Regional Boards => Mid-South => Topic started by: longhorn on March 25, 2014, 12:05:35 PM

Title: Hwy 36 construction in north Brenham
Post by: longhorn on March 25, 2014, 12:05:35 PM
Why is TxDot putting a light at the north of town at the 36 and business 36/Park street. Why replace an intersection that flows smoothly to a three or four way stop with a stop light..............Idiotic...

This is the only story I could find on the subject, an opinion piece.

http://kwhi.com/highway-36-loop-improvements/
Title: Re: Hwy 36 construction in north Brenham
Post by: jbnv on March 25, 2014, 10:36:00 PM
I'm glad my daughter doesn't live in Bell County any more. I'm quite familiar with that stretch of road. This is regress.
Title: Re: Hwy 36 construction in north Brenham
Post by: US81 on May 23, 2014, 09:13:02 PM
Where US 290 leaves TX 36 is one of the most poorly signed TOTSO's in the state. I would think that would be a higher priority for TxDOT in Brenham.
Title: Re: Hwy 36 construction in north Brenham
Post by: longhorn on April 23, 2018, 11:26:38 AM
From this

https://www.google.com/maps/@30.1911226,-96.4094655,3a,75y,26.55h,93.35t/data=!3m6!1e1!3m4!1sFbloJxN1aMhB1K39zyL9Qg!2e0!7i13312!8i6656

to this

https://www.google.com/maps/@30.1912261,-96.4105497,300a,35y,29.94h,44.91t/data=!3m1!1e3

Went through here yesterday and the new concrete southbound lanes are being used for both traffic directions. Yet the rebuilt northbound lanes apparently is going to stay pavement and not concrete. Cost issue?

https://www.google.com/maps/@30.1813164,-96.4176464,888a,35y,29.94h,44.7t/data=!3m1!1e3
Title: Re: Hwy 36 construction in north Brenham
Post by: TXtoNJ on April 23, 2018, 04:19:48 PM
Can't be anything but maintenance cost savings on a lightly-used overpass.