Took the day off to get my Virginia REAL ID (pretty painless) and it was a nice day so I went for a little walking tour.
Taken from the S. Abingdon St. bridge over I-395, looking east-northeast. You can see there are still some sound walls that need to be put up (this was part of the Phase II of the I-395 HOT lane conversion).

Taken from the east end of the pedestrian bridge over I-395 at Shirlington. Good shot of a HOT-lane price/information board in a residential area.

Taken from the pedestrian bridge over I-395. When HOT lane conversion work was at its peak, this laydown area was jammed full of vehicles and equipment. Now, next to nothing.

Taken from the pedestrian bridge, looking south/outbound. Good example of the new LED lights for the HOT lanes, whereas the general-purpose lanes still have the orange-hue sodium filament bulbs.

Pedestrian-level view of the new sound walls, from the non-freeway side (S. 31st St.). There used to be trees and shrubberies here acting as the buffer between the local road and the highway.

End of the sound walls on S. 31st Street.
