskaloosa, US 24 in Wamego, US 24 in Belvue,  US 81B in McPherson, US 281 in Portis, K-18 and US 183 in Plainville, US
183 in Stockton, US 183 in La Crosse in, US 81 in Caldwell, US 81 in South Haven, and K-96 in Dighton. RF Beachner Contractors LLC, Pittsburg, $278,758.00.

83-20 KA 5270-01: Milling and HMA overlay on a short section in Oberlin. McCormick Excavation & Paving LLC, Stratton, Co., $23,374.20.

283-69 KA 5271-01: Milling and HMA overlay in Norton McCormick,  $40,259.00

106 KA 5269-01: Asphalt sample milling at various locations in KDOT district 3. Venture Corporation, Great Bend, Ks., $9,728.00.

400-49 KA 5272-01: Chip seal from the Ford/Kiowa County Line to the US 54 Junction Heft and Sons LLC, Greensburg, Ks., $212,173.15.


27-38 KA 5219-01: Bridge repair on the Arkansas River bridge south of Syracuse
Peace to you, and... don't drive like my brother.

R.P.K.

route56

April and May lettings updated with awarded bids.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#173
Approved Bids announded 8/6/19
Approved Bids announced 9/2/19

July, 2019

Federal-Aid:

24-81 KA 4757-01: Intersection improvement at the intersection of Tuttle Creek Boulevard and Kimbell Drive in Manhattan. Adding Double left turn lanes from Kimball to westbound Tuttle Creek Blvd. and Double right turns from Kimball to Eastbound Tuttle Creek Blvd. Protected left turns on all legs, with protected/permitted right/turns from eastbound Tuttle Creek Blvd to Kimball (five-aspect) and from Kimball to Eastbound Tuttle Creek Blvd. (double FYA) Pavers Inc., Salina, Ks., $881,990.47.

106 KA 5145-01: Lighting at six intersections in Atchison, Jefferson, and Douglas Counties. Phillips Southern Electric Company Inc., Wichita, $195,984.00.

62 U 2330-01: Safe Routes to School sidewalk improvements in Beloit Brummer And Miller Construction, Beloit, Ks., $416,970.55

70-85 KA 5282-01: Pavement marking from Halstead Road to Niles Road near Salina.  Innovative Marking Systems Inc., Bluffdale, Utah, $724,003.30.

47-19 KA 4755-01: Intersection improvement at St. Johns Street (K-47) and Ozark Avenue in Girard Mission Construction Co. Inc., St Paul, Ks., $328,266.51.

59-50 KA 4536-01: Roundabout at the north junction of US 59 and US 160 east of Altamont. Laforge & Budd Construction Company Inc., Parsons, Ks., $3,083,218.92.

78 U 2333-01: Safe Routes to School project in Haven

99 C 4924-01: Replacement of the Headwaters Road bridge over Batch Creek northwest of Harveyville. Existing bridge is a 1920 wood-decked stringer.  King Construction Company Inc. and Subsidiaries, Hesston, (King) $415,808.65.

9 C 4910-01: Replacement of this bridge over Bloody Creek in Chase County. King, $435,647.98.

61 C 4916-01: Replacement of this truss bridge on 263rd Street over North Wea Creek near Louisburg. Bryan-Ohlmeier Construction Co. Inc., Paola, Ks., $508,074.49.

68 C 4919-01: Bridge replacement 3 miles west of US 283  L & M Contractors Inc., Great Bend, Ks., $464,573.75

Non-FA:


75-7 KA 5285-01:  Rumble strips Milling on US 75 between Fairview and Sabetha

81-15 KA 5264-01: Milling and overlay on US 81 between the Ottawa/Cloud county line and US 24. APAC-Kansas Inc. Shears Division, Hutchinson, $734,693.40.

106 KA 5268-01: Crack Sealing on K-28 from K-14 to K-148 and K-148 from K-20 to US 81 in Jewell and Republic Counties Pavement Pro's LLC, McPherson, $145,155.00

70-32 KA 5276-01: Spot milling and HMA overlay on I-70 near Quinter McCormick Excavation & Paving LLC, Stratton, Co., $149,878.00.

160-13 KA 5275-01: Ditch grading on US 160 3 miles west of Ashland.  Stoppel Dirt LLC & Affiliates, Sublette, Ks., $94,963.52.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#174
Approved Bids Announced 9/2/19
Approved Bid Announced 10/4/19

August, 2019

Federal-Aid
192-44 KA 5324-01: Removing and replacing pavement markings on K-192 in Jefferson County.  Century Fence Co., Pewaukee, Wi., $110,638.30
192-52 KA 5325-01: Removing and replacing pavement markings on K-192 in Leavenworth County. Century Fence,  $122,233.89

52 C 4896-01: Major collect signage upgrade on Leavenworth County Road 5 from Tonganoxie to Leavenworth and on County Road 10 from Dempsey Road to County Road 5. Signs Up LTD DBA Haren's Trees and Critters, Webster City, Ia., $28,769.88.

92-52 KA 5323-01: Removing and replacing pavement markings on K-92 from the Jefferson/Leavenworth County Line to 15th Street in Leavenworth. Century Fence, $230,527.46.

66 TE 0462-01: New Sidewalk along 6th Street in Sabetha from Main Street to the Sabetha sports complex. Bryant & Bryant Construction Inc., Halstead, Ks., $301,231.42.

106 KA 5218-01: Bridge repair and navigational painting for the Centennial Bridge (K-92) in Leavenworth and the I-435 Missouri River Bridges in KCK. Comanche Construction Inc., Shawnee Mission, Ks., $422,971.96.

177-9 KA 3943-01: Bridge replacement on the bridge over US 50. Detour via Cottonwood Street in Strong City and US 50. Bridges Inc., Newton, Ks., $2,286,700.94.

177-9 KA 4430-01: Bridge replacement over Fox Creek 3 miles north of Strong City. Traffic to be carried via shoo-fly detour. Bridges Inc., $1,907,168.13.

177-9 KA 4431-01: Bridge replacement over Fox Creek Drainage 5 miles north of Strong City. Traffic to be carried via shoo-fly detour. Bridges Inc., $1,346,389.23.

24-71 KA 5294-01: Surface recycle and chip seal from Alton east to the south junction with US 281. Bettis Asphalt & Construction Inc., Topeka, Ks., $1,272,303.50.

281-84 KA 5290-01: Chip seal from the west junction with K-18 to the east junction with K-18. Heft and Sons LLC, Greensburg, Ks., $269,856.60.

56-5 KA 5289-01: Mill and HMA overlay from Pawnee Rock to Great Bend. Venture Corporation, Great Bend, Ks., $2,146,969.84.

56-80 KA 5287-01: Mill and HMA overlay from Lyons to the Rice/McPherson County Line. APAC-Kansas Inc Shears Division, Hutchinson, Ks., (APAC) $1,935,248.66.

183-83 KA 5288-01: Mill and HMA overlay from the Pawnee/Rush County Line north to LaCrosse Venture,  $2,066,584.48.

Non-FA
106 KA 5379-01: RAP Sample Milling in KDOT Dsitrict 1. Dustrol Inc., Towanda, Ks., $40,255.00.

106 KA 5378-01: RAP Sample Milling in KDOT Dsitrict 2 APAC, $35,443.60.

106 KA 5380-01: RAP Sample Milling in KDOT Dsitrict 4 Dustrol,  $19,780.80

14-80 KA 5286-01: Mill and HMA overlay from Lyons north to the Rice/Ellsworth County Line APAC, $1,877,091.15.

4-83 KA 5327-01: Asphalt crack sealing on K-4 in Rush County. Scodeller Construction Inc., Wixom, Mi., $123,315.77.

106 KA 5326-01: RAP Sample Milling in KDOT Dsitrict 6 Venture,  $12,928.00.