Complete NC 540 Project

Started by wdcrft63, March 27, 2018, 06:05:36 PM

Previous topic - Next topic

Dirt Roads

Quote from: bob7374 on June 09, 2023, 12:37:36 PM
US 70 East exit ramps from I-40 to be closed this weekend due to crews making connections to new ramps as part of NC 540 extension project:
https://www.ncdot.gov/news/press-releases/Pages/2023/2023-06-09-us-70-exit-close-for-540-project.aspx

Aah.  The detour for Future I-42 involves a routing over NC-42.  Will wonders ever cease?


LM117

“I don’t know whether to wind my ass or scratch my watch!” - Jim Cornette

cowboy_wilhelm

Section B of the the southeast extension was awarded this week as a design-build project. This is the northern portion from Rock Quarry Rd. to I-540/U.S. 64. The proposed completion date is September 20, 2028. Section A from Rock Quarry Rd. to I-40/U.S. 70 is scheduled to be let next month.

Award Letter C204825

Map 1
Map 2
Map 3
Map 4

mvak36

Quote from: cowboy_wilhelm on September 08, 2023, 09:35:59 PM
Section B of the the southeast extension was awarded this week as a design-build project. This is the northern portion from Rock Quarry Rd. to I-540/U.S. 64. The proposed completion date is September 20, 2028. Section A from Rock Quarry Rd. to I-40/U.S. 70 is scheduled to be let next month.

Award Letter C204825

Map 1
Map 2
Map 3
Map 4

Did they say what the completion date would be?
Counties: Counties visited
Travel Mapping: Summary

LM117

Quote from: mvak36 on September 13, 2023, 07:57:45 PM
Quote from: cowboy_wilhelm on September 08, 2023, 09:35:59 PM
Section B of the the southeast extension was awarded this week as a design-build project. This is the northern portion from Rock Quarry Rd. to I-540/U.S. 64. The proposed completion date is September 20, 2028. Section A from Rock Quarry Rd. to I-40/U.S. 70 is scheduled to be let next month.

Award Letter C204825

Map 1
Map 2
Map 3
Map 4

Did they say what the completion date would be?

According to today's NCDOT press release, completion date is 2028. Construction will begin in 2024.

https://www.ncdot.gov/news/press-releases/Pages/2023/2023-09-21-first-contract-awarded-complete540.aspx
“I don’t know whether to wind my ass or scratch my watch!” - Jim Cornette


The Ghostbuster

The article spelled Raleigh wrong. Nevertheless, it will be great to the Southern Wake Expressway segment of NC 540 completed, and construction on the Eastern Wake Expressway segment commencing.

nerdom

Quote from: The Ghostbuster on October 06, 2023, 01:17:14 PM
The article spelled Raleigh wrong. Nevertheless, it will be great to the Southern Wake Expressway segment of NC 540 completed, and construction on the Eastern Wake Expressway segment commencing.

I drive between New Bern and Durham twice a week for work. I'm literally dying for the southern arc to open. Late spring doesn't sound too bad.

1995hoo

Quote from: nerdom on October 08, 2023, 10:02:59 PM
Quote from: The Ghostbuster on October 06, 2023, 01:17:14 PM
The article spelled Raleigh wrong. Nevertheless, it will be great to the Southern Wake Expressway segment of NC 540 completed, and construction on the Eastern Wake Expressway segment commencing.

I drive between New Bern and Durham twice a week for work. I'm literally dying for the southern arc to open. Late spring doesn't sound too bad.

Have you made funeral arrangements yet? Sounds like you won't make it to spring.
"You know, you never have a guaranteed spot until you have a spot guaranteed."
—Olaf Kolzig, as quoted in the Washington Times on March 28, 2003,
commenting on the Capitals clinching a playoff spot.

"That sounded stupid, didn't it?"
—Kolzig, to the same reporter a few seconds later.

nerdom

Cremated and ashes spread from the highest point of the 42/40/540 interchange... only if not completed.

LM117

“I don’t know whether to wind my ass or scratch my watch!” - Jim Cornette

bob7374

Quote from: LM117 on October 18, 2023, 06:17:08 PM
The new Holly Springs Road bridge is expected to open on Oct. 21.

https://www.ncdot.gov/news/press-releases/Pages/2023/2023-10-18-complete540-opening-holly-springs-bridge.aspx
They are also closing I-40 West at (for now) NC 42 Thursday and Friday nights for NC 540 related work:
https://www.ncdot.gov/news/press-releases/Pages/2023/2023-10-19-interstate-40-closure-nc-42.aspx

Meanwhile, the NCDOT traffic map indicates the closure of the ramp from the US 70 Bypass (Future I-42) West to I-40 East that was supposed to end in early September is now planned through the end of the year.

LM117

QuoteOn or around November 14, Donny Brook Road east of Juaquin Lane and west of Reigate Lane is scheduled to reopen to traffic. Detour signs and barricades will be removed, and motorists will once again have full access to the road. The reopening of this road is weather dependent.

https://www.ncdot.gov/news/press-releases/Pages/2023/2023-11-08-complete-540-donny-brook-road-open.aspx
“I don’t know whether to wind my ass or scratch my watch!” - Jim Cornette

cowboy_wilhelm

The last section of 540 was awarded last week. This will complete the loop in 2028.

Award Letter

The Ghostbuster

I had previously heard that the full loop would be completed sometime between 2030 and 2033. I would be very surprised if it were completed by 2028.

orulz

I wish they would widen (and upgrade to Interstate standards) Future I-87 between US64 business in Knightdale and the US64/US264/I-87/I-587 split in Zebulon before finishing 540. That solves a much more existential problem for Eastern Wake than completing 540.

This unflinching commitment to finishing 540 above all else is sucking up too much of our region's transportation money.

bob7374

Quote from: orulz on November 13, 2023, 10:19:36 AM
I wish they would widen (and upgrade to Interstate standards) Future I-87 between US64 business in Knightdale and the US64/US264/I-87/I-587 split in Zebulon before finishing 540. That solves a much more existential problem for Eastern Wake than completing 540.

This unflinching commitment to finishing 540 above all else is sucking up too much of our region's transportation money.
Unfortunately, the latest STIP removed any funding for upgrading and widening US 64/264 meaning, currently, there's no plans for the project to start until after 2033, several years after NC 540 is completed. Perhaps realization of increased traffic and the planned upgrading of US 264 to I-587 east of Zebulon will accelerate the starting of the project in future STIPs.

architect77

Quote from: orulz on November 13, 2023, 10:19:36 AM
I wish they would widen (and upgrade to Interstate standards) Future I-87 between US64 business in Knightdale and the US64/US264/I-87/I-587 split in Zebulon before finishing 540. That solves a much more existential problem for Eastern Wake than completing 540.

This unflinching commitment to finishing 540 above all else is sucking up too much of our region's transportation money.


Isn't there a separation between building a tolled road and allocations for all the other roads in the state?

I would think with sold bonds there would be money right away for I-540 that isn't competing with other road projects for gas-tax generated funding statewide.


bob7374


LM117

“I don’t know whether to wind my ass or scratch my watch!” - Jim Cornette

bob7374


The Ghostbuster

NC 540 is planned to be completed between NC 55 and Interstate 40 this spring. If the whole beltway is indeed completed in 2028, it will have taken 36 years to complete the entire Interstate 540/NC 540 beltway, since construction first started on the Interstate 40-to-US 70 segment (Exit 1AB to Exit 4AB) in 1992.

bob7374


webny99

Quote from: The Ghostbuster on January 19, 2024, 02:32:07 PM
NC 540 is planned to be completed between NC 55 and Interstate 40 this spring.

Great news, is there an expected opening date yet?