I have some photos from my trip yesterday with Jason Illyes and mightyace of the TN 840 construction progress. I have the photos on Facebook for now and I have the album set for everyone to see, but if no one can see them let me know and I will post them elsewhere.
TN 840 crossing Boston Theta Road.

Looking west on TN 840 off of Mobley's Cut Rd toward the Natchez Trace Pkwy.

TN 840 bridge construction over the Natchez Trace Pkwy. This view looks north.

Closeup of the steel decking for the EB TN 840 bridge over the Natchez Trace Pkwy. The abutment still needs to be poured.

Looking east on TN 840. Lots of grading work is still needed through here.

It appears these bridges will be post-tensioned concrete bridges. The holes in the bridge at the end are for the cables that will tighten it up once everything is in place. You can see the footing for the abutment with the rebar sticking out of it.

Both TN 840 bridges over the Natchez Trace Pkwy.

Bridge construction for Davis Hollow Rd over TN 840.

Looking at Tn 840 west towards TN 46 off of Davis Hollow Rd.

Looking east on TN 840 at Davis Hollow Rd looking towards the Natchez Trace Pkwy. Where that silver SUV is parked is there is a temporary road for Davis Hollow Rd. It is closed to through traffic but we were able to use it just fine.
