News:

Thanks to everyone for the feedback on what errors you encountered from the forum database changes made in Fall 2023. Let us know if you discover anymore.

Main Menu

Clermont, Fl: US 27/SR 50 interchange modifications

Started by Brian556, June 23, 2013, 11:52:02 PM

Previous topic - Next topic

Brian556

Google Map Satellite View was recently updated showing this construction. The thing I noticed is that there is no ramp from NB US 27 to EB SR 50, and there is no room for one. How is this movement going to be set up? The only possibility is having traffic use Grand Highway to make the connection, but that would be kinda odd.

Side note/question: Is Grand Highway a former state highway alignment?

http://maps.google.com/maps?hl=en&ll=28.547358,-81.741564&spn=0.006296,0.012521&t=h&z=17


roadman65

Grand Highway will be used as the connection for the missing movement.
Every day is a winding road, you just got to get used to it.

Sheryl Crowe

NE2

http://www.cflroads.com/asset/file/164/Board_Plot_Fill.pdf
The ramp going directly into Grand Highway has already been built.

I don't think Grand Highway was ever a state road. It appears on 1941 aerials but wasn't in any of the definitions through 1939.
pre-1945 Florida route log

I accept and respect your identity as long as it's not dumb shit like "identifying as a vaccinated attack helicopter".

Brian556

I'm wondering why the cloverleaf was necessary. Granted I don't live in the area, but the old configuration looked like a good fit for the location/conditions. The only benefit that I can see is that is eliminates the need for signals at this location.



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.